Skip to content

Backport #113484 to 26.6: Push down plan level constants from joins - #114492

Merged
vdimir merged 3 commits into
26.6from
backport/26.6/113484
Aug 13, 2026
Merged

vdimir merged 3 commits into
26.6from
backport/26.6/113484

Conversation

@robot-clickhouse

@robot-clickhouse robot-clickhouse commented Aug 12, 2026 •

Copy link
Copy Markdown
Member

Original pull-request #113484
Cherry-pick pull-request #114488

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

The PR source

The PR is created in the CI job

Version info

  • Merged into: 26.6.3.33

@robot-clickhouse robot-clickhouse added pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-bugfix Pull request with bugfix, not backported by default labels Aug 12, 2026
@clickhouse-gh

clickhouse-gh Bot commented Aug 12, 2026 •

Copy link
Copy Markdown
Contributor

Workflow [BackportPR], commit [f919deb]

Summary: ❌

job_name test_name status info comment
Integration tests (amd_asan_ubsan, db disk, old analyzer, 5/6) ERROR

@diegomestre2 diegomestre2 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

No remarks

@vdimir
vdimir merged commit 2825560 into 26.6 Aug 13, 2026
111 of 115 checks passed
@vdimir
vdimir deleted the backport/26.6/113484 branch August 13, 2026 13:51
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-bugfix Pull request with bugfix, not backported by default

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants