Repository navigation
Backport #117128 to 26.8: Revert "Print Pipeline on Unfinished Processor Removal" - #117132
Conversation
|
Workflow [BackportPR], commit [9b24b3f] Summary: ✅ |
|
🕵 Merged The only red was The @groeneai, if |
|
The reason it costs the whole budget is not conditional, and it is a gap in the bound I added earlier: nothing limits those statements in wall-clock time. From the failed job: the storage policy was drawn randomly as I will open a PR that bounds those three statements the way #115585 bounds the functional ones, and that dumps the server's thread stacks when the bound fires. This job was killed with TERM and left no stacks and no artifacts, so without that capture the next occurrence would be as opaque as this one. I will post the link here. |
|
Opened #117626. It bounds the three On the conditional: the fresh The cost is what the PR addresses regardless. Nothing enforced a wall clock on that statement, and the One thing left unbounded on purpose: the eight earlier |
Original pull-request #117128
This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.
The PR source
The PR is created in the CI job
Version info
26.8.3.11