Repository navigation
Description
Outcome and current gap
Replace parallel scalar evidence arguments with reusable, explicitly typed immutable records, while keeping pure-helper admission and host governance intact. RFC 0066 explicitly marks records/enums/results as proposed. The shipped package compiler accepts scalar signatures only. Do not describe these data types as already executable.
First deliverable: executable design before syntax expansion
Submit a compact RFC amendment defining one minimal records-only milestone: declaration, construction, field access, exact function parameter/result types and strict host-input validation. Supply proposed executable IR shape, loader rules, VM semantics, canonical identity and positioned diagnostics. Reserve enums/results/exhaustive matching for separately scoped future issues; no placeholder runtime opcodes or permissive fallbacks.
Use nominal type identity bound to defining module, declaration name and canonical schema. Decide declaration/field order significance and make hashing explicit. Reject ambiguous duplicate names, unknown/extra/missing fields, implicit numeric coercion, bool-as-int, nonfinite numbers, recursive record graphs and mutation. Do not reinterpret the existing reasoning-signature record<Signature> as a general-purpose record.
Compatibility and resource contract
A new executable representation requires an explicitly named supported IR revision and loader/VM compatibility policy. Old loaders must reject the new revision cleanly; existing v0.1.0/v1 programs and canonical fixtures remain unchanged. Keep package/lock/Intent/build-evidence versions separate; change only the formats whose semantics change and document migration. If lowering to existing opcodes is proposed instead, prove full validation/evaluation/provenance equivalence and explain why no hidden value semantics are added.
Proposed initial fixed ceilings: at most 32 fields per declaration, nesting depth 8 and 4096 materialized field values per admitted frame/result. These are design targets, not existing guarantees. Count cumulatively before allocation and include a clear total-byte/string bound using existing scalar limits. Accepting different ceilings requires a documented reason and frozen boundary tests before implementation, not raising limits to rescue a failing candidate. Preserve existing stricter package budgets and acyclic pure functions.
Implementation slices and ownership
PR1: RFC, version matrix and executable/invalid golden fixtures. PR2: declarations/type checking/construction, strict IR loading and VM behavior for the approved small record subset. PR3 only if needed: source-map, docs and installed-package parity. One lane owns compiler/type/IR/VM record changes; package CLI remains a consumer of the existing build API and must not patch these internals concurrently.
Acceptance and negative controls
-
A non-trading evidence record is imported by two pure helpers; inline and imported equivalents have identical documented executable behavior and stable package provenance.
-
The host rejects wrong schemas, stale nominal IDs, hidden fields, numeric coercions and over-budget payloads before rules or helpers run.
-
Field mutation, recursive declarations/values, effect injection, captured host data and implicit series lifting fail with stable code/path/span.
-
Field access evaluates only a validated value; helper expression-substitution/evaluation semantics are specified and tested, including unused and repeated arguments.
-
Boundary and boundary-plus-one tests cover field/depth/byte/materialization budgets without uncaught RecursionError or uncontrolled expansion.
-
Old single-source/package/Intent fixtures retain their hashes; new IR round-trip and unsupported-version tests pass.
-
Diagnostics retain dependency path and expansion stack; changing a record schema changes its identity and dependent packageHash.
-
Pure helpers remain effect-free. No host dispatch, inference, registry, arbitrary Python, loops or quantum service calls are introduced.
An RFC-only PR is milestone 1, not completion of this whole issue. Completion requires the minimal executable records milestone plus compatibility evidence; defer other data types explicitly.
Hillclimb protocol and evidence
Start from a clean, isolated branch and record the actual base SHA; the reviewed baseline is Nano cb6ea884d63dcaa8cc0e7c0b952bb88784e8219f (source). Rebase and recheck if main has advanced. Link this issue to roadmap #67. Before editing, freeze the contract/fixture hashes, reproduce the specific missing behavior, and record a passing adjacent compatibility control. A missing feature is an expected rejection, not an invented production incident.
Use at most three candidate iterations against the frozen development set. Log each hypothesis, minimal diff, command, seed/environment, result and regression delta. Keep any held-out set immutable and report its final evaluation separately; do not tune against it. Stop and report an unresolved failure or dependency rather than weakening validation, increasing caps, deleting a negative control or relabelling skips as passes.
Deliver small reviewable PRs with exact head/base SHAs, commands, pass/fail/skip denominators, fixture/artifact hashes and limitations. Coordinate shared schemas before implementation; only one lane edits each shared contract at a time. Preserve baseline/Intent/executable/package/quantum schema identities independently. Issue creation is planning authorization, not permission to launch agents, merge, deploy, spend or change runner/security/credential settings. Tests are offline, fake-provider or local simulator only. CI startup failure with zero jobs remains a failure; any later merge exception needs its own applicable authority. The prior local-test waiver covered only PRs #82/#188/#460.
Dependencies and lane boundary
Builds on completed #66. RFC/version/fixture agreement comes first; runtime work follows that fixed design. #84 remains independently usable with scalar helpers. Coordinate compiler/IR ownership with #61 before touching any shared type/version helper. #88 consumes record conformance only after it actually lands; enum/result execution remains deferred.
Activity