Repository navigation
chore(docs): Add 26.2 slow start and end dates - #116048
Algunenano merged 4 commits into
Conversation
July 1st was the predicted start date but we didn't start until the 23rd.
|
Workflow [PR], commit [ee059c1] Summary: ✅ AI ReviewSummaryThis PR updates the Final Verdict✅ No new findings. |
…-26-2-slow-complete
| slow_start_date: '2026-07-23', | ||
| slow_end_date: '2026-07-23', |
There was a problem hiding this comment.
We're saying we started and ended in the same exact date? That feels odd
There was a problem hiding this comment.
Yes. Internal Slack link for confirmation: https://clickhouse-inc.slack.com/archives/C0AFBTMGZR9/p1784733029497719?thread_ts=1784557010.258749&cid=C0AFBTMGZR9
I also noticed that I used by local timezone dates instead of UTC so I pushed a new commit setting the start and end date to 2026-07-22.
Algunenano
left a comment
There was a problem hiding this comment.
Please follow the PR template
Change log category: Documentation (changelog entry is not required)
|
@Algunenano updated PTAL! |
|
@Crazybus The tests fail, and they seem related to the changes |
|
It's not related, it seems it was broken in master by #111720 |
`docs/resources/changelogs/oss/2026.mdx` is generated from `CHANGELOG.md` by `docs/_site/scripts/update_changelogs.py`. Pull request ClickHouse#111720 added the 26.8 section to `CHANGELOG.md` without re-running the generator, so the generated page went stale and `Check changelogs` in `Docs check (Mintlify)` fails on every pull request that touches `docs/resources/changelogs/`. Regenerated with `python3 _site/scripts/update_changelogs.py` from `docs/`. Related: ClickHouse#111720 Related: ClickHouse#116048 Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
July 1st was the predicted start date but we didn't start until the 22nd.
Changelog category (leave one):
Workflow [PR]
Sync PR [sync-upstream/pr/116048]
Version info
26.9.1.213(included in26.9and later)