Skip to content

chore(docs): Add 26.2 slow start and end dates - #116048

Merged
Algunenano merged 4 commits into
ClickHouse:masterfrom
Crazybus:docs/release-status-26-2-slow-complete
Aug 27, 2026
Merged

Algunenano merged 4 commits into
ClickHouse:masterfrom
Crazybus:docs/release-status-26-2-slow-complete

Conversation

@Crazybus

@Crazybus Crazybus commented Aug 24, 2026 •

Copy link
Copy Markdown
Member

July 1st was the predicted start date but we didn't start until the 22nd.

Changelog category (leave one):

  • Documentation (changelog entry is not required)

Workflow [PR]
Sync PR [sync-upstream/pr/116048]

Version info

  • Merged into: 26.9.1.213 (included in 26.9 and later)

July 1st was the predicted start date but we didn't start until the
23rd.
@clickhouse-gh

clickhouse-gh Bot commented Aug 24, 2026 •

Copy link
Copy Markdown
Contributor

Workflow [PR], commit [ee059c1]

Summary: ✅


AI Review

Summary

This PR updates the 26.2 row on the Cloud release status page to record the actual Slow-channel rollout dates as 2026-07-22 instead of the earlier prediction / TBD. I checked the current diff, the ReleaseSchedule renderer, the PR metadata, and all prior GitHub discussion, and I did not find any remaining blockers or majors.

Final Verdict

✅ No new findings.

Comment on lines +68 to +69
slow_start_date: '2026-07-23',
slow_end_date: '2026-07-23',

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

We're saying we started and ended in the same exact date? That feels odd

Copy link
Copy Markdown
Member Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Yes. Internal Slack link for confirmation: https://clickhouse-inc.slack.com/archives/C0AFBTMGZR9/p1784733029497719?thread_ts=1784557010.258749&cid=C0AFBTMGZR9

I also noticed that I used by local timezone dates instead of UTC so I pushed a new commit setting the start and end date to 2026-07-22.

@Algunenano Algunenano left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Please follow the PR template

Change log category: Documentation (changelog entry is not required)
@Crazybus

Copy link
Copy Markdown
Member Author

@Algunenano updated PTAL!

@Crazybus
Crazybus requested a review from Algunenano August 25, 2026 05:20
@clickhouse-gh clickhouse-gh Bot added the pr-not-for-changelog This PR should not be mentioned in the changelog label Aug 25, 2026
@Crazybus
Crazybus requested a review from FranciscoMSM August 25, 2026 05:24
@Algunenano Algunenano self-assigned this Aug 25, 2026
@Algunenano
Algunenano enabled auto-merge August 25, 2026 17:23
@Algunenano
Algunenano disabled auto-merge August 26, 2026 10:20
@Algunenano

Copy link
Copy Markdown
Member

@Crazybus The tests fail, and they seem related to the changes

@Algunenano

Copy link
Copy Markdown
Member

It's not related, it seems it was broken in master by #111720

kavirajk pushed a commit to kavirajk/ClickHouse that referenced this pull request Aug 26, 2026
`docs/resources/changelogs/oss/2026.mdx` is generated from `CHANGELOG.md`
by `docs/_site/scripts/update_changelogs.py`. Pull request ClickHouse#111720 added
the 26.8 section to `CHANGELOG.md` without re-running the generator, so
the generated page went stale and `Check changelogs` in `Docs check
(Mintlify)` fails on every pull request that touches
`docs/resources/changelogs/`.

Regenerated with `python3 _site/scripts/update_changelogs.py` from `docs/`.

Related: ClickHouse#111720
Related: ClickHouse#116048

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
@clickhouse-gh clickhouse-gh Bot added pr-documentation Documentation PRs for the specific code PR and removed pr-not-for-changelog This PR should not be mentioned in the changelog labels Aug 26, 2026
@Algunenano
Algunenano added this pull request to the merge queue Aug 27, 2026
Merged via the queue into ClickHouse:master with commit a3a04b7 Aug 27, 2026
182 checks passed
@robot-clickhouse-ci-2 robot-clickhouse-ci-2 added the pr-synced-to-cloud The PR is synced to the cloud repo label Aug 27, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-documentation Documentation PRs for the specific code PR pr-synced-to-cloud The PR is synced to the cloud repo

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants