Skip to content

Bound session-end close preparation by its shared deadline - #1044

Merged
zlareb1 merged 16 commits into
mainfrom
fix/sessionend-close-budget
Nov 20, 2026
Merged

zlareb1 merged 16 commits into
mainfrom
fix/sessionend-close-budget

Conversation

@zlareb1

@zlareb1 zlareb1 commented Nov 20, 2026 •

Copy link
Copy Markdown
Member

Changelog category

  • Bug Fix

Changelog entry

Session-end run completion deducts body preparation from its shared request deadline and omits a close request after that deadline expires.

Why

A retried run begin and its close share one deadline. Calculating the close timeout before transcript and state preparation let that preparation extend the request budget. The minimum timeout could also admit an expired request.

Scope and risk

The hook calculates the remaining budget immediately before sending the close. An exhausted budget sends no close; a positive budget is capped by the configured request timeout. Existing authentication, redaction, run identity and state ownership checks apply. Both plugin manifests advance to version 1.2.45 and ship the same hook.

Controlled-clock subprocess tests cover no preparation delay, preparation leaving a positive budget, and preparation exhausting the deadline. They mock clock, state-write cost and transport without contacting a server. The existing session-end timing assertion is retained. The merged cleanup fixtures preserve the current placement HTTP clock accounting and directory deadline controls.

Compatibility, rollout and rollback

  • Wire and configuration: none.
  • Operator steps: none.
  • Rollback: revert the hook, mirrored copy and paired plugin version change. No stored data changes.

Tests

  • Historical fail-first controls: both delayed-preparation cases failed before the hook change; the zero-delay control passed. All three cases passed after the change.
  • The earlier hosted session-end timing failure remains unexplained; the controlled cases establish deadline arithmetic.
  • Focused deadline checks pass on the final source: five passing tests across the existing session-end case and three preparation controls. Plugin mirror generation, hook/test syntax and diff whitespace checks pass.
  • Complete hosted CI passes on this head: all four workflows and all 56 rollup entries succeed, including native platform, unit, integration, coverage and mixed-version gates.

Focused reproduction: node --test --test-name-pattern='close admission deducts preparation' integrations/claude-code-plugin/tests/run-id-stash.test.mjs.

AI assistance in the code

  • AI-generated: Codex implemented the deadline fix, controlled-clock tests and mirrored hook.

  • I can explain every line of this diff and how it interacts with the rest of Loom.

Checklist

  • Existing deadlines, timing values and assertions are retained.
  • Both plugin manifests and generated hook copies agree.
  • Commits are signed off.
  • Focused checks and full hosted CI pass on the final head.

@vercel

vercel Bot commented Nov 20, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
loom-docs Ready Ready Preview Nov 20, 2026 8:25pm UTC

Request Review

Use one idle-driven clock for the mock exchange timers and owned close. Keep the six cases and their bounds, with a private-loop task census at teardown.

Signed-off-by: zlareb1 <[email protected]>
(cherry picked from commit e1f47e6)
@zlareb1
zlareb1 force-pushed the fix/sessionend-close-budget branch from 44ff1b4 to 6d9f905 Compare November 20, 2026 13:55
zlareb1 and others added 14 commits November 20, 2026 15:09
* Serve documentation from the docs subpath

The documentation build keeps its links, assets, and discovery files below the configured path.

Signed-off-by: Shaun Struwig <[email protected]>

* Trigger documentation preview

Signed-off-by: Shaun Struwig <[email protected]>

* Redirect documentation preview root

Preview deployments open the documentation path when their root URL is requested.

Signed-off-by: Shaun Struwig <[email protected]>

* Placement deadline tests use one simulated clock

Work deadlines, cleanup, and the elapsed-time assertion use one private clock.
The selector advances it when the loop waits, so scheduler pauses cannot expire
a simulated reply or consume its cleanup allowance. Keep all six cases and
their duration bounds, and fail teardown if the private loop retains a task.

Signed-off-by: Lareb Zafar <[email protected]>

---------

Signed-off-by: Shaun Struwig <[email protected]>
Signed-off-by: Lareb Zafar <[email protected]>
Co-authored-by: Lareb Zafar <[email protected]>
* memory.ask matches bridge slugs literally

Escape LIKE metacharacters so slug underscores cannot select another subject.

Signed-off-by: Lareb Zafar <[email protected]>

* Expect literal bridge slugs in the governed-conflict test

The namespace regression must assert the escaped pattern used by the subject filter.

Signed-off-by: Lareb Zafar <[email protected]>

---------

Signed-off-by: Lareb Zafar <[email protected]>
Selected durations alone omit worker allocation and collection state. Attach numeric context after the original assertion fails so the cost calls and decision remain unchanged.

Signed-off-by: zlareb1 <[email protected]>
…1021)

* Document memory selection for coding agents and software factories

Give the existing use-case pages distinct search titles and concrete recall, isolation and evidence-handoff checks without claiming comparative results.

Signed-off-by: zlareb1 <[email protected]>

* Format coding-agent and factory memory selection tables

Signed-off-by: zlareb1 <[email protected]>

---------

Signed-off-by: zlareb1 <[email protected]>
* Document memory write and worker progress regression tests

Exercise derived effects, stored cursors and complete SQL rows so regression checks observe the boundaries they claim to protect.

Signed-off-by: Lareb Zafar <[email protected]>

* Test warm worker passes beside cursor restarts

A restart can recover a missed boundary event through cold reconciliation, so the guide must retain warm continuation regressions.

Signed-off-by: Lareb Zafar <[email protected]>

* Concurrency tests cover changed content at an equal version

Signed-off-by: Lareb Zafar <[email protected]>

* Document committed-write cleanup and private cache regression tests

Cancellation during fence release must not skip effects owed by an acknowledged
write. Caches of private strings need retention and erasure coverage as well as
result checks.

Signed-off-by: Lareb Zafar <[email protected]>

---------

Signed-off-by: Lareb Zafar <[email protected]>
* Framework examples select matching SDK artifacts

Signed-off-by: zlareb1 <[email protected]>

* Framework examples install matching published SDKs

Select available stable artifacts and their native peers, keeping DSPy on its matching checkout. Give the invalid-identity fixture its own product clock so semantic closure assertions do not spend real phase time. Preserve all real deadline and cancellation cases.

Signed-off-by: zlareb1 <[email protected]>

---------

Signed-off-by: zlareb1 <[email protected]>
* Pin retriever installation to available SDK packages

Signed-off-by: zlareb1 <[email protected]>

* LangChain examples select published SDK artifacts

Install the matching stable SDKs and the declared native peer. Validation fixtures establish a post-exec witness and completed backend termination before checking successor ownership.

Reuses the complete published witness repair from 9ffae96 (#1046).

Signed-off-by: zlareb1 <[email protected]>

---------

Signed-off-by: zlareb1 <[email protected]>
Related: #776

### Changelog category

- Improvement

### Changelog entry

Cell checks share topology, catalog and synchronization helpers across command and server code.

### Why

Complete cell reads depend on topology validation, the caller's effective privileges, replica identity and synchronization. These implementations live in CLI modules, which server code cannot import. Shared owners let both layers use the same checks without copying them.

### Scope and risk

The complete topology module moves to `server/core/cell_ch.py`. Catalog, grant, default-role, row-policy and replica checks move to `server/insights/store/cell_catalog.py`; synchronization and budget helpers move to `server/core/cell_sync.py`. Callers and test patch points use those owners, and the old topology module is deleted.

SQL, query settings and tags, defaults, refusal conditions, exception identity, row interpretation and ordinary update behavior remain unchanged. A missed caller import or patch point is the main risk. Bounded participant and observation joins remain unimplemented; this extraction adds no later-cell activation or readiness result.

The configuration and placement foundation is merged. Its raw connection ownership, retirement admission, typed configuration refusal, deadlines and cleanup remain intact when the shared imports compose with it.

### Compatibility, rollout and rollback

- Wire and defaults: unchanged; no operations, arguments, settings, tables or stored encodings are added.
- Operator steps: none.
- Rollback: reverting restores the former internal owners and callers; there is no stored data transition.
- The English architecture page names the shared topology owner. Existing translated code references await the normal translation workflow; translated files are unchanged.

### Tests

- Static bindings retain all 37 moved definitions, all 574 audited test assertions and the single unique moved topology assertion. The merged foundation's 577 assertions in the audited test modules remain in source order, with only the sixteen existing shared-owner reference substitutions. Production assertion relocations retain their conditions and multiplicity. The older reported total counted the moved topology assertion in both source images; no assertion was removed.
- The local attempt to run sixteen directly related pure selectors is refused before a test child starts because admission detects an unknown test process. No current test pass is claimed. Source and Git state match before and after the refusal. The same selectors historically pass as 34 parameterized cases on the earlier source, covering complete replica union, topology and synchronization refusal, privileges, caller identity, row policies, extra replicas, streaming failures and budget behavior. Those passes retain their original source attribution.
- Current scoped Ruff checks and formatting checks pass for all 25 changed Python files, and the concern diff passes whitespace checks. The earlier focused attempt lacking its complete source snapshot remains invalid; its passing output is not used as evidence. Historical focused passes retain their original source attribution.
- The actual merged-parent adoption resolves one import conflict while retaining both shared refusal owners and the existing retirement implementation. Static comparison with the later target finds no concern-path overlap or new production coupling; unrelated target advancement alone does not require a source refresh.
- Final-head hosted CI reports 54 successful checks and two expected documentation publication skips. Both Postgres versions complete the native, standby, authenticated-isolation and ordered-reconciliation phases. Mixed-version checks pass. Cell acceptance passes the unchanged latency and throughput requirements, with provenance and cleanup receipts. Fresh independent entire pushed-source review reports no findings or nits. These results apply to this extraction; bounded census joins remain separate work.

### AI assistance in the code

- AI-generated: Codex wrote this change. Independent final-source review and required hosted gates remain mandatory.

- [x] I can explain every line of this diff and how it interacts with the rest of Loom.

### Checklist

- [x] Scoped static checks pass; the refused local test attempt is recorded as unrun.
- [x] Required final-head GitHub CI and fresh whole-source review pass.
- [x] Documentation names the shared owner; generated translations are unchanged.
- [x] No migration or stored data change is introduced.
- [x] Commits are signed off.
Compose rendering and transport observation so the privacy marker reaches protection before the next automatic write.

Signed-off-by: zlareb1 <[email protected]>
Preserve the current cleanup fixtures and publish both hook copies at an unused plugin version.

Signed-off-by: zlareb1 <[email protected]>
@zlareb1
zlareb1 merged commit a3a82c0 into main Nov 20, 2026
56 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants