Repository navigation
Description
Delivery phase
Workflow / roadmap / environment bootstrap — M2.
Goal
Activate Task/Bug GitHub forms and a dependency-linked, PM-groomed frontend backlog covering F1–F5, without starting application implementation.
Context and authority
Read AGENTS.md, docs/team/product-manager.md, docs/issue_templates/task.yml, bug.yml, docs/adr/README.md and docs/engineering/roadmap.md M2/F1–F5. The maintainer explicitly requested the complete frontend backlog now, superseding the earlier small-batch guidance for Phase 1 only. Other MVP phases remain at roadmap level. There were no existing issues/milestones at the start of this setup.
Requirements and constraints
Copy canonical forms to .github/ISSUE_TEMPLATE, keep copies synchronized and include equivalent required sections in CLI-created bodies. Verify labels, create F1–F5 milestones and preserve dependencies/readiness. Use the documented PM role to groom frontend tasks. Publish the prepared branch and PR for review; do not merge without authorization. Only Task and Bug types are needed. Do not hide environment or GitHub plan blockers.
Acceptance criteria
- AC1 — Task/Bug forms exist in .github/ISSUE_TEMPLATE on main, match source files and appear in GitHub's issue chooser; task/bug labels exist.
- AC2 — F1–F5 milestone issues cover all MVP frontend journeys in small session-sized slices with complete Task sections, container verification, spec refs, linked dependencies and ownership/handoffs.
- AC3 — Bootstrap work is recorded accurately, and unresolved environment/dependency gates are labeled/commented blocked rather than ready.
- AC4 — PR handoff template and a roadmap-linked GitHub issue index exist, with a reviewable PR and exact published references.
- AC5 — Inspect branch-protection availability and track the reported plan limitation separately; do not require nonexistent CI checks. Frontend implementation becomes ready only after #1 and #2 gates are satisfied.
Out of scope and follow-ups
No frontend implementation or backend issues in this setup. Container runtime work is #2; baseline approval is #1. Native review protection is #4. Frontend implementation starts at #5 after readiness gates; later phases remain milestone-level in the roadmap.
Verification plan
Inspect GitHub issues/milestones/labels via gh issue list, gh api and gh label list. Compare source/active forms byte-for-byte, inspect required Markdown sections and ensure all dependency links resolve without cycles. Verify PR and default-branch issue chooser after approved merge. Run git diff --check for local docs/config. These are GitHub/documentation checks, not container/application tests; no host installs.
Dependencies and readiness
Planning/publication is explicitly authorized despite M1's Docker blocker. Final activation/implementation readiness is BLOCKED on #1 review/merge, #2 runtime gate, and default-branch form verification. No PM READY or QA PASS is implied by issue creation.
Post-merge activation handoff — 2026-11-13
PM: READY for the bounded final activation/evidence work. PR #35 merged at f809b17; #2 already had independent runtime/editor QA PASS.
Engineering: READY FOR QA delivered on docs/m2-activation at cde218f. Follow-up PR: #36. ADR acceptance metadata, roadmap and frontend issue index now reflect the merge. Detailed evidence is in docs/engineering/m2-verification.md. The maintainer confirmed both Task and Bug visible in the rendered chooser; that is user-provided evidence, not agent-observed browser interaction.
QA: PASS at cde218f, independently verified after implementation. AC1: merged form blobs/source copies and labels match; maintainer chooser confirmation. AC2: 30 tasks, expected milestone counts 6/5/4/7/8, required sections/labels present and acyclic predecessor graph. AC3: bootstrap/merge attribution accurate. AC4: merged templates/index and follow-up PR verified. AC5: protection limitation remains tracked in #4; repository currently public and main protection returns HTTP 404. No settings changed in this session.
Commands/evidence: source/active cmp checks, GitHub Contents API at ref=main, gh pr view 35, issue/milestone/label inspection, and git diff --check origin/main cde218f passed. Documentation-only work: no application test or new runtime verification claimed; rootless Docker availability confirmed without installing host dependencies.
This handoff supersedes the historical pending-merge/chooser blockers above. Keep #3 open until PR #36 is reviewed and merged; then re-groom #5 as the first frontend implementation task. No issue closure or merge is authorized by this handoff.
Activity
DavidVFitzGerald commentedon Nov 13, 2026
Bootstrap tracking: this issue was created after the prepared work it records. Current status: BLOCKED; see dependencies and readiness.
Dependencies: #1, #2. No application QA, environment PASS or approved merge is claimed. Follow AGENTS.md and the linked role instructions; keep this issue open until the recorded gates are satisfied.
DavidVFitzGerald commentedon Nov 13, 2026
M2 handoff: BLOCKED on final activation/readiness
Published and verified:
Pending: approve/merge the baseline (#1), then verify Task/Bug in the default-branch issue chooser; resolve and verify the actual container runtime/lock gate (#2). The private-repository branch-protection plan restriction is tracked separately in #4. No issue was closed, no main merge/host install/application implementation occurred, and no nonexistent CI check was marked successful. Start frontend work at #5 only after the recorded preparation/dependency gates are satisfied.
Validation: source/active form byte comparisons and git diff --cached --check passed; Docker runtime/application tests not run. Coordinator/PM should recheck actual gates before READY, then use Engineer → independent QA handoffs per AGENTS.md.
docs: link M2 review PR from frontend backlog (Refs #3)
docs: record maintainer-verified issue chooser activation (Refs #3)
docs: reconcile merged bootstrap and M2 activation gates (Refs #3)
docs: record maintainer-verified issue chooser activation (Refs #3)