Skip to content

fix(telemetry): data race on SumReaderCloser#4076

Merged
dd-mergequeue[bot] merged 1 commit into
mainfrom
eliottness/telemetry-datarace
Oct 27, 2025
Merged

fix(telemetry): data race on SumReaderCloser#4076
dd-mergequeue[bot] merged 1 commit into
mainfrom
eliottness/telemetry-datarace

Conversation

@eliottness

Copy link
Copy Markdown
Contributor

What does this PR do?

Fix data race: https://github.com/DataDog/dd-trace-go/actions/runs/18784388569/job/53599447492?pr=4071#step:6:241

Reviewer's Checklist

  • Changed code has unit tests for its functionality at or near 100% coverage.
  • System-Tests covering this feature have been added and enabled with the va.b.c-dev version tag.
  • There is a benchmark for any new code, or changes to existing code.
  • If this interacts with the agent in a new way, a system test has been added.
  • New code is free of linting errors. You can check this by running ./scripts/lint.sh locally.
  • Add an appropriate team label so this PR gets put in the right place for the release notes.
  • Non-trivial go.mod changes, e.g. adding new modules, are reviewed by @DataDog/dd-trace-go-guild.

Unsure? Have a question? Request a review!

@eliottness
eliottness requested a review from a team as a code owner October 27, 2025 15:16
@eliottness

Copy link
Copy Markdown
Contributor Author

/merge

@dd-devflow-routing-codex

dd-devflow-routing-codex Bot commented Oct 27, 2025

Copy link
Copy Markdown

View all feedbacks in Devflow UI.

2025-10-27 15:17:11 UTC ℹ️ Start processing command /merge


2025-10-27 15:17:20 UTC ℹ️ MergeQueue: waiting for PR to be ready

This merge request is not mergeable according to GitHub. Common reasons include pending required checks, missing approvals, or merge conflicts — but it could also be blocked by other repository rules or settings.
It will be added to the queue as soon as checks pass and/or get approvals.
Note: if you pushed new commits since the last approval, you may need additional approval.
You can remove it from the waiting list with /remove command.


2025-10-27 15:46:30 UTC ℹ️ MergeQueue: merge request added to the queue

The expected merge time in main is approximately 18m (p90).


2025-10-27 16:04:35 UTC ℹ️ MergeQueue: This merge request was merged

@pr-commenter

pr-commenter Bot commented Oct 27, 2025

Copy link
Copy Markdown

Benchmarks

Benchmark execution time: 2025-10-27 15:26:19

Comparing candidate commit 139f6f3 in PR branch eliottness/telemetry-datarace with baseline commit 399a58b in branch main.

Found 0 performance improvements and 0 performance regressions! Performance is the same for 24 metrics, 0 unstable metrics.

@dd-mergequeue
dd-mergequeue Bot merged commit eed890e into main Oct 27, 2025
244 checks passed
@dd-mergequeue
dd-mergequeue Bot deleted the eliottness/telemetry-datarace branch October 27, 2025 16:04
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants