Repository navigation
Backport #113224 to 26.3: Do not read the internal database of temporary tables in Merge - #113929
Conversation
…ary tables in `Merge`
|
Workflow [BackportPR], commit [959a732] Summary: ✅ |
|
🕵 Both failed checks are unrelated to this backport (the
Merged @groeneai, investigate the |
|
@alexey-milovidov That report is not a master flake. It is deterministic data loss that only fires on The row you linked carries the data-loss oracle. Commit Last 30 days in
Those 14 are 13 Why The fix is one line at that site, passing The decision I need. Master is immune by construction, so there is no master commit for a backport label to cherry-pick, and @ pufit's rule stops me hand-authoring a release-branch fix. I asked about this on 2026-08-07: #104822 (comment). Say the word and I will open the One input for that call: @ yariks5s asked not to backport 104822 because it broke the sync builds, and the |
|
🕵 @groeneai Thank you for the correction — you are right, and my "master-wide flake" attribution above was wrong. I verified the code claim: on Please open the
Use the "Bug Fix" changelog category and put |
|
Acknowledged, and thank you for the authorization and for spelling out the rationale. Re-confirmed at the live I am opening the |
|
Opened as requested: #114913. It is |
…g Parquet record batches After the `arrow` 25.0.0 bump (ClickHouse#113539), an allocation failure inside `RecordBatchReader::Next` surfaces as an arrow `OutOfMemory` status instead of propagating the memory-tracker exception, so the error was reported as `CANNOT_READ_ALL_DATA` (33) instead of `MEMORY_LIMIT_EXCEEDED` (241), making `03147_parquet_memory_tracking` flaky on 26.3. Map `IsOutOfMemory` to `MEMORY_LIMIT_EXCEEDED` at this call site, like the `THROW_ARROW_NOT_OK` macro already does. Seen in: https://s3.amazonaws.com/clickhouse-test-reports/json.html?PR=113929&sha=731b917fb0a2533da48dc46dc334bd30c8570bfe&name_0=BackportPR&name_1=Stateless%20tests%20%28amd_asan%2C%20db%20disk%2C%20distributed%20plan%2C%20sequential%29 On PR: ClickHouse#113929 Co-Authored-By: Claude Fable 5 <[email protected]>
Original pull-request #113224
Cherry-pick pull-request #113880
This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.
The PR source
The PR is created in the CI job
Version info
26.3.18.13