Skip to content

Backport #72872 to 24.11: Fix revoke of implicit grants - #73320

Merged
pufit merged 1 commit into
24.11from
backport/24.11/72872
Dec 19, 2024
Merged

pufit merged 1 commit into
24.11from
backport/24.11/72872

Conversation

@robot-ch-test-poll

Copy link
Copy Markdown
Contributor

Original pull-request #72872
Cherry-pick pull-request #73319

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

@robot-ch-test-poll robot-ch-test-poll added pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-bugfix Pull request with bugfix, not backported by default labels Dec 14, 2024
@robot-clickhouse-ci-2

robot-clickhouse-ci-2 commented Dec 14, 2024 •

Copy link
Copy Markdown
Contributor

This is an automated comment for commit d890e72 with description of existing statuses. It's updated for the latest CI running

❌ Click here to open a full report in a separate page

Check nameDescriptionStatus
Integration testsThe integration tests report. In parenthesis the package type is given, and in square brackets are the optional part/total tests❌ failure
Successful checks
Check nameDescriptionStatus
BuildsThere's no description for the check yet, please add it to tests/ci/ci_config.py:CHECK_DESCRIPTIONS✅ success
Compatibility checkChecks that clickhouse binary runs on distributions with old libc versions. If it fails, ask a maintainer for help✅ success
Docker keeper imageThe check to build and optionally push the mentioned image to docker hub✅ success
Docker server imageThe check to build and optionally push the mentioned image to docker hub✅ success
Install packagesChecks that the built packages are installable in a clear environment✅ success
Stateful testsRuns stateful functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Stateless testsRuns stateless functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Stress testRuns stateless functional tests concurrently from several clients to detect concurrency-related errors✅ success

@pufit
pufit merged commit fa8ce0c into 24.11 Dec 19, 2024
@pufit
pufit deleted the backport/24.11/72872 branch December 19, 2024 23:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-bugfix Pull request with bugfix, not backported by default

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants