Repository navigation
test: extend Q01 through published drawing reopen and staleness - #400
Merged
Merged
Conversation
axisrow
marked this pull request as ready for review
October 25, 2026 10:04
Blogbotana
approved these changes
Oct 25, 2026
11 tasks done
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What this changes
Refs #334, refs #333. Extend the existing real-binary Q01 frame story through the currently implemented D03 document lifecycle: create a semantic drawing of a frame column, publish it, retain the exact publication response, then edit and publish the source model. The drawing must become stale while keeping its original source revision and document version. A publication retry and version listing must reproduce the stored response, and a fresh document reader must reopen the archived original column name.
The single existing alpha_scenario entry point remains unchanged. Update its runbook with the additional stored artifact and final model state. This is a Q01 acceptance slice over existing D03 behavior, not completion of expanded Q01, drawings, native UI, PDF/print or gates K7/K8.
How you verified it
cargo fmt --all -- --checkgit diff --checkalpha_scenariosuite passed (1 test, 19.92 seconds) in sequential combined verification with refactor: share CLI result reporting outside plate commands #396-refactor: share mechanical real-binary CLI test fixtures #399. Each command starts the real CLI in a fresh process.-D warningspassed on the combined verification branch.ce4b921c2c85bf7daf42d0a3706d2cd0468ff553: run 40181669950.Required CI checks passed. No manual native OS/GPU result is claimed.
Never-crash
Provenance
Anything a reviewer should look at first
The retained final model still has five parts, with the first column renamed. The saved BOM and drawing version refer to the earlier accepted source, and the test makes that distinction explicit. D04-D08 and the remaining expanded MVP dependencies retain their own acceptance.