Repository navigation
Backport #116099 to 26.7: Honour date_time_overflow_behavior on parsing Date[Time] from text - #121556
Conversation
…sing Date[Time] from text
926b944 to
8de81ce
Compare
|
Workflow [BackportPR], commit [af603ff] Summary: ❌
|
…else as unparsable, as master does
|
@groeneai can you investigate the CI failure? |
|
Investigated. The only red at It is the known blocked-
Since the master fix (#111480) merged on 2026-07-28, CIDB gives 3 failures in 1775 runs on the 26.7 lineage (the branch plus its backport PRs) against 0 in 1194 on the 26.8 lineage, which has the fix. The reason is that #111480 never reached 26.7. Measured today through the contents API:
The remedy is The earlier failure on this PR, for completeness: So nothing on this PR needs changing for either failure, and a re-run of the |
Original pull-request #116099
Cherry-pick pull-request #121446
This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.
The PR source
The PR is created in the CI job
Version info
26.7.14.35