Repository navigation
Gap analysis: CRITICAL avatar bug flagged, full session sync - #477
Conversation
Phase 2 CRITICAL bugs: - #331: Avatar geometry shredded in live view — most personas show exploded vertices - #322: Only 8 VRM models for 15 personas — overflow causes vertex corruption Updated all phases with session closures: - Phase 3: 13/17 done - Phase 4: 5/6 done (#411 PROVEN — AIs wrote 2,027 lines autonomously) - Total: 96 tracked, 25 open, 71 closed
There was a problem hiding this comment.
Pull request overview
Updates the ALPHA gap analysis planning doc to reflect the latest Phase 2 “Live Call Quality” status (including a newly flagged critical avatar-geometry issue) and refreshes the Issue Map rollups/counts.
Changes:
- Reclassifies Phase 2 items (marks some issues DONE/merged, flags #331 and #322 as CRITICAL) and updates “Done when” criteria.
- Updates the Issue Map phase rollups (adds/removes issues, adjusts done counts, updates total tracked/open/closed numbers).
- Marks #411 as completed in the Issue Map.
💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.
| | **10: Grid** | ~~#323~~, ~~#364~~, #349, #337, ~~#467~~, #469, #473 | 7 (3 done) | | ||
| | **Research** | #391, #392, ~~#393~~ | 3 (1 done) | | ||
| | **Total** | | **96 tracked, 25 open, 71 closed** | |
There was a problem hiding this comment.
Phase 10 in the Issue Map includes #469 and #473, but the Phase 10 section’s issue table above doesn’t list those issues at all. Update the Phase 10 section (or adjust this Issue Map row) so the phase breakdown matches the detailed lists.
| | **10: Grid** | ~~#323~~, ~~#364~~, #349, #337, ~~#467~~, #469, #473 | 7 (3 done) | | |
| | **Research** | #391, #392, ~~#393~~ | 3 (1 done) | | |
| | **Total** | | **96 tracked, 25 open, 71 closed** | | |
| | **10: Grid** | ~~#323~~, ~~#364~~, #349, #337, ~~#467~~ | 5 (3 done) | | |
| | **Research** | #391, #392, ~~#393~~ | 3 (1 done) | | |
| | **Total** | | **94 tracked, 23 open, 71 closed** | |
| | **2: Live Quality** | #331, ~~#338~~, #339, ~~#340~~, ~~#318~~, #322, ~~#332~~, #380, #399, #409, #436, ~~#464~~, #465 | 13 (6 done) | | ||
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, #343, #342, ~~#341~~, ~~#413~~, #417, #430, #433, #439, #440, #453 | 17 (9 done) | | ||
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, #411, ~~#415~~, ~~#416~~, #445 | 6 (4 done) | | ||
| | **2: Live Quality** | #331 ⚠️, ~~#338~~, #339, ~~#340~~, ~~#318~~, #322 ⚠️, ~~#332~~, ~~#380~~, ~~#399~~, #409, #436, ~~#464~~, ~~#465~~, #473 | 14 (8 done, 2 CRITICAL) | |
There was a problem hiding this comment.
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, #343, #342, ~~#341~~, ~~#413~~, #417, #430, #433, #439, #440, #453 | 17 (9 done) | | ||
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, #411, ~~#415~~, ~~#416~~, #445 | 6 (4 done) | | ||
| | **2: Live Quality** | #331 ⚠️, ~~#338~~, #339, ~~#340~~, ~~#318~~, #322 ⚠️, ~~#332~~, ~~#380~~, ~~#399~~, #409, #436, ~~#464~~, ~~#465~~, #473 | 14 (8 done, 2 CRITICAL) | | ||
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, ~~#343~~, ~~#342~~, ~~#341~~, ~~#413~~, ~~#417~~, ~~#430~~, #433, #439, ~~#440~~, #453 | 17 (13 done) | |
There was a problem hiding this comment.
The Issue Map marks several Phase 3 items as done (e.g., #343, #342, #417, #430), but the Phase 3 section above still lists #343/#342/#417 as TODO. Please reconcile the Issue Map with the per-phase table (either update the Phase 3 table statuses or undo the strike-throughs here).
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, ~~#343~~, ~~#342~~, ~~#341~~, ~~#413~~, ~~#417~~, ~~#430~~, #433, #439, ~~#440~~, #453 | 17 (13 done) | | |
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, #343, #342, ~~#341~~, ~~#413~~, #417, ~~#430~~, #433, #439, ~~#440~~, #453 | 17 (13 done) | |
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, #411, ~~#415~~, ~~#416~~, #445 | 6 (4 done) | | ||
| | **2: Live Quality** | #331 ⚠️, ~~#338~~, #339, ~~#340~~, ~~#318~~, #322 ⚠️, ~~#332~~, ~~#380~~, ~~#399~~, #409, #436, ~~#464~~, ~~#465~~, #473 | 14 (8 done, 2 CRITICAL) | | ||
| | **3: Tool Calling** | ~~#324~~, ~~#368~~, ~~#366~~, ~~#367~~, ~~#321~~, ~~#325~~, ~~#371~~, ~~#343~~, ~~#342~~, ~~#341~~, ~~#413~~, ~~#417~~, ~~#430~~, #433, #439, ~~#440~~, #453 | 17 (13 done) | | ||
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, ~~#411~~ ✅, ~~#415~~, ~~#416~~, #445 | 6 (5 done) | |
There was a problem hiding this comment.
The Issue Map marks #411 as done (#411 ✅), but in the Phase 4 section above, #411 is still shown with Status = TODO. Please align the Phase 4 table with this summary (or remove the done marker here if #411 isn’t actually complete).
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, ~~#411~~ ✅, ~~#415~~, ~~#416~~, #445 | 6 (5 done) | | |
| | **4: Dev Orchestration** | ~~#326~~, ~~#370~~, #411, ~~#415~~, ~~#416~~, #445 | 6 (4 done) | |
Avatar vertex corruption flagged as critical in Phase 2. #411 marked done (PR #476 — AI-authored ontology system). 96 tracked, 25 open, 71 closed.