Skip to content

Revert "Iceberg variant type" - #125455

Merged
alexey-milovidov merged 1 commit into
masterfrom
revert-117198
Oct 12, 2026
Merged

alexey-milovidov merged 1 commit into
masterfrom
revert-117198

Conversation

@clickhouse-gh

@clickhouse-gh clickhouse-gh Bot commented Oct 12, 2026 •

Copy link
Copy Markdown
Contributor

Reverts #117198

This pull request was reverted automatically by the Revert CI regressions job, which found that it
introduced a failure that keeps happening on master, and merged this revert without waiting
for checks so that master is usable again.

Failure: test test_storage_delta/test.py::test_writes_timestamp_ntz_annotation_nested in Integration tests (amd_asan_ubsan, db disk, 1/8), Integration tests (amd_tsan, 1/8), Integration tests (arm_binary, 1/4), Integration tests (arm_binary, distributed plan, 1/4)

Seen 12 times on 3 master commits in the last
24 hours, between 2026-10-12 13:32:25 and 2026-10-12 14:21:50 UTC.

Most recent report: https://s3.amazonaws.com/clickhouse-test-reports/praktika.html?REF=master&sha=ef230ad3f1f4c0e718a69a5e4c17c106a5b506d0&name_0=MasterCI&name_1=Integration%20tests%20%28amd_asan_ubsan%2C%20db%20disk%2C%201%2F8%29&name_1=Integration%20tests%20%28amd_asan_ubsan%2C%20db%20disk%2C%201%2F8%29

Why this pull request:

test_storage_delta/test.py::test_writes_timestamp_ntz_annotation_nested passed on master through commit 56e72cfad0e82b5dfd2e3be5202aff91757dc920 on 2026-10-12 and then started failing on the merge commit 188290ba2c4bfaaa3e6628e8375532c42d21375f from PR #117198, first seen at 2026-10-12 13:32:25 UTC. The same DID NOT RAISE <class 'Exception'> assertion failure then repeated on two later master commits (942a30c41d5cf21b81665401a60dc002bc62b145 and ef230ad3f1f4c0e718a69a5e4c17c106a5b506d0) in all four affected integration jobs, so this is a deterministic regression rather than an infrastructure issue or flaky test. PR #117198 upgrades the integration runner from Spark 3.5.5 / delta-spark 3.3.0 / pyspark 3.5.5 to Spark 4.0.0 / delta-spark 4.0.0 / pyspark 4.0.0 in ci/docker/integration/runner/Dockerfile and ci/docker/integration/runner/requirements.txt; that changes Spark's Delta/Parquet reader behavior so the sc read in this test no longer raises Unable to create Parquet converter. The test still expects the old exception, so pytest.raises fails, and no newer passing master result or obvious merged follow-up fix is visible yet.

A draft pull request reintroducing the change is opened right after this one is merged, so the change
can come back through normal CI once the failure is fixed. Every investigation this job makes,
including the ones that revert nothing, is recorded in the checks_investigated table of the CI
database.

If this revert is wrong, say so here and bring the change back: the job errs towards reverting
because a broken master blocks everybody, not because its judgement beats yours.

Changelog category (leave one):

  • CI Fix or Improvement (changelog entry is not required)

Changelog entry (a user-readable short description of the changes that goes into CHANGELOG.md):


Workflow [PR]
Sync PR [sync-upstream/pr/125455]

Version info

  • Merged into: 26.10.1.2210-master (included in 26.10 and later)

This reverts commit 188290b, reversing
changes made to 0d2d91b.
@clickhouse-gh

clickhouse-gh Bot commented Oct 12, 2026 •

Copy link
Copy Markdown
Contributor Author

Workflow [PR], commit [80351ea]

Summary: ✅

@clickhouse-gh clickhouse-gh Bot added the pr-ci label Oct 12, 2026
@alexey-milovidov
alexey-milovidov merged commit 1e6f88e into master Oct 12, 2026
176 of 177 checks passed
@alexey-milovidov
alexey-milovidov deleted the revert-117198 branch October 12, 2026 16:45
@robot-ch-test-poll2 robot-ch-test-poll2 added the pr-synced-to-cloud The PR is synced to the cloud repo label Oct 12, 2026
huldarchen pushed a commit to huldarchen/ClickHouse that referenced this pull request Nov 2, 2026
A pull request tested against an older `master` can break tests that landed after its last CI run. ClickHouse#117198 was last tested on 2026-10-11 21:34, merged on 2026-10-12 13:16, and broke two `test_storage_delta` tests added to `master` in between, on every lane, until the automatic revert in ClickHouse#125455.

`MergeQueueCI` now runs `Stateless tests (amd_binary, targeted)` and `Integration tests (amd_binary, targeted)` on the merge group, on the `amd_binary` build the queue already makes. They select the tests covering the changed lines of the queued PR, plus the changed tests and the modules owning changed files (integration). The changed stateless tests are left to the merge-queue flaky check, and the tests that failed earlier in the PR are not rerun: its CI already did, and a flaky one would only bounce the PR from the queue. `Targeting` takes the PR number from the merge group head ref and the diff from the PR itself, because the merge group commit is not the PR head.

Both jobs stop at 40 minutes from their start: the stateless one via `--global_time_limit` (3 repetitions instead of 50), the integration one via the pytest session timeout, which a targeted check does not treat as a failure.

Related: ClickHouse#117198
Related: ClickHouse#125455
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-ci pr-synced-to-cloud The PR is synced to the cloud repo

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants