Skip to content

Backport #114274 to 26.6: Wait for replication before asserting a row count in test_rename_distributed - #120535

Merged
PedroTadim merged 1 commit into
26.6from
backport/26.6/114274
Sep 17, 2026
Merged

PedroTadim merged 1 commit into
26.6from
backport/26.6/114274

Conversation

@robot-ch-test-poll3

@robot-ch-test-poll3 robot-ch-test-poll3 commented Sep 17, 2026 •

Copy link
Copy Markdown
Contributor

Original pull-request #114274

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

The PR source

The PR is created in the CI job

Version info

  • Merged into: 26.6.9.6

@robot-ch-test-poll3 robot-ch-test-poll3 added the pr-backport Changes, backported to release branch. Do not use manually - automated use only! label Sep 17, 2026
@PedroTadim
PedroTadim merged commit fd01e9b into 26.6 Sep 17, 2026
26 of 55 checks passed
@PedroTadim
PedroTadim deleted the backport/26.6/114274 branch September 17, 2026 09:44
@groeneai

Copy link
Copy Markdown
Collaborator

CI finish ledger - b67085a

Every failure below has an owner, and none of them is this cherry-pick: all 14 jobs stop at the
image pre-pull step, so no test body ran and test_rename_column/test.py::test_rename_distributed
was never executed. 26.6 still pins the deleted upstream images minio/minio and minio/mc in
tests/integration/compose/docker_compose_minio.yml, which the db disk flavour attaches to
every module.

Check / test Reason Owner / fixing PR
Integration tests (amd_asan_ubsan, db disk, old analyzer, 1/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 2/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 3/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 4/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 5/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 6/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 7/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_asan_ubsan, db disk, old analyzer, 8/8) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 1/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 2/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 3/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 4/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 5/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)
Integration tests (amd_tsan, 6/6) Failed to pre-pull Docker images needed by the test batch #120546 (open, backport of #119999 to 26.6)

Once #120546 lands on 26.6 the branch CI recovers, and this PR then needs a run whose head
includes it. I have no push access to branches in this repository, so that step needs a
maintainer.

Session id: cron:clickhouse-maint-slot-14:20260917-092200

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only!

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants