Skip to content

Backport #61610 to 23.8: Cancel merges before removing moved parts - #62527

Merged
tavplubix merged 1 commit into
23.8from
backport/23.8/61610
Apr 12, 2024
Merged

tavplubix merged 1 commit into
23.8from
backport/23.8/61610

Conversation

@robot-ch-test-poll4

Copy link
Copy Markdown
Contributor

Original pull-request #61610
Cherry-pick pull-request #62526

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

@robot-ch-test-poll4 robot-ch-test-poll4 added the pr-backport Changes, backported to release branch. Do not use manually - automated use only! label Apr 11, 2024
@robot-clickhouse-ci-2

robot-clickhouse-ci-2 commented Apr 11, 2024 •

Copy link
Copy Markdown
Contributor

This is an automated comment for commit 0c69469 with description of existing statuses. It's updated for the latest CI running

❌ Click here to open a full report in a separate page

Successful checks
Check nameDescriptionStatus
ClickHouse build checkBuilds ClickHouse in various configurations for use in further steps. You have to fix the builds that fail. Build logs often has enough information to fix the error, but you might have to reproduce the failure locally. The cmake options can be found in the build log, grepping for cmake. Use these options and follow the general build process✅ success
Compatibility checkChecks that clickhouse binary runs on distributions with old libc versions. If it fails, ask a maintainer for help✅ success
Docker image for serversThe check to build and optionally push the mentioned image to docker hub✅ success
Install packagesChecks that the built packages are installable in a clear environment✅ success
Push to DockerhubThe check for building and pushing the CI related docker images to docker hub✅ success
Stateful testsRuns stateful functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Stress testRuns stateless functional tests concurrently from several clients to detect concurrency-related errors✅ success
Check nameDescriptionStatus
CI runningA meta-check that indicates the running CI. Normally, it's in success or pending state. The failed status indicates some problems with the PR⏳ pending
Integration testsThe integration tests report. In parenthesis the package type is given, and in square brackets are the optional part/total tests❌ failure
Stateless testsRuns stateless functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc❌ failure

@tavplubix
tavplubix merged commit 110a90a into 23.8 Apr 12, 2024
@tavplubix
tavplubix deleted the backport/23.8/61610 branch April 12, 2024 13:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only!

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants