Skip to content

chore(go.mod): upgrade go-libddwaf#3980

Merged
dd-mergequeue[bot] merged 1 commit into
mainfrom
eliottness/instrumentation-appsec
Sep 19, 2025
Merged

chore(go.mod): upgrade go-libddwaf#3980
dd-mergequeue[bot] merged 1 commit into
mainfrom
eliottness/instrumentation-appsec

Conversation

@eliottness

@eliottness eliottness commented Sep 19, 2025

Copy link
Copy Markdown
Contributor

What does this PR do?

Add instrumentation/appsec to the @DataDog/asm-go ownership

Motivation

This was probably removed inadvertently at some point

Reviewer's Checklist

  • Changed code has unit tests for its functionality at or near 100% coverage.
  • System-Tests covering this feature have been added and enabled with the va.b.c-dev version tag.
  • There is a benchmark for any new code, or changes to existing code.
  • If this interacts with the agent in a new way, a system test has been added.
  • New code is free of linting errors. You can check this by running ./scripts/lint.sh locally.
  • Add an appropriate team label so this PR gets put in the right place for the release notes.
  • Non-trivial go.mod changes, e.g. adding new modules, are reviewed by @DataDog/dd-trace-go-guild.

Unsure? Have a question? Request a review!

@eliottness
eliottness requested a review from a team as a code owner September 19, 2025 08:57
@eliottness

Copy link
Copy Markdown
Contributor Author

/merge

@dd-devflow-routing-codex

dd-devflow-routing-codex Bot commented Sep 19, 2025

Copy link
Copy Markdown

View all feedbacks in Devflow UI.

2025-09-19 09:00:16 UTC ℹ️ Start processing command /merge


2025-09-19 09:00:26 UTC ℹ️ MergeQueue: waiting for PR to be ready

This merge request is not mergeable yet, because of pending checks/missing approvals. It will be added to the queue as soon as checks pass and/or get approvals.
Note: if you pushed new commits since the last approval, you may need additional approval.
You can remove it from the waiting list with /remove command.


2025-09-19 09:17:16 UTC ℹ️ MergeQueue: merge request added to the queue

The expected merge time in main is approximately 16m (p90).


2025-09-19 09:30:07 UTC ℹ️ MergeQueue: This merge request was merged

@pr-commenter

pr-commenter Bot commented Sep 19, 2025

Copy link
Copy Markdown

Benchmarks

Benchmark execution time: 2025-09-19 09:12:22

Comparing candidate commit 557a2c3 in PR branch eliottness/instrumentation-appsec with baseline commit 3119b73 in branch main.

Found 0 performance improvements and 0 performance regressions! Performance is the same for 24 metrics, 0 unstable metrics.

@dd-mergequeue
dd-mergequeue Bot merged commit 25d82fd into main Sep 19, 2025
245 checks passed
@dd-mergequeue
dd-mergequeue Bot deleted the eliottness/instrumentation-appsec branch September 19, 2025 09:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants