Skip to content

[Task] Record parallel backend delivery and B1–B4 work units #55

Closed

Description

@DavidVFitzGerald

Delivery phase

Workflow / roadmap / environment bootstrap

Goal

Record the maintainer's revised parallel frontend/backend sequence and one issue/PR per backend milestone B1–B4, without implementing backend code.

Context and authority

Maintainer instruction on 2026-11-14. Current PRD §6, specification §§9.2 and 12, ADR 0002, AGENTS.md and roadmap. Prepare a Proposed ADR partially superseding ADR 0002; acceptance still requires approval and merge.

Requirements and constraints

Preserve the ongoing F3–F5 work through an isolated worktree. Keep the frontend mock-only until I1. Record shared-file/runtime ownership, focused MVP validation, and private ZIP input placement. No product implementation, extraction, production action or host installation.

Acceptance criteria

  • ADR and both current documents describe parallel B1–B4 delivery and later integration.
  • Roadmap, role instructions and synchronized Task forms reflect the four backend issue/PR exception.
  • Private input placement is documented and checked against Git ignore rules.
  • Review diff and whitespace; preserve unrelated frontend edits.

Out of scope and follow-ups

Creating/implementing the four backend issues, connecting real adapters, importing inputs and production deployment. B1–B4 retain their scientific/security/publication gates.

Verification plan

Documentation inspection, git diff --check, synchronized Task-form comparison and git check-ignore. No runtime changes; no application tests required.

Dependencies and readiness

No implementation dependencies for preparing this documentation. ADR acceptance requires maintainer approval and merge. Documentation branch: docs/parallel-backend-delivery.

Activity

  1. added
    task
    on Nov 14, 2026
  2. DavidVFitzGerald commented on Nov 14, 2026

    @DavidVFitzGerald
    OwnerAuthor

    Refs #55

    Allow backend milestones B1–B4 to overlap the ongoing mock frontend work using isolated worktrees, separate container resources and coordinated shared-file ownership. Record exactly one implementation issue and one PR per backend milestone, with focused MVP behavior checks and the existing scientific/security/publication gates retained. Integration still waits for Phase 1, B2 and B4.

    Adds proposed ADR 0005 and reconciles the PRD, specification, roadmap, agent guidance and Task forms. Documents the ignored intake directories for the three original provider ZIPs. No backend code, input extraction or runtime changes.

    Validation: git diff --check, byte comparison of the two Task forms, and git check-ignore for all three input paths passed. Application tests are unnecessary for this documentation change. Independent QA and maintainer approval/merge remain pending; ADR 0005 is Proposed, not accepted. Backend implementation and its four issues have not started.

  3. DavidVFitzGerald commented on Nov 14, 2026

    @DavidVFitzGerald
    OwnerAuthor

    QA: PASS

    Reviewed SHA: 77684f86891ce4d8b53f24f8cf18375124257d0e on docs/parallel-backend-delivery, PR #56. Independent documentation QA; no application, mock-auth or real-backend verification is claimed. The reviewed worktree is clean. No application code/tests/criteria were modified by QA.

    • AC1 PASS — proposed ADR 0005, PRD §6 and specification §12 agree on overlapping B1–B4 with F3–F5, one issue/PR per backend milestone, the B1→B2/B3→B4 dependency structure and I1 waiting for Phase 1/B2/B4. Partial supersession of ADR 0002 and acceptance only after approval/merge are explicit.
    • AC2 PASS — roadmap, AGENTS.md, PM/engineering instructions and both Task forms record the four-work-unit exception, isolated worktrees and coordinated shared changes. Frontend ownership and later generated-contract/real-adapter integration are preserved. Focused tests retain §9.2 scientific, security, ingestion and publication gates.
    • AC3 PASS — private ZIP intake directories are documented; all three representative input paths are ignored by Git. Original archives remain unchanged and extraction is deferred to B3.
    • AC4 PASS — commit changes only the 11 expected documentation/form files, including both current requirements documents; no frontend/application/history/reference paths changed. Whitespace validation passed and the isolated worktree leaves ongoing frontend work untouched.

    Exact checks, all exit 0:

    git rev-parse HEAD
    git status --short
    git diff HEAD^ HEAD --check
    cmp docs/issue_templates/task.yml .github/ISSUE_TEMPLATE/task.yml
    git check-ignore data/private/bafu-2026-v1/incoming/xml/source.zip data/private/bafu-2026-v1/incoming/scores/source.zip data/private/bafu-2026-v1/incoming/schema/source.zip
    git diff HEAD^ HEAD --name-only
    gh pr view 56 --json state,headRefOid,isDraft,statusCheckRollup

    Environment: host Git/read-only document inspection, permitted for documentation-only work. No runtime/toolchain or container changes; application tests were not run because this commit changes no runtime behavior. Hosted quality check passed at the reviewed head (run 43614936549, job 132507823718). Zero application tests claimed by this QA.

    Next action: coordinator/maintainer review and explicit approved merge. ADR 0005 remains Proposed and this PASS does not accept it, merge the PR, close the issue or authorize production actions. The latest maintainer implementation request can be handled after reconciling that recorded acceptance gate.

  4. DavidVFitzGerald commented on Nov 14, 2026

    @DavidVFitzGerald
    OwnerAuthor

    QA: PASS

    Re-reviewed SHA: e76a3ed4dfc28f7696f07b73d142cf2ca0c3a12b on PR #56 after merging origin/main. This supersedes the earlier exact-SHA QA evidence.

    Exact commands: git rev-parse HEAD; git status --short; git diff --check origin/main...HEAD; git diff --stat origin/main...HEAD; git diff origin/main...HEAD -- docs/engineering/roadmap.md; git diff 77684f86891ce4d8b53f24f8cf18375124257d0e HEAD -- with all non-roadmap changed documentation/form paths (empty); cmp docs/issue_templates/task.yml .github/ISSUE_TEMPLATE/task.yml; git check-ignore data/private/bafu-2026-v1/incoming/{xml,scores,schema}/source.zip; gh run view 43620703398 --json status,conclusion,jobs. All completed successfully.

    Hosted quality passed for this head: run 43620703398, job 132525511671, including container-backed frozen npm install, format/lint/type/unit/build and critical Chromium/Firefox browser smoke. The optional full browser suite was skipped as intended. Local QA uses permitted host Git/document inspection; no runtime changes or local application tests. No test counts invented or real-backend verification claimed.

    No implementation changes authored by QA. ADR 0005 remains Proposed. Next action: coordinator/maintainer review and explicit approved merge; this verdict does not merge, accept the ADR or close #55.

  5. DavidVFitzGerald commented on Nov 14, 2026

    @DavidVFitzGerald
    OwnerAuthor

    Coordinator: planning complete; sequencing approval pending

    Issue #55 / PR #56 delivered at e76a3ed4dfc28f7696f07b73d142cf2ca0c3a12b on docs/parallel-backend-delivery, isolated worktree /tmp/lca-diff-backend-planning. Independent QA PASS and hosted quality PASS recorded at this SHA. PR is ready for review. No merge performed; ADR 0005 remains Proposed.

    Four complete backend plans published: B1 #57, B2 #58, B3 #59, B4 #60. Exactly one implementation issue/PR per milestone; B1 precedes B2/B3, B4 consumes B3 and B2 visibility. I1 still waits for Phase 1/B2/B4.

    Verified isolated guarded workspace with COMPOSE_PROJECT_NAME=lca-diff-backend-planning FRONTEND_PORT=5187 ./dev up and ./dev check using the same environment. PASS: rootless UID/GID mapping to host UID/GID1000, dropped capabilities/no-new-privileges, eight preflight rejection scenarios, Python3.14.2/uv0.9.30, frozen lock/sync and host-owned 0644 writes. Documentation diff/whitespace, synchronized forms and private path Git ignores passed. No application tests claimed for documentation.

    Next action: explicit maintainer approval/merge of PR #56, then PM readiness for B1 #57 and isolated implementation. Backend implementation has not started. Frontend active checkout and containers remain untouched. Raw ZIPs remain unchanged and unextracted. No deployment/publication authorized or performed.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    task

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions