Skip to content

docs(alpha): second refresh — close PIECE-5 + PIECE-8 + contract-widening; navigate to MODULE-CATALOG queue - #1342

Merged
joelteply merged 1 commit into
canaryfrom
joel/docs-alpha-gap-refresh-2
May 16, 2026
Merged

joelteply merged 1 commit into
canaryfrom
joel/docs-alpha-gap-refresh-2

Conversation

@joelteply

Copy link
Copy Markdown
Contributor

What

Second refresh of `ALPHA-GAP-ANALYSIS.md` after #1316 merged. Closes 6 Immediate-Next-Actions items completed since the first refresh; reorders the rest around what's actually next; adds explicit navigation from ALPHA-GAP into MODULE-CATALOG's "Next Modules To Build" queue.

Doc-only.

Closed Since First Refresh

Item Closed by
#6 Widen no_cpu_fallback_contract #1341 (6 new assertions; 9 tests; PIECE-5 stack locked in at type-check time)
#8 GRID-INFERENCE-ROUTING PR-1 #1315 (announcer + probe + registry)
CBAR-PIECE-5 end-to-end #1331 + #1333 + #1335 + #1338
PIECE-8 inference-grpc hardcoded-clamps #1340
Doc family architecture surface #1324 / #1327 / #1332 / #1336 / #1337 (open); #1316/#1317/#1320/#1329 (merged)

Why

`claude-tab-1` (continuum-scope) said on #cambriantech they're reading MODULE-CATALOG next to find what fits. This refresh makes the navigation from ALPHA-GAP → MODULE-CATALOG explicit:

What's Queued (per MODULE-CATALOG)

  1. `audit-recorder` (~200 LoC, 1 PR) — no dependencies; unblocks trace bus landing
  2. `threat-detector` (~250 base + ~50/detector, 2 PRs) — depends on Feature: CLI Implementation with Testing #1
  3. `working-set-manager` (~280 LoC, 2 PRs) — substrate's MMU
  4. `demand-aligned-recall` (~320 LoC, 3 PRs) — central API
  5. `substrate-governor` (~400 LoC, 3 PRs) — hardware probe shipped via feat(inference): CBAR-PIECE-5 PR-3 — hardware probe populates HardwareProfile #1335; remaining is policy + cascade + pressure-signal routing

The Loop

Doc spec → implementing agent picks up → ships PR → next spec referenced. Six items closed in ~2 hours on the implementer side because the specs were ready to code against. This PR keeps the navigation honest.

…ning; navigate to MODULE-CATALOG queue

Second refresh of ALPHA-GAP Immediate Next Actions to reflect work
landed since #1316 merged. Six items closed; navigation into
MODULE-CATALOG queue made explicit.

Closed: #6 contract widening (#1341), #8 GRID-INFERENCE-ROUTING PR-1
(#1315), CBAR-PIECE-5 end-to-end (#1331/#1333/#1335/#1338),
PIECE-8 inference-grpc hardcoded-clamps (#1340), doc family
architecture surface (#1324/#1327/#1332/#1336/#1337 open;
#1316/#1317/#1320/#1329 merged).

Item #9 reorganized to point at MODULE-CATALOG's 'Next Modules To
Build' queue (audit-recorder → threat-detector → working-set-manager
→ demand-aligned-recall → substrate-governor).

Adds closeout summary section listing what's done, what's open
(5 architecture-doc PRs ready for review + 2 airc PRs), and what's
queued (5 modules with dependency state + LoC + acceptance criteria
in MODULE-CATALOG).

Doc-driven development cycle is working: doc spec → implementing
agent picks up → ships PR → next spec referenced.
@joelteply
joelteply merged commit e9110f9 into canary May 16, 2026
2 checks passed
@joelteply
joelteply deleted the joel/docs-alpha-gap-refresh-2 branch May 16, 2026 22:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant