Skip to content

release: sync dev/v0.9 to main for v0.9.4 - #93

Merged
scttbnsn merged 5 commits into
mainfrom
dev/v0.9
Aug 12, 2026
Merged

scttbnsn merged 5 commits into
mainfrom
dev/v0.9

Conversation

@scttbnsn

@scttbnsn scttbnsn commented Aug 12, 2026 •

Copy link
Copy Markdown
Contributor

Release sync ahead of the v0.9.4 cut. Four commits:

Why this is worth landing promptly. The three quality workflows fire their scheduled runs with headBranch: main, so until this merges they keep running with the exit-code masking still in place. Next soak is around 2026-08-16; next bench and mutation around 2026-09-01.

Two release-cut dispatches earlier today (02:13Z run 31556180258, and 02:58Z) both failed at "Validate CHANGELOG entry for release tag" because they were dispatched from main, which had no v0.9.4 section. That gate worked as designed. This sync is what clears it.

Changelog

  • 🔧 Changed commit-message validation to block merges when validation fails.
  • 🐛 Fixed failure masking in benchmark, soak, and mutation workflows by using Bash with pipefail behavior.
  • 🔒 Updated Grype suppressions and reduced them from 18 to 9.
  • 🔧 Corrected README badges and the image-size claim to approximately 47 MB.
  • ✨ Added the v0.9.4 CHANGELOG entry.

Concerns

  • Verify that the remaining Grype suppressions match only the intended legacy Docker vulnerabilities.
  • Verify that scheduled workflows execute from main after the sync.

Removes the dead Go Report Card badge, adds the quality-integration badge, and replaces the ~10 MB image-size claim with the measured 47 MB.
The commit-message job carried continue-on-error and only emitted a ::warning::, so it could never fail. It now errors and exits non-zero.

Nine grype suppressions were removed after verifying against the current Wolfi docker-compose binary that the vulnerable versions are gone; the five that still match have no fix on the legacy docker/docker import path and were renewed to 2026-11-15.
)

GitHub Actions' default shell is `bash -e {0}` — -e but no -o pipefail — so
a step ending in `| tee` reports tee's exit code, not the command's. The
benchmark, soak, and Gremlins jobs have all been reporting green regardless of
what they actually did.

`shell: bash` gets `-o pipefail`, so these three now fail when the work
fails. The upload steps already carry `if: always()`, so the output of a
newly-failing run still gets published. Same fix sockguard took in #241; the
fuzz jobs were already correct because they return ${PIPESTATUS[0]} by hand.
release-cut refuses to tag a version the CHANGELOG doesn't describe, so the
two dispatches this morning both died at the validate step. This writes up
what's actually sitting on dev/v0.9 since v0.9.3: the tee/pipefail masking
fix, the commit-message gate that could never fail, the grype suppression
re-review, and the README badge corrections.

Landing this unblocks the cut, which matters beyond the release itself —
the monthly and weekly quality jobs run against main, so they keep running
with the masking bug until dev/v0.9 syncs across.
@vercel

vercel Bot commented Aug 12, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
getportwing Ready Ready Preview Aug 12, 2026 5:59pm

@scttbnsn

Copy link
Copy Markdown
Contributor Author

@coderabbitai review

@coderabbitai

coderabbitai Bot commented Aug 12, 2026 •

Copy link
Copy Markdown
⚠️ Action not completed

No files to review.

Note: CodeRabbit is an incremental review system and does not re-review already reviewed commits. This command is applicable only when automatic reviews are paused.

@coderabbitai

coderabbitai Bot commented Aug 12, 2026 •

Copy link
Copy Markdown

Review Change Stack

📝 Walkthrough

Walkthrough

The commit-message validation job now fails the CI workflow for invalid messages. The benchmark, mutation-testing, and soak workflows explicitly use Bash to preserve failures through tee pipelines. Grype ignores now document removed exceptions and retain five legacy Docker findings with review deadlines. The README updates the reported image size to approximately 47 MB, adds the Integration Tests CI badge, and removes the Go Report Card badge.

Possibly related PRs

🚥 Pre-merge checks | ✅ 2
✅ Passed checks (2 passed)
Check name Status Explanation
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.
✨ Finishing Touches 💡 1
🛠️ Fix failing CI checks 💡
  • Create stacked PR
  • Commit on current branch
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch dev/v0.9

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@biggest-littlest biggest-littlest left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Release sync, four commits, all already reviewed on the way into dev/v0.9. Diff is the same four files plus the CHANGELOG.

@ALARGECOMPANY ALARGECOMPANY left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Verified main..dev is the expected four commits and nothing else.

@scttbnsn
scttbnsn merged commit bab5aa3 into main Aug 12, 2026
59 of 64 checks passed

@coderabbitai coderabbitai Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Actionable comments posted: 2

🤖 Prompt for all review comments with AI agents
Verify each finding against current code. Fix only still-valid issues, skip the
rest with a brief reason, keep changes minimal, and validate.

Inline comments:
In @.grype.yaml:
- Around line 59-60: Add a verifier that parses review dates from `.grype.yaml`
exception reason strings and fails when any deadline has expired; ensure
malformed or missing deadlines are handled consistently with the repository’s
validation conventions. Invoke this check in the workflow immediately before
both Grype scan steps so neither scan proceeds with stale vulnerability
exclusions.
- Around line 55-58: Update the audit summary in the .grype configuration to
distinguish GHSA-x744-4wpc-v9h2: retain its ignore for Wolfi’s shipped
github.com/docker/docker v28.5.2+incompatible package, but state that the
advisory is fixed on the docker path at v29.3.1 and that this fix is unavailable
in the shipped version. Restrict the “no fix on the legacy path” wording to the
remaining four advisories.
🪄 Autofix

Fix all unresolved CodeRabbit comments on this PR:

  • Push a commit to this branch (recommended)
  • Create a new PR with the fixes

ℹ️ Review info
⚙️ Run configuration

Configuration used: Path: .coderabbit.yaml

Review profile: CHILL

Plan: Pro Plus

Run ID: 8fb1c12b-5d39-4590-ae79-1be8a6c7d0e6

📥 Commits

Reviewing files that changed from the base of the PR and between 66053e1 and c295eb5.

⛔ Files ignored due to path filters (1)
  • CHANGELOG.md is excluded by !CHANGELOG.md
📒 Files selected for processing (6)
  • .github/workflows/ci.yml
  • .github/workflows/quality-bench-monthly.yml
  • .github/workflows/quality-mutation-monthly.yml
  • .github/workflows/quality-soak-weekly.yml
  • .grype.yaml
  • README.md

Comment thread .grype.yaml Resolved
Comment thread .grype.yaml Resolved

This branch was successfully deployed

1 active deployment
Preview — 8d996272 Deployed Aug 12, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants