Skip to content

🧪 test(ci): pinned multi-Engine integration matrix - #209

Merged
scttbnsn merged 1 commit into
dev/v1.6from
feat/187-engine-matrix
Aug 9, 2026
Merged

scttbnsn merged 1 commit into
dev/v1.6from
feat/187-engine-matrix

Conversation

@scttbnsn

@scttbnsn scttbnsn commented Aug 9, 2026

Copy link
Copy Markdown
Contributor

Closes #187 (deferred from #153's audit).

New weekly + dispatchable workflow running the -tags=integration suite against pinned Docker Engine releases — v26.1.4 / v28.0.4 / v29.2.1 / v29.7.2 — via docker/setup-docker-action, so API-version drift gets caught by CI instead of only the monthly api-version-watch page scrape.

Details worth knowing:

  • The job resolves the daemon socket from the active docker context (setup-docker-action doesn't necessarily serve on /var/run/docker.sock) and fails loudly if the daemon that came up isn't the requested version, so no leg can silently test the runner's stock dockerd.
  • pull_request trigger is scoped to the workflow file itself, so this PR exercises the full matrix and it otherwise costs nothing per-PR. The fast single-daemon path in quality-integration.yml is unchanged.
  • fail-fast is off; drift usually lands in one minor first and the other legs' results matter.

actionlint clean.

Weekly + dispatchable job running the -tags=integration suite against
pinned Docker Engine releases (26.1 / 28.0 / 29.2 / 29.7) via
docker/setup-docker-action, so API-version drift is caught by CI rather
than the monthly api-version-watch page scrape alone. Verifies the pinned
daemon actually took before trusting a leg, and self-tests on any PR that
touches the workflow file.

Closes #187
@vercel

vercel Bot commented Aug 9, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
sockguard-website Ready Ready Preview Aug 9, 2026 12:46am

@coderabbitai

coderabbitai Bot commented Aug 9, 2026

Copy link
Copy Markdown

Warning

Review limit reached

@scttbnsn, you've reached your PR review limit, so we couldn't start this review.

Next review available in: 59 minutes

You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository.

How can I continue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews.

How do review limits work?

CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability.

For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window.

Please refer docs for additional details.

Review details
⚙️ Run configuration

Configuration used: Path: .coderabbit.yaml

Review profile: CHILL

Plan: Pro Plus

Run ID: ab8ac2f4-6228-4213-9006-d918aae6830b

📥 Commits

Reviewing files that changed from the base of the PR and between db8c738 and b258a39.

📒 Files selected for processing (1)
  • .github/workflows/quality-integration-engines.yml

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@scttbnsn
scttbnsn merged commit b22c790 into dev/v1.6 Aug 9, 2026
43 checks passed
@scttbnsn
scttbnsn deleted the feat/187-engine-matrix branch August 9, 2026 01:08
scttbnsn added a commit that referenced this pull request Aug 9, 2026
Single sync commit on top of main carrying the dev/v1.6 tip tree (9d8ea57):
🔒 security(exec): bounded exec-inspect response decode (#208)
🧪 test(integration): portwing/drydock preset conformance suites (#210)
🧪 test(ci): weekly engine-matrix integration workflow (#209)
🔧 config(ci): fuzz deadline-flake retry (#207)
🔧 chore(conformance): mktemp scratch dir + live /events + trigger contracts (#206, #212)
🔧 chore(release): GA promotion — changelog, README, chart, website (#213)
scttbnsn added a commit that referenced this pull request Aug 9, 2026
Single sync commit on top of main carrying the dev/v1.6 tip tree (de8015b):
🔒 security(exec): bounded exec-inspect response decode (#208)
🧪 test(integration): portwing/drydock preset conformance suites (#210)
🧪 test(ci): weekly engine-matrix integration workflow (#209)
🔧 config(ci): fuzz deadline-flake retry + exit-status propagation (#207, #215)
🔧 chore(conformance): mktemp scratch dir + live /events + trigger contracts (#206, #212)
🔧 chore(release): GA promotion — changelog, README, chart, website (#213, #215)
scttbnsn added a commit that referenced this pull request Aug 9, 2026
Single sync commit on top of main carrying the dev/v1.6 tip tree (de8015b):
🔒 security(exec): bounded exec-inspect response decode (#208)
🧪 test(integration): portwing/drydock preset conformance suites (#210)
🧪 test(ci): weekly engine-matrix integration workflow (#209)
🔧 config(ci): fuzz deadline-flake retry + exit-status propagation (#207, #215)
🔧 chore(conformance): mktemp scratch dir + live /events + trigger contracts (#206, #212)
🔧 chore(release): GA promotion — changelog, README, chart, website (#213, #215)

This branch was successfully deployed

1 active deployment
Preview — b258a398 Deployed Aug 9, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant