Skip to content

Remove changelog item for reverted PR - #116504

Merged
antaljanosbenjamin merged 1 commit into
masterfrom
revert-spilling-hash-join-keep-left-order-in-changelog
Aug 26, 2026
Merged

antaljanosbenjamin merged 1 commit into
masterfrom
revert-spilling-hash-join-keep-left-order-in-changelog

Conversation

@antaljanosbenjamin

@antaljanosbenjamin antaljanosbenjamin commented Aug 26, 2026 •

Copy link
Copy Markdown
Member

PR that reverted the changes: #116286

Changelog category (leave one):

  • Not for changelog (changelog entry is not required)

Workflow [PR]
Sync PR [sync-upstream/pr/116504]

Version info

  • Merged into: 26.9.1.173 (included in 26.9 and later)

PR that reverted the changes: #116286
@clickhouse-gh

clickhouse-gh Bot commented Aug 26, 2026 •

Copy link
Copy Markdown
Contributor

Workflow [PR], commit [6641092]

Summary: ✅


AI Review

Summary

This PR removes the CHANGELOG.md entry for #111973 after #116286 reverted that change. I did not find a correctness, metadata, or changelog-structure issue in the current diff, and the PR's CI is green.

Final Verdict

✅ No review findings.

@clickhouse-gh clickhouse-gh Bot added the pr-not-for-changelog This PR should not be mentioned in the changelog label Aug 26, 2026
@Algunenano Algunenano self-assigned this Aug 26, 2026
@antaljanosbenjamin
antaljanosbenjamin added this pull request to the merge queue Aug 26, 2026
Merged via the queue into master with commit 09e0e51 Aug 26, 2026
183 checks passed
@antaljanosbenjamin
antaljanosbenjamin deleted the revert-spilling-hash-join-keep-left-order-in-changelog branch August 26, 2026 16:55
@robot-clickhouse-ci-2 robot-clickhouse-ci-2 added the pr-synced-to-cloud The PR is synced to the cloud repo label Aug 26, 2026
pull Bot pushed a commit to erickirt/ClickHouse that referenced this pull request Aug 30, 2026
Derived from the manual edits the maintainers applied to the 26.8
changelog after the skill-assisted editing passes (git diff
26f0376
09e0e51 -- CHANGELOG.md):

- Maintainer-prepended `TODO:` flags as a release-workflow device
  (unexplained backward incompatibility, pending revert-of-revert,
  policy-violating setting names), distinct from author-left TODO junk.
- A `Backward Incompatible Change` entry must say what breaks.
- Full significance sort of every category on the final pass by default.
- Scan the whole release section for cross-category duplicate entries
  (`gini`, `use_query_condition_cache_for_top_k`, lazy materialization,
  adaptive codec selection) and describe the net shipped state.
- Check for reverts that postdate the generated range (ClickHouse#111973/ClickHouse#116504).
- Cut accurate-but-internal root-cause stories from entries.
- Formatting: bold-wrapped entries with doubled periods, `ClickHouse`
  spelling (style check), spaces inside parentheses, em-dash pairs to
  commas, redundant `Experimental:` prefix, backticking conversion
  expressions and tool names, automatic LTS marker for X.3/X.8.

Co-Authored-By: Claude Fable 5 <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-not-for-changelog This PR should not be mentioned in the changelog pr-synced-to-cloud The PR is synced to the cloud repo

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants