New Glenn
New Glenn 7x2 in its third mission, launching BlueBird 7 in April 2026. | |
| Function | |
|---|---|
| Manufacturer | Blue Origin |
| Country of origin | United States |
| Project cost | At least US$2.5 billion[1] |
| Cost per launch | US$68–110 million[2][3] |
| Size | |
| Height |
|
| Diameter |
|
| Stages | 2 or 3 |
| Capacity | |
| Payload to LEO | |
| Mass | |
| Payload to GTO | |
| Mass | |
| Payload to GSO | |
| Mass | |
| Payload to TLI | |
| Mass | |
| Associated rockets | |
| Comparable | |
| Launch history | |
| Status | Inactive |
| Launch sites |
|
| Total launches | 3 |
| Success(es) | 2 |
| Failure | 1 |
| Landings | 2 / 3 attempts |
| First flight | January 16, 2025 |
| Last flight | April 19, 2026 (BlueBird 7, most recent) |
| Carries passengers or cargo | |
| First stage – GS1 | |
| Height | 57.5 m (189 ft) |
| Powered by | |
| Maximum thrust |
|
| Specific impulse | vac: 340 s (3.3 km/s) |
| Burn time | 190 seconds[11] |
| Propellant | LOX / CH4 |
| Second stage – GS2 | |
| Height | 23.4 m (77 ft) |
| Powered by | |
| Maximum thrust |
|
| Specific impulse | 445 s (4.36 km/s) |
| Burn time | 644 seconds[11] |
| Propellant | LOX / LH2 |
| Third stage (optional) – GS3 | |
| Powered by | 1 × BE-7 |
| Specific impulse | 460 s (4.5 km/s)[12] |
| Propellant | LOX / LH2 |
New Glenn is a family of two-stage partially reusable launch vehicles developed and operated by the American company Blue Origin. The rocket has an operational heavy-lift New Glenn 7×2 configuration with a payload capacity of 45 tons to low Earth orbit, there is also an under-development super heavy-lift New Glenn 9×4 configuration targeting a payload capacity of over 70 tons to LEO. Both use seven-meter (23 ft) diameter stages with a slightly wider first stage aft module containing the engines and landing legs.
Development of New Glenn began before 2013 and was officially announced in 2016. The rocket is named for NASA astronaut John Glenn, the first American to orbit Earth. A test vehicle was first erected on the launch pad in February 2024. Its first flight, NG-1, took place on January 16, 2025, from Cape Canaveral Launch Complex 36. Carrying the Blue Ring Pathfinder,[13] the launch served as the first of several demonstration flights required for certification for the National Security Space Launch program.
As with Blue Origin's suborbital New Shepard rocket, New Glenn's first stage is designed for reuse. It lands at sea on a barge called Landing Platform Vessel 1. The first stage achieved its first successful landing on November 13, 2025, during New Glenn's second flight, NG-2. New Glenn is slated to launch Blue Origin's Blue Moon Mark 1 lunar lander on robotic missions.
The New Glenn 7×2 first stage is powered by seven methalox BE-4 engines, while the second stage uses two hydrolox BE-3U engines; both engine types are designed and built by Blue Origin. It launches from Cape Canaveral Launch Complex 36 (LC-36), with future missions planned from Vandenberg Space Launch Complex 14 (SLC-14). It is one of three US heavy-lift rockets, alongside the Vulcan Centaur from United Launch Alliance and Falcon Heavy from SpaceX. In May 2026 an explosion occurred during testing of a NG7x2 first stage which heavily damaged LC-36.
New Glenn 9×4 is in development as of 2025. It has nine BE-4 engines on the first stage, four BE-3U engines on the second stage, and a larger payload fairing measuring 8.7 meters (29 ft) in diameter. It will stand nearly as tall as the SpaceX Starship.
History
[edit]Development
[edit]Blue Origin design concepts in 2012 described an orbital human spacecraft system utilizing a reusable first-stage booster, of a smaller size than New Glenn, that would launch like a conventional multistage vertical launch vehicle until stage separation where the upper stage would continue into orbit while the first-stage booster would descend to perform a powered vertical landing. From the earliest design concepts, the first-stage booster was intended to be refueled and relaunched to reduce the costs of access to space. The booster launch vehicle would be powered by the BE-3 engine and was designed to launch Blue Origin's biconic capsule design carrying astronauts and supplies. The concept was that after it's mission and upon returning to Earth the capsule would descend under parachutes onto land for recovery and reuse on future missions.[14][15]
Further plans for an orbital launch vehicle were made public in 2015, with the announcement that LC-36 would be the pad for their upcoming BE-4 powered rocket manufactured at a nearby facility in Exploration Park.[16] In early 2016, Blue Origin indicated that the first orbital launch was expected no earlier than 2020 from the Florida launch facility.[17] In September 2016 Blue Origin publicly unveiled the vehicle, as well as the New Glenn name in honor of the astronaut John Glenn. At the time the design was described as a 7 m (23 ft) diameter, two- or three-stage rocket, with a reusable first stage landing vertically. In this initial design the first and second stages were both to use methalox BE-4 engines, seven on the first stage and one on the second stage. An optional third stage would be powered by a single BE-3 hydrolox engine.[18][19] At the time first stage reuse for up to 100 flights was their design target.[5]
In March 2017, Jeff Bezos showed graphics of the New Glenn which had two large strakes at the bottom of the booster.[20] In the September 2017 announcement, Blue Origin announced a much larger 7 m (23 ft) payload fairing for New Glenn, up from 5.4 m (18 ft) in the originally announced design and continued to forecast a 2020 debut.[21]

By March 2018, the launch vehicle design had changed. It was announced that the New Glenn second stage would now be powered by two vacuum versions of the flight proven BE-3 liquid hydrogen/liquid oxygen rocket engine (BE-3U) with a single BE-3U engine for the third stage deep space option. The three-stage booster variant was subsequently cancelled completely in January 2019.[22] By mid-2018, the low-level design was not yet complete and the likelihood of achieving an initial launch by 2020 was being called into question by company engineers, customers, industry experts, and journalists.[23][24] In October 2018, the Air Force announced Blue Origin was awarded $500 million for development of New Glenn as a potential competitor in future contracts, including Evolved Expendable Launch Vehicle (EELV) Phase 2.[25] The October 2018 award was terminated[why?] in December 2020 after Blue received $255.5 million of the $500 million.[26][27]
By February 2019, several launches for New Glenn had been contracted: five for OneWeb, an unspecified amount of Telesat, one each for Eutelsat, mu Space Corp and SKY Perfect JSAT.[28][29][21][30][31] In February 2019, Blue Origin indicated that no plans to build a reusable second stage were on the company's roadmap.[32] In the event, by July 2021, Blue Origin was again evaluating options for getting to a reusable second-stage design: Project Jarvis.[33]
In August 2020 the Air Force announced that New Glenn was not selected for the National Security Space Launch Phase 2 launch procurement. Due to this, in February 2021 Blue Origin announced that the first flight would slip to no earlier than late 2022.[26]
By December 2020, Blue Origin indicated that the BE-4 engine delivery to United Launch Alliance (ULA) would slip to summer 2021, and ULA disclosed that the first launch of the New Glenn competitor ULA Vulcan Centaur would now be no earlier than 4Q 2021.[34] Blue Origin announced a further schedule slip for the first launch of New Glenn in March 2021 when the company said New Glenn "would not launch until the fourth quarter of 2022, at the earliest".[35]
By 2021, Blue had changed the published reuse specification for New Glenn to a minimum of 25 flights,[36] from their 2016 statement targeting up to 100 flights.[5]
In March 2022, the expected first launch of New Glenn slipped to no earlier than Q4 2023.[37]
In January 2024, the first stage of New Glenn was being transported at Kennedy Space Center from the factory to the launch complex in preparation for a 2024 launch.[38]
In February 2024, a boilerplate of both the first and second stages of New Glenn was erected on launch pad LC-36 for the first time. This test vehicle was not in flight-ready condition and had no functioning engines mounted.[39] In May 2024, New Glenn was rolled out again for additional testing prior to a planned launch later in the year.[40]
Reusable upper stage
[edit]
Although New Glenn's original second stage was designed to be expendable, Blue Origin later studied concepts for making it reusable. In July 2021, Ars Technica reported that the company had started Project Jarvis, an effort to develop a fully reusable second stage for New Glenn.[33] The project included work on stainless-steel propellant tanks and structures; in August 2021, a stainless-steel test tank was moved to Launch Complex 36 for planned ground pressure testing with cryogenic propellants.[41]
In parallel, Blue Origin evaluated several possible reusable-stage architectures, including a winged stage that would reenter as a spaceplane, an aerospike engine concept in which the engine would also serve as a heat shield, and a high-drag design using flaps and a thermal protection system similar in broad concept to SpaceX Starship.[41] In September 2024, Bezos said Blue Origin had a design for a reusable second stage and was developing its thermal protection system, but was still assessing whether aluminum or stainless steel should be used. He also said the company was continuing work on a cheaper expendable second stage and could abandon second-stage reuse if an expendable design proved more economical.[42]
After New Glenn's first flight in January 2025, Ars Technica reported that Project Jarvis had been shelved.[43]
Inaugural launch
[edit]
On June 12, 2024, Blue Origin received its communications license for the inaugural flight of New Glenn.[44] The vehicle was selected for the U.S. NSSL program with expectation that the inaugural launch would occur no later than December 2024.[45]
Preparations began in earnest in late August for what was to be New Glenn's debut launch, carrying the ESCAPADE mission consisting of two Photon satellites destined for Mars on a VADR contract from NASA.[46] After consultation with NASA, both parties was decided to forgo the October launch window to avoid "significant cost, schedule, and technical challenges", as well as the risks of removing fuel from the vehicle in the event of a launch delay.[47]
As of September 2024, the debut launch was planned to be a demonstration launch for the United States Space Force's National Security Space Launch program, carrying the Blue Ring Pathfinder.[13] The booster for the flight was named So You're Telling Me There's a Chance, alluding to the difficulty of landing a reusable booster on the first attempt.[48]
Testing continued in September 2024 with successful hot fire tests of the second stage.[49] The completed first stage moved to the launchpad on October 30, 2024, ahead of the first flight.[50]
The Flight 1 vehicle was moved to the launchpad on November 20, 2024, for static fire testing.[51] Full wet dress rehearsal occurred on December 19, 2024,[52] and a 24-second static fire was conducted on December 27.[53]
On January 13, 2025, Blue Origin conducted their first launch attempt with the vehicle. After several slips in the countdown, the attempt was scrubbed at approximately 3:05 AM EST (0805 UTC).[54]
On January 16, 2025, 2:03 AM EST (0703 UTC), New Glenn launched for the first time.[55] Blue Origin reached orbit on its first attempt, injecting the GS-2 upper stage and the Blue Ring Pathfinder payload into medium earth orbit. Blue Origin stated that So You're Telling Me There's a Chance was lost on descent. Telemetry showed that the booster was traveling at an approximate speed of Mach 5.5 at an altitude of 84,226 ft (25.7 km) before it was deemed lost.[56][57]
Following the unsuccessful landing, a mishap investigation into the atmospheric reentry of the returning booster was led by Blue Origin, with the involvement and review by the FAA.[58] This investigation was successfully completed by March 31, 2025.[59]
First recovery via Landing Platform Vessel 1
[edit]On November 13, 2025, a New Glenn first stage, GS1-2 Never Tell Me the Odds, successfully landed on the Landing Platform Vessel Jacklyn positioned around 375 miles (600 km; 330 nmi) offshore in the Atlantic Ocean. This made Blue Origin the second company, behind SpaceX and its Falcon rockets, to successfully deploy a spacecraft in orbit while landing the vehicle's booster.[60][61]
Static fire test explosion
[edit]On May 28, 2026, a New Glenn rocket named No, It's Necessary exploded during a static fire test at Cape Canaveral Launch Complex 36. The explosion destroyed the vehicle and severely damaged the launch site, Blue Origin's only operational facility. No injuries were reported.[62] The loss of the vehicle and damage to Launch Complex 36 has disrupted Blue Origin's launch schedule.[63] According to industry sources cited by Ars Technica, repairs to the launch complex or completion of an alternative launch facility could take more than a year.[64] It is still unclear how the incident will affect planned New Glenn launches including the Blue Moon lunar cargo and crew landers as well as other payloads such as Amazon LEO.[65][66]
New Glenn 9×4
[edit]On November 20, 2025, Blue Origin announced the development of a new super heavy-lift version of New Glenn, designated New Glenn 9×4.[67] The variant will use nine BE-4 engines on its first stage and four BE-3U engines on its second stage. According to the company, it will be capable of launching more than 70,000 kilograms (150,000 lb) to Low Earth orbit, over 14,000 kilograms (31,000 lb) on a direct insertion to geosynchronous orbit, and more than 20,000 kilograms (44,000 lb) to a trans-lunar injection trajectory. It will also feature an enlarged payload fairing measuring 8.7 meters (29 ft) in diameter.[7][68] To support the 9x4 variant Blue Origin plans to build a new LC-36B pad that is larger than the rebuilt LC-36A.[69]
An image released by Blue Origin CEO Dave Limp depicted the New Glenn 9×4 as taller than the Saturn V.[7][68] While the company did not provide an official timeline, media reports indicated that the variant could enter service as early as 2027. Blue Origin stated that both the 7×2 and 9×4 versions of the rocket are intended to operate concurrently. Media reports also noted that the 9×4 configuration would offer lift capacity approaching that of NASA's Space Launch System (SLS) rocket while retaining a reusable first stage (which SLS does not have) and a larger payload fairing, and could cost less than one-tenth as much per launch.[7]
Description and technical specifications
[edit]
New Glenn is a 7 m (23 ft) diameter two-stage orbital launch vehicle with a reusable first stage[31] and an expendable second stage.[32] A configuration using a third stage titled GS3 was announced by Blue Origin featuring a 5.5 m (18 ft) composite tank and a BE-7 engine. The third stage will allow for higher energy orbits, without reducing cargo carrying capacity.[8]
The first stage, called GS1,[70][71] is designed to be reusable for a minimum of 25 flights,[36] and lands vertically, a technology previously developed by Blue Origin and tested in 2015–2016 on its New Shepard suborbital launch vehicle. The second stage, called GS2,[70][71] shares the same diameter and is "roughly 88 feet (26.8 meters) tall"[72] and is expendable. Both stages use orthogrid aluminum tanks with welded aluminum domes and common bulkheads. Both stages also use autogenous pressurization.[73]
The first stage is powered by seven BE-4 methane/oxygen engines—designed and manufactured by Blue Origin—producing 17,000 kN (3,800,000 lbf) of liftoff thrust.[5] Its liquid oxygen propellant tank has a volume of 30,000 cu ft (850 m3) while the fuel tank can store almost 25,000 cu ft (710 m3) of liquid methane.[74] The previous engines are planned to be replaced with a upgraded version of BE-4 named Northstar that was designed to have higher performance, and lower cost.[8]The second stage is powered by two BE-3U vacuum optimized engines, also designed and manufactured by Blue Origin, using hydrogen/oxygen as propellants.
The company stated in 2017 that the planned full operational payload capacity of the two-stage version of New Glenn would be 13,000 kg (29,000 lb) to GTO and 45,000 kg (99,000 lb) to a 51.6° inclined LEO,[5] though the initial operating capability could be somewhat lower.[73] As of 2018[update], dual-satellite launches were intended to be offered after the first five flights.[75]
Launches of New Glenn are made from the Cape Canaveral Space Force Station in Florida, with Launch Complex 36 (LC-36) leased to Blue Origin in 2015 in support of the New Glenn program.[18][17] On April 14, 2026, Blue Origin and the U.S. Space Force announced plans to give New Glenn polar orbit capabilities through building a West Coast launch facility at Vandenberg Space Force Base in California, to be called Space Launch Complex 14 (SLC-14).[76]
The first stage boosters of New Glenn are intended to be reusable, and were originally intended to be recovered downrange on the Atlantic Ocean via their landing platform ship Jacklyn, which would have acted as a floating movable landing platform. The hydrodynamically stabilized ship would have increased the likelihood of successful recovery in rough seas.[31]
Manufacturing
[edit]The main assembly of the New Glenn launch vehicle will occur in the Blue Origin rocket manufacturing facility in Florida, near Launch Complex 36 (LC-36) which the company leased from Spaceport Florida. Launch Complex 36 (LC-36) has hosted more than 100 launches, formerly launching the Atlas II and Atlas III rockets.[77][78]
Tooling and equipment for the factory began to be ordered and built in 2015. In July 2018, the build of the largest device, a 16 m (52 ft) tall × 41 m (135 ft) long × 13 m (43 ft) wide Ingersoll "Mongoose" cryogenic-tank and fairing fabrication machine, was completed after a three-year design/build process. It was to be installed in the Florida facility in Exploration Park later in 2018.[79][needs update] As of September 2018[update], Blue Origin had invested over $1 billion in its Florida manufacturing facility and launch site, and stated it intended to spend much more going forward.[31][80]
Launch services
[edit]Blue Origin planned as of 2018 to offer both single-payload dedicated flights and, after the fifth launch, dual-manifesting of large communications satellites to be transported to geostationary transfer orbit (GTO).[81] All contracted launches from the start will feature a reusable first stage, so just like the practice in commercial aircraft transport, landing conditions can affect the timing and flight parameters of a launch.[81]
Launch service customers
[edit]By 2018, Blue Origin had contracts in place with four customers for New Glenn flights. Eutelsat, Thailand startup mu Space Corp and SKY Perfect JSAT have geosynchronous orbit communications satellite launches planned after 2020, while internet satellite constellation fleet operator OneWeb had an agreement by 2018 for five launches.[29][30][82]
In January 2019, Telesat signed a multi-launch contract "to launch satellites for its future low-Earth-orbit broadband constellation on multiple New Glenn missions" and thus is Blue Origin's fifth customer.[83]
In 2022, Amazon announced that it had contracted 12 flights of New Glenn, with an option for 15 more, for deployment of the Kuiper satellite constellation.[84]
In February 2023, NASA announced that it had selected Blue Origin to launch the ESCAPADE spacecraft to Mars.[85] In May 2024, it was announced the spacecraft had reached substantial completion in preparation for launch later in the year;[86] however NASA subsequently moved the ESCAPADE payload from the first flight of New Glenn to a later flight of the rocket.[87]

In November 2024, AST SpaceMobile selected Blue Origin to launch some of its Block 2 satellites. In April 2026, an upper stage malfunction on this launch left BlueBird 7 in a lower-than-planned orbit, and the satellite was to be deorbited.[88][89]
In April 2025, Space Systems Command awarded a National Security Space Launch Phase 3 Lane 2 contract to Blue Origin. As the third provider, Blue Origin is projected to be awarded 7 flights, with an anticipated value of $2.4 billion.[90]
Schedule-oriented launch cadence
[edit]Blue Origin intends to contract its launch services in a different structure compared to contract options that have been traditionally offered in the commercial launch market. The company has stated they will contract to aim to have a regular launch cadence of up to eight launches a year. If one of the payload providers for a multi-payload launch is not ready on time, Blue stated in 2018 that they intended to hold to the launch timeframe, and fly the remaining payloads on time at no increase in price.[81] This is different from how dual-launch manifested contracts have been traditionally handled by Arianespace (Ariane 5 and Ariane 6) and Mitsubishi Heavy Industries (H-IIA and H3). SpaceX and International Launch Services can offer dual-launch contracts, but prefer dedicated missions.[81]
Funding
[edit]The development and manufacture of the New Glenn is being funded by Jeff Bezos, founder of Amazon,[18][91] and the Department of the Air Force. Initially funded entirely by Bezos, after 2019 New Glenn will also receive $500 million in funding under the United States Space Force National Security Space Launch (NSSL) program.[92] By September 2017, Bezos had invested $2.5 billion into New Glenn.[21]
Launch history
[edit]Statistics
[edit]Launch outcomes
[edit]- Success
- Partial failure
- Failure
- Planned
List of launches
[edit]2025
[edit]| Flight No. | Date and time (UTC) | Booster[a] | Launch site | Payload | Payload mass | Orbit | Customer | Launch outcome |
Booster landing |
|---|---|---|---|---|---|---|---|---|---|
| NG-1 | January 16, 2025 07:03[93] |
GS1-1 So You're Telling Me There's a Chance[94] |
Cape Canaveral, LC‑36A | Blue Ring Pathfinder[95] | Unknown | MEO | Blue Origin | Success | Failure (Jacklyn) |
| Maiden/demonstration flight of New Glenn, carrying the Blue Ring Pathfinder.[95] First of four National Security Space Launch demonstration flights for New Glenn.[96] The January 13 launch attempt was scrubbed due to problems with the rocket.[97] The second stage with non-separable payload was inserted into a 2,400 km (1,500 mi; 1,300 nmi) × 19,300 km (12,000 mi; 10,400 nmi) medium Earth orbit at an inclination of 30°.[98] The first stage was lost and failed to land.[99] | |||||||||
| NG-2 | November 13, 2025 20:55[100] |
GS1-2-1 Never Tell Me The Odds[101] |
Cape Canaveral, LC‑36A | ESCAPADE (Blue & Gold)[102] |
1,070 kg (2,360 lb)[103] | Sun-Earth L2 to Areocentric | NASA | Success | Success (Jacklyn) |
| Second of four National Security Space Launch demonstration flights for New Glenn, carrying the ESCAPADE (Escape and Plasma Acceleration and Dynamics Explorers) mission for NASA as part of their low-cost SIMPLEx program, aiming to investigate Mars' magnetosphere and a technology demonstration payload named Viasat InRange for Viasat.[104][105][106] New Glenn deployed two spacecraft to a loiter orbit around the Earth-Sun L2 Lagrange point. The upper stage was placed into a heliocentric disposal orbit. NASA paid Blue Origin about $20 million for the launch.[107] Delayed from October 13, 2024; ESCAPADE was originally intended to be launched on the debut flight of New Glenn.[96] A launch attempt on November 9, 2025, was scrubbed due to weather conditions, with a future launch date scheduled for November 12.[108] This was delayed a day further due to a solar storm.[109] First successful first stage landing for New Glenn.[110] | |||||||||
2026
[edit]| Flight No. | Date and time (UTC) | Booster[a] | Launch site | Payload | Payload mass | Orbit | Customer | Launch outcome |
Booster landing |
|---|---|---|---|---|---|---|---|---|---|
| NG-3 | April 19, 2026 11:25[111] | GS1-2-2 Never Tell Me The Odds[101] |
Cape Canaveral, LC‑36A | BlueBird 7[112] | 6,100 kg (13,400 lb)[113] | LEO | AST SpaceMobile | Failure | Success (Jacklyn) |
| First mission for a commercial customer.[114] First launch of an AST SpaceMobile Block 2 BlueBird satellite on New Glenn to expand cellular broadband satellite constellation.[115] Multi-launch contract was signed in November 2024.[116] First launch of a reused New Glenn first stage, previously flying on ESCAPADE in November 2025.[117] The satellite was intended to be deployed to a 460 km (290 mi; 250 nmi) low Earth orbit at an inclination of 49.4°.[118][119] Due to an issue with the second stage,[120] the satellite was left in an off-nominal 265 km (165 mi; 143 nmi) × 465 km (289 mi; 251 nmi) × 43° orbit,[121] too low to sustain operations, forcing it to be de-orbited.[122] In response, the Federal Aviation Administration grounded New Glenn and required a mishap investigation.[123] On May 22, the FAA cleared New Glenn to return to service.[124] | |||||||||
Planned launches
[edit]Launches are expected to take place "no earlier than" (NET) the listed date.
2027
[edit]| Date and time (UTC) | Booster[a] | Launch site | Payload | Payload mass | Orbit | Customer | ||
|---|---|---|---|---|---|---|---|---|
| January 2027[125] | Unknown | Cape Canaveral, LC‑36 | Blue Ring 1 (BR-1)[126] | Unknown | LEO | Blue Origin | ||
| Return-to-flight mission after the on-pad explosion in May 2026. First flight of Blue Ring, Blue Origin's maneuverable space vehicle.[127] The spacecraft will be deployed to a 400 km (250 mi; 220 nmi) × 45,000 km (28,000 mi; 24,000 nmi) × 28.5° elliptical Earth orbit, designated Demonstration Orbit 0 (DO-0).[126] | ||||||||
| Q1 2027[128] | Unknown | Cape Canaveral, LC‑36 | BlueBird Block 2 × 3[128] | 12,600 kg (27,800 lb)[129] | LEO | AST SpaceMobile | ||
| Second launch of AST SpaceMobile Block 2 BlueBird satellites on New Glenn to expand cellular broadband satellite constellation.[115] Multi-launch contract was signed in November 2024.[116] Subsequent launches are expected to carry 6 or 8 satellites.[130] | ||||||||
| Q1 2027[131] | Unknown | Cape Canaveral, LC‑36 | LeoSat × 48 (LN‑01)[132] | ~27,000 kg (60,000 lb)[133] | LEO | Amazon (Amazon Leo) | ||
| The first set of Amazon Leo (formerly Project Kuiper) satellites to launch on New Glenn was planned for June 4, 2026.[134][132] However, during a static fire test on May 28, 2026, booster GS1-3 (No, It's Necessary) and an upper stage exploded and were destroyed.[135] The satellites were not on board the vehicle at the time of the explosion.[136] | ||||||||
| Q1 2027[137] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK1-101 (Endurance)[138][139] | 21,715 kg (47,873 lb)[140] | LEO to TLI | NASA (CLPS) | ||
| Will carry a Blue Moon Mark 1 lander, planned to make a landing on the Moon. The lander will be deployed into a 185 km (115 mi; 100 nmi) × 3,300–3,700 km (2,100–2,300 mi; 1,800–2,000 nmi) low Earth orbit with an inclination of 28.5–51.6°, before the spacecraft propels itself with a trans-lunar injection (TLI) burn.[141][142] During the mission Blue Moon will carry the Stereo Cameras for Lunar Plume Surface Studies (SCALPSS) and the Laser Retroreflective Array (LRA), as part of a task order from NASA's Commercial Lunar Payload Services (CLPS) program, awarded in July 2024.[143][144][145][146] | ||||||||
| Q2 2027[137] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK2-D[147] | Unknown | LEO | NASA (Artemis) | ||
| Artemis III will include a rendezvous and docking of Orion and the Blue Moon Earth Orbit Rendezvous Demonstration Vehicle[148], also known as the MK2-D[147]. The mission will execute in-space tests of the docked vehicles, integrated checkout of life support, communications, and propulsion systems, as well as tests of the new Extravehicular Activity (xEVA) suits.[149] | ||||||||
| 2027[150] | Unknown | Cape Canaveral, LC‑36 | LeoSat × 48 (LN‑02)[132] | Unknown | LEO | Amazon (Amazon Leo) | ||
| Second launch of Amazon Leo (formerly Project Kuiper) satellites on New Glenn to expand LEO internet constellation. Amazon Leo was also founded by Blue Origin founder Jeff Bezos; however, the two companies are not directly connected. Initial launches of Amazon Leo on New Glenn will carry 48 satellites, with payload sizes expected to increase over time as vehicle performance is improved.[132] | ||||||||
| Q4 2027[151] | Unknown | Unknown | NRO Task Order-4[152] | Unknown | Unknown | NRO (NSSL) | ||
| First National Security Space Launch (NSSL) Phase 3 Lane 1 task order for New Glenn, providing for one launch of a mission set for the NRO to be completed between Q4 2027 and Q1 2028.[153] New Glenn was previously onboarded to the Phase 3 Lane 1 program in June 2024.[154] | ||||||||
| Q4 2027[155] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK1-102 (VIPER)[156][139] | Unknown | TLI | NASA (CLPS) | ||
| Will carry the VIPER rover,[157] which was previously cancelled in 2024.[158] | ||||||||
2028
[edit]| Date and time (UTC) | Booster[a] | Launch site | Payload | Payload mass | Orbit | Customer |
|---|---|---|---|---|---|---|
| Q1 2028[137] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK1-103 (LTV)[139] | Unknown | TLI | NASA (CLPS) |
| Will carry a lunar terrain vehicle (LTV) from Astrolab or Lunar Outpost.[159] | ||||||
| Q1 2028[137] | Unknown | Cape Canaveral, LC‑36 | Blue Moon Mark 2 Lander | Unknown | LEO[160] | NASA (Artemis)[161] |
| Sustaining HLS uncrewed lunar demo for Artemis. | ||||||
| 2028[162] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK1-104 (LTV)[139] | Unknown | TLI | NASA (CLPS) |
| Will carry a lunar terrain vehicle (LTV) from Astrolab or Lunar Outpost.[159] | ||||||
| Q4 2028[163] | Unknown | Cape Canaveral, LC‑36 | Firefly Elytra / MoonFall[164] | Unknown | Unknown | NASA (CLPS) |
| Launch of the Firefly Elytra orbital transfer vehicle, carrying propulsive drones built by JPL as part of NASA's MoonFall mission.[165] | ||||||
| Q4 2028[163] | Unknown | Cape Canaveral, LC‑36 | Blue Moon MK1-105 (PROMISE)[166] | Unknown | Unknown | NASA (CLPS) |
| Launch of the fifth Blue Moon MK1 cargo lander, carrying NASA's Polar Rover for Observation, Mapping, and In-Situ Exploration, or PROMISE.[166] | ||||||
| Q4 2028[167] | Unknown | Cape Canaveral, LC‑36 | Unknown | Unknown | Unknown | U.S. Space Force |
| Blue Origin, as the Requirement 3 provider is projected to be awarded seven NSSL Phase 3 Lane 2 missions starting in Order Year 3 (FY 2027).[168][167] With a nominal two-year integration period[169], these missions would launch no earlier than FY 2029. | ||||||
2029 and beyond
[edit]| Date and time (UTC) | Booster[a] | Launch site | Payload | Payload mass | Orbit | Customer |
|---|---|---|---|---|---|---|
| Q1 2029[170] | Unknown | Cape Canaveral, LC‑36 | Project Suncatcher[170] | Unknown | SSO | |
| Google’s first dedicated heavy-lift launch for Project Suncatcher, deploying satellites equipped with Tensor Processing Units (TPUs) for AI compute capacity.[171] | ||||||
| 2033[172] | Unknown | Cape Canaveral, LC‑36 | Blue Moon Mark 2 Lander | Unknown | Unknown | NASA (Artemis) |
| The agency expects Blue Origin to deliver a lunar surface habitat no earlier than fiscal year 2033 using a cargo version of its crewed human lander.[172] | ||||||
| TBD | Unknown | Cape Canaveral, LC‑36 | Blue Ring[164] | Unknown | Unknown | NASA (VADR) |
| Launch of a Blue Ring spacecraft, carrying a lunar lander or another payload intended for NASA's Moon Base.[164] First of two launches awarded in November 2026 as part of NASA's Venture-Class Acquisition of Dedicated and Rideshare (VADR) program.[163] | ||||||
| TBD | Unknown | Cape Canaveral, LC‑36 | Blue Ring[164] | Unknown | Unknown | NASA (VADR) |
| Launch of a Blue Ring spacecraft, carrying a lunar lander or another payload intended for NASA's Moon Base.[164] Second of two launches awarded in November 2026 as part of NASA's Venture-Class Acquisition of Dedicated and Rideshare (VADR) program.[163] | ||||||
| TBD | Unknown | Cape Canaveral, LC‑36 | Blue Moon Mark 2 Lander | Unknown | LEO[160] | NASA (Artemis)[161] |
| Sustaining HLS crewed lunar demo for Artemis. Originally intended for Artemis V,[173] the Artemis IV landing was opened to whichever lander was ready first, as part of NASA's efforts to accelerate the program.[174] | ||||||
| TBD | Unknown | Cape Canaveral, LC‑36 | Unknown | Unknown | Unknown | Eutelsat[175] |
| Eutelsat now says it has no specific launch date slated for New Glenn, stating: "New Glenn is part of our portfolio of launch options and will be activated based on our future needs taking into consideration industry conditions at the time. Our launch contract with Blue Origin for a Eutelsat unspecified satellite on a New Glenn rocket is still current. It will help to diversify options for access to space."[176] | ||||||
| TBD | Unknown | Cape Canaveral, LC‑36 | Unknown | Unknown | Unknown | Telesat[177] |
| Telesat signed a multi-launch agreement with Blue Origin in 2019 for deployment of their LEO constellation.[177] As of 2023, no specific launches under the agreement had been announced, although Telesat continues to retain launch optionality on New Glenn.[178] | ||||||
See also
[edit]- List of New Glenn launches
- List of New Glenn boosters
- Space launch market competition
- Falcon Heavy (SpaceX)
- Ariane 6 (Arianespace)
- Vulcan Centaur (United Launch Alliance)
- SpaceX Starship
- Space Launch System (NASA/Boeing), not intended for commercial satellite launch
- Saturn C-3 (1962 NASA Saturn design for Apollo EOR), same lift capacity
- Comparison of orbital launch systems
- Comparison of orbital launcher families
- Blue Origin recovery vessel
Notes
[edit]- 1 2 3 4 5 The final number of the string indicates the flight count. For example, GS1-2‑1 and GS1-2‑2 represent the first and second flights of booster GS1-2, Never Tell Me The Odds. Boosters without this suffix were expended on their first flight. Additionally, missions where boosters are making their first flight are shown with a mint-colored background.
References
[edit]- ↑ Foust, Jeff (March 30, 2019). "Blue Origin Studying Repurposing of New Glenn Upper Stages". Space.com. Archived from the original on April 26, 2024. Retrieved April 26, 2024.
- ↑ Sheetz, Michael (April 5, 2022). "Amazon signs massive rocket deal with 3 firms, including Bezos' Blue Origin, to launch internet satellites". CNBC. Archived from the original on June 11, 2024. Retrieved June 11, 2024.
- ↑ Bogaisky, Jeremy. "With New Glenn Launch, Bezos Looks To Break Musk's Stranglehold On Space". Forbes. Retrieved January 14, 2025.
- ↑ "Inside look at the New Glenn 7 meter fairing". youtube.com. March 3, 2020. Archived from the original on March 10, 2021. Retrieved January 25, 2021.
- 1 2 3 4 5 6 Berger, Eric (March 7, 2017). "Blue Origin releases details of its monster orbital rocket". Ars Technica. Archived from the original on December 10, 2019. Retrieved March 8, 2017.
- 1 2 Foust, Jeff (March 7, 2017). "Eutelsat first customer for Blue Origin's New Glenn". SpaceNews. Archived from the original on September 22, 2021. Retrieved March 30, 2018.
- 1 2 3 4 Berger, Eric (November 20, 2025). "Blue Origin revealed some massively cool plans for its New Glenn rocket". Ars Technica. Retrieved November 20, 2025.
- 1 2 3 4 5 6 7 Berger, Eric (November 6, 2026). "Blue Origin says it is building a higher-performing rocket engine at 1/4 the cost". Ars Technica. Retrieved November 10, 2026.
- ↑ "Performance Website - Home". elvperf.ksc.nasa.gov. Archived from the original on October 28, 2021. Retrieved May 28, 2024.
- 1 2 Reich, Eugen (2020). Raketen: Die Internationale Enzyklopädie. Motorbuch Verlag. p. 167. ISBN 978-3-613-04260-5.
- 1 2 Foust, Jeff (January 11, 2025). "A timeline for the Blue Origin New Glenn launch, scheduled for Sunday between 1-4am EST". X (formerly Twitter). Archived from the original on January 12, 2025. Retrieved January 11, 2025.
- ↑ "New Glenn Expands Its Reach with GS3: Heavy-Lift Performance Direct to GEO and Beyond". Blue Origin (Press release). November 5, 2026. Retrieved November 10, 2026.
- 1 2 "Blue Ring Pathfinder Payload Ready for Launch; Blue Origin's New Glenn on Track for This Year | Blue Origin". Blue Origin. Archived from the original on November 7, 2025. Retrieved January 3, 2026.
- ↑ "About Blue". Blue Origin. Archived from the original on March 25, 2013. Retrieved April 5, 2013.
- ↑ "Blue Origin Debuts the American-made BE-3 Liquid Hydrogen Rocket Engine | Blue Origin". Blue Origin. Archived from the original on June 8, 2026. Retrieved November 15, 2026.
- ↑ Harwood, William (September 15, 2015). "Jeff Bezos plans to boost humans into space from Cape Canaveral". CBS News. Archived from the original on August 22, 2016. Retrieved September 17, 2015.
Bezos: "You cannot afford to be a space-fairing civilization if you throw the rocket away every time you use it. ... We have to be focused on reusability, we have to be focused on lowering the cost of space."
- 1 2 Boyle, Alan (March 5, 2016). "Jeff Bezos lifts curtain on Blue Origin rocket factory, lays out grand plan for space travel that spans hundreds of years". GeekWire. Archived from the original on March 10, 2016. Retrieved March 9, 2016.
- 1 2 3 Bergin, Chris (September 12, 2016). "Blue Origin introduce the New Glenn orbital LV". NASASpaceFlight.com. Archived from the original on October 27, 2018. Retrieved September 13, 2016.
- ↑ "Blue Origin Reveals Its Heavy Lift Rocket — New Glenn". Retrieved November 15, 2026.
- ↑ Jeff Bezos' interview at Satellite 2017 (23 min) Archived November 18, 2020, at the Wayback Machine, circa March 2017
- 1 2 3 Henry, Caleb (September 12, 2017). "Blue Origin enlarges New Glenn's payload fairing, preparing to debut upgraded New Shepard". SpaceNews. Archived from the original on September 22, 2021. Retrieved October 25, 2017.
- ↑ Wall, Mike (January 22, 2019). "Blue Origin Video Shows Off Updated Design of Huge New Glenn Rocket". SPACE.com. Archived from the original on January 25, 2019. Retrieved January 28, 2019.
- ↑ Johnson, Eric M. (August 2, 2018). "Bezos throws cash, engineers at rocket program as space race accelerates". Reuters. Archived from the original on August 3, 2018. Retrieved August 4, 2018.
- ↑ Berger, Eric (July 24, 2018). "Four huge rockets are due to debut in 2020 — will any make it?". Ars Technica. Archived from the original on August 6, 2018. Retrieved August 6, 2018.
a sense of urgency in Europe about the need to begin flying the Ariane 6 to become more competitive with the likes of SpaceX ... Like ArianeGroup, United Launch Alliance (ULA) has developed a new rocket with the intention to compete with SpaceX.
- ↑ Erwin, Sandra (October 10, 2018). "Air Force awards launch vehicle development contracts to Blue Origin, Northrop Grumman, ULA". SpaceNews. Retrieved October 11, 2018.
{{cite news}}: CS1 maint: deprecated archival service (link) - 1 2 "Blue Origin delays first launch of New Glenn to late 2022". SpaceNews. February 25, 2021. Archived from the original on September 22, 2021. Retrieved February 25, 2021.
- ↑ Boyle, Alan (October 10, 2018). "Blue Origin resets schedule: First crew to space in 2019, first orbital launch in 2021". GeekWire. Archived from the original on October 22, 2018. Retrieved January 28, 2019.
- ↑ Clark, Stephen (February 4, 2019). "Telesat taps Blue Origin to launch broadband satellite fleet". Spaceflight Now. Archived from the original on April 25, 2019. Retrieved February 4, 2019.
- 1 2 Foust, Jeff (September 26, 2017). "Blue Origin signs up third customer for New Glenn". SpaceNews. Archived from the original on April 16, 2024. Retrieved January 28, 2019.
- 1 2 Clark, Stephen (April 13, 2018). "Blue Origin's orbital rocket in the running to receive U.S. military investment". spaceflightnow.com. Spaceflight Now. Archived from the original on April 29, 2018. Retrieved April 28, 2018.
- 1 2 3 4 Burghardt, Thomas (September 20, 2018). "Building on New Shepard, Blue Origin to pump a billion dollars into New Glenn readiness". NASASpaceFlight.com. Archived from the original on March 31, 2019. Retrieved September 22, 2018.
- 1 2 Foust, Jeff [@jeff_foust] (February 12, 2019). "Mowry: reusing the second stage of New Glenn is not on our roadmap right now; really hard problem technically. #CST2019" (Tweet). Retrieved December 11, 2019 – via Twitter.
- 1 2 Berger, Eric (July 27, 2021). "Blue Origin has a secret project named "Jarvis" to compete with SpaceX". Ars Technica. Retrieved May 31, 2026.
- ↑ Roulette, Joey (December 18, 2020). "Bezos' Blue Origin to deliver first flight-ready rocket engines next summer – ULA CEO". Reuters. Archived from the original on December 23, 2020. Retrieved January 25, 2021.
- ↑ Berger, Eric (March 1, 2021). "Blue Origin's massive New Glenn rocket is delayed for years. What went wrong?". Ars Technica. Archived from the original on March 20, 2021. Retrieved March 3, 2021.
- 1 2 "New Glenn". Blue Origin. May 20, 2021. Archived from the original on September 12, 2017. Retrieved May 1, 2019.
New Glenn's fully reusable first stage is designed for a minimum of 25 flights, making it competitive for a variety of launch markets.
- ↑ Foust, Jeff (March 23, 2022). "Vulcan Centaur on schedule for first launch in 2022 as New Glenn slips". SpaceNews. Retrieved March 24, 2022.
- ↑ Tribout, Richard (January 10, 2024). "Mammoth rocket stage for Blue Origin New Glenn goes for sideways ride on Space Coast". Orlando Sentinel. Archived from the original on January 10, 2024. Retrieved January 10, 2024.
- ↑ "Blue Origin Debuts New Glenn on Our Launch Pad". Blue Origin. February 21, 2024. Archived from the original on February 22, 2024. Retrieved April 1, 2024.
- ↑ "Instagram". www.instagram.com. Archived from the original on May 24, 2024. Retrieved May 24, 2024.
- 1 2 Berger, Eric (August 24, 2021). "First images of Blue Origin's "Project Jarvis" test tank". Ars Technica. Retrieved August 20, 2025.
- ↑ Kuhr, Jack (September 11, 2024). "Jeff Bezos Opens Up About New Glenn, Discusses Reusability and Manufacturing". Payload. Retrieved August 20, 2025.
- ↑ Berger, Eric (January 27, 2025). "With successful New Glenn flight, Blue Origin may finally be turning the corner". Ars Technica. Retrieved August 20, 2025.
- ↑ "FCC Space Licenses (@FccSpace) on X". X (formerly Twitter). Archived from the original on June 13, 2024. Retrieved June 13, 2024.
- ↑ Sheetz, Michael (June 13, 2024). "Bezos' Blue Origin joins SpaceX, ULA in winning bids for $5.6 billion Pentagon rocket program". CNBC. Archived from the original on June 13, 2024. Retrieved June 14, 2024.
- ↑ Wall, Mike (September 4, 2024). "Blue Origin droneship arrives in Florida ahead of 1st New Glenn launch (video, photos)". Space.com. Archived from the original on September 5, 2024. Retrieved September 5, 2024.
- ↑ "New Glenn Inaugural Flight". Next Spaceflight. September 6, 2024. Archived from the original on September 10, 2024. Retrieved September 7, 2024.
- ↑ Limp, Dave [@davill] (September 13, 2024). "We have a cool history naming key Blue hardware that dates back to New Shepard. We're calling New Glenn's first booster "So You're Telling Me There's a Chance." Why? No one has landed a reusable booster on the first try. Yet, we're going for it, and humbly submit having good confidence in landing it. But like I said a couple of weeks ago, if we don't, we'll learn and keep trying until we do" (Tweet). Retrieved September 13, 2024 – via X (formerly Twitter).
- ↑ "New Glenn Completes Second Stage Hotfire". Blue Origin. September 23, 2024. Archived from the original on November 10, 2024. Retrieved October 21, 2024.
- ↑ "Dave Limp (@davill) on X". X (formerly Twitter). Archived from the original on November 7, 2024. Retrieved October 30, 2024.
- ↑ Tribou, Richard; Sentinel, Orlando. "Blue Origin's New Glenn rocket goes vertical on the launch pad". phys.org. Archived from the original on November 25, 2024. Retrieved November 28, 2024.
- ↑ Edwards, Brooke (December 19, 2024). "Blue Origin New Glenn launch date inches closer as rocket sees testing at Cape Canaveral". Florida Today. Archived from the original on December 27, 2024. Retrieved December 20, 2024.
- ↑ Berger, Eric (December 27, 2024). "After a 24-second test of its engines, the New Glenn rocket is ready to fly". Ars Technica. Archived from the original on December 28, 2024. Retrieved December 27, 2024.
- ↑ [SCRUB] Blue Origin's New Glenn Rocket Attempts to Launch and Land for the First Time. NASASpaceflight. January 13, 2025. Archived from the original on January 17, 2025. Retrieved January 17, 2025 – via YouTube.
- ↑ Foust, Jeff (January 16, 2025). "New Glenn reaches orbit on first launch". SpaceNews. Retrieved October 26, 2026.
- ↑ New Glenn Mission NG-1 Webcast. Blue Origin. January 13, 2025. Archived from the original on January 18, 2025. Retrieved January 16, 2025 – via YouTube.
- ↑ "New Glenn NG-1 Mission Updates". Blue Origin. Archived from the original on January 24, 2025. Retrieved January 16, 2025.
- ↑ FAA requires mishap investigation for failed New Glenn landing, Jeff Foust, Space News, January 18, 2025.
- ↑ Foust, Jeff (March 31, 2025). "Investigation into failed New Glenn landing completed". SpaceNews.
- ↑ Mike Wall (November 15, 2025). "Watch Blue Origin's huge New Glenn rocket ace its epic landing on a ship at sea (video)". Space. Archived from the original on November 18, 2025. Retrieved November 18, 2025.
- ↑ "Blue Origin nails booster landing on second New Glenn launch". Aerospace America. November 13, 2025. Archived from the original on December 14, 2025. Retrieved January 19, 2026.
- ↑ Berger, Eric (May 28, 2026). "The most spectacular rocket explosion since N1 just happened in Florida". Ars Technica. Retrieved May 28, 2026.
- ↑ Sriram, Akash (May 30, 2026). "Blue Origin faces months of delays after rocket explosion damages launch pad". Reuters. Retrieved May 30, 2026.
- ↑ Berger, Eric (May 29, 2026). "Here's why the failure of Blue Origin's New Glenn rocket is so catastrophic". Ars Technica. Retrieved May 30, 2026.
- ↑ Ghosh, Pallab (May 29, 2026). "Blue Origin rocket explosion could damage Nasa's Moon timetable". BBC Online. Retrieved May 29, 2026.
- ↑ Kluger, Jeffrey (May 29, 2026). "Blue Origin Explosion Will Set Back NASA's Moon Mission". Time. ISSN 0040-781X. Retrieved May 29, 2026.
- ↑ "New Glenn Update". Blue Origin. November 20, 2025. Retrieved November 20, 2025.[dead link]
- 1 2 O'Kane, Sean (November 20, 2025). "Blue Origin reveals a super-heavy variant of its New Glenn rocket that is taller than a Saturn V". TechCrunch. Retrieved November 20, 2025.
- ↑ Berger, Eric (June 2, 2026). "Blue Origin has set a very aggressive return-to-flight timeline". Ars Technica. Retrieved June 10, 2026.
- 1 2 Giulia Guerrieri (September 9, 2022). "Vulcan Centaur and New Glenn". impulso.space. Archived from the original on August 16, 2024. Retrieved August 16, 2024.
- 1 2 Dodd, Tim (August 15, 2024). First Look Inside Blue Origin's New Glenn Factory w/ Jeff Bezos!. Everyday Astronaut. Archived from the original on May 5, 2025. Retrieved January 13, 2025 – via YouTube.
- ↑ "New Glenn Completes Second Stage Hotfire". Blue Origin. September 23, 2024. Archived from the original on November 10, 2024. Retrieved September 24, 2024.
- 1 2 "New Glenn Payload User Guide". Blue Origin. October 2018. Archived from the original on May 14, 2019. Retrieved May 1, 2019.
- ↑ "While we wait for regulatory approvals for hotfire and launch, here's a photo (and a bonus video) of our "chilling" GS1..." Archived from the original on December 8, 2024.
- ↑ Henry, Caleb (July 12, 2018). "Blue Origin to offer dual launch with New Glenn after fifth mission". SpaceNews. Archived from the original on April 16, 2024. Retrieved July 12, 2018.
- ↑ "U.S. Space Force selects Jeff Bezos' Blue Origin for Vandenberg site". KSBY News. April 14, 2026. Archived from the original on April 15, 2026. Retrieved April 14, 2026.
- ↑ "Atlas II". nextspaceflight.com. Archived from the original on March 13, 2025. Retrieved February 11, 2025.
- ↑ "Atlas III". nextspaceflight.com. Archived from the original on January 13, 2025. Retrieved February 11, 2025.
- ↑ Guerrero, Isaac (July 17, 2018). "Rockford-made machine to build parts for next-generation rockets". Rockford Star. Retrieved August 3, 2018.
It took three years to design and manufacture the Sasquatch-sized machine, which stands 51 feet tall, 136 feet long and 43 feet wide. The machine ... will manufacture cryogenic tanks that will be filled with liquid oxygen and hydrogen to fuel rockets. The machine also will build fairings
- ↑ "New Glenn First Stage Tank Production". Blue Origin. March 5, 2020.[permanent dead link]
- 1 2 3 4 Henry, Caleb (July 12, 2018). "Blue Origin to offer dual launch with New Glenn after fifth mission". SpaceNews. Archived from the original on April 16, 2024. Retrieved August 5, 2018.
Blue Origin's McFarland said Blue Origin won't let schedule disruptions with one payload impact the co-passenger in dual-launch missions, even if it means splitting the missions in two. "We are not going to [let this] hold back or delay a launch", he said. "We are going for a cadence of up to eight times per year where we will launch. If we don't have a second, we still go as a single. So that's the plan, [with] the same price point for the launch service for the customer".
- ↑ Henry, Caleb (March 12, 2018). "Blue Origin signs Sky Perfect JSAT as fourth New Glenn launch customer". SpaceNews. Archived from the original on April 16, 2024. Retrieved June 28, 2018.
- ↑ Henry, Caleb (January 31, 2019). "Telesat signs New Glenn multi-launch agreement with Blue Origin for LEO missions". SpaceNews. Archived from the original on April 16, 2024. Retrieved February 2, 2019.
- ↑ Foust, Jeff (April 5, 2022). "Amazon signs multibillion-dollar Project Kuiper launch contracts". SpaceNews. Archived from the original on April 16, 2024. Retrieved April 12, 2022.
- ↑ Foust, Jeff (April 25, 2024). "NASA planning September launch of Mars smallsat mission on first New Glenn". SpaceNews. Archived from the original on June 14, 2024. Retrieved April 26, 2024.
- ↑ "Rocket Lab (@RocketLab) on X". Archived from the original on May 2, 2024. Retrieved May 2, 2024.
- ↑ "NASA blog article". September 6, 2024. Archived from the original on January 22, 2025. Retrieved January 24, 2025.
- ↑ Rainbow, Jason (November 15, 2024). "AST SpaceMobile leans on Blue Origin to ramp up satellite launches". SpaceNews. Retrieved January 10, 2025.
- ↑ Foust, Jeff (April 19, 2026). "Third New Glenn launch suffers upper stage malfunction". SpaceNews. Retrieved April 19, 2026.
- ↑ "Space Systems Command awards National Security Space Launch Phase 3 Lane 2 contracts" (Press release). United States Space Force. April 4, 2025. Retrieved October 26, 2026.
- ↑ Berger, Eric (September 12, 2016). "Why Bezos' rocket is unprecedented — and worth taking seriously". Ars Technica. Archived from the original on March 7, 2017. Retrieved September 20, 2016.
- ↑
This article incorporates text from this source, which is in the public domain: "Air Force awards three Launch Service Agreements". Air Force. U.S. Air Force. October 10, 2018. Archived from the original on October 11, 2018. Retrieved January 28, 2019. - ↑ Blue Origin [@blueorigin] (January 14, 2025). "We're moving our NG-1 launch to no earlier than Thursday, January 16. The three-hour launch window opens at 1 a.m. EST (0600 UTC)" (Tweet). Retrieved January 13, 2025 – via X (formerly Twitter).
- ↑ "GS1-SN001 Manifest". Next Spaceflight. Retrieved September 20, 2024.
- 1 2 "Blue Ring Pathfinder Payload Ready for Launch; Blue Origin's New Glenn on Track for This Year". Blue Origin. December 19, 2024. Retrieved April 10, 2025.
- 1 2 Foust, Jeff (September 6, 2024). "NASA removes ESCAPADE from inaugural New Glenn launch". SpaceNews. Retrieved September 7, 2024.
- ↑ Robinson-Smith, Will (January 13, 2025). "Blue Origin scrubs first New Glenn launch attempt due to "vehicle subsystem issue"". Spaceflight Now. Retrieved March 4, 2026.
- ↑ Limp, Dave [@davill] (January 17, 2025). "Our Blue Ring Pathfinder hit all our mission objectives within the planned six-hour journey after being inserted into the desired orbit by New Glenn with an apogee of 19,300 km and a perigee of 2,400 km at a 30-degree inclination. GS2 and the BE-3U engines nailed insertion with a less than 1% deviation from our exact orbital injection target" (Tweet) – via X (formerly Twitter).
- ↑ Stranger, Harry (January 15, 2025). "Blue Origin launches New Glenn on flight NG-1 and makes orbit". NASASpaceFlight. Retrieved January 13, 2025.
- ↑ Warren, Haygen (November 14, 2025). "Blue Origin launches ESCAPADE on New Glenn, successfully lands first stage booster". NASASpaceFlight.com. Retrieved March 5, 2026.
- 1 2 Wall, Mike (June 10, 2025). "2nd launch of Blue Origin's powerful New Glenn rocket delayed to Aug. 15 at the earliest". SPACE.com.
- ↑ Foust, Jeff (July 18, 2025). "ESCAPADE to launch on second New Glenn". SpaceNews. Retrieved March 5, 2026.
- ↑ "ESCAPADE". NASA Science. June 15, 2023. Retrieved January 1, 2026.
- ↑ "Viasat Successfully Tests HaloNet Launch Telemetry Solution for NASA Onboard Blue Origin's New Glenn". Viasat.com. Retrieved March 5, 2026.
- ↑ Foust, Jeff (November 13, 2025). "New Glenn launches NASA's ESCAPADE Mars mission, lands booster". SpaceNews. Retrieved March 5, 2026.
- ↑ Erwin, Sandra (April 25, 2026). "Space Force faces surge in demand for heavy-lift launches". SpaceNews. Retrieved April 25, 2026.
- ↑ Foust, Jeff (April 25, 2024). "NASA planning September launch of Mars smallsat mission on first New Glenn". SpaceNews. Retrieved April 26, 2024.
- ↑ Warren, Haygen (November 9, 2025). "Blue Origin scrubs launch of ESCAPADE on second New Glenn mission". NASASpaceflight.com. Retrieved November 9, 2025.
- ↑ "NASA scrubs ESCAPADE launch due to 'highly elevated solar activity'". Spaceflight Now. November 12, 2025. Retrieved November 12, 2025.
- ↑ Malik, Tariq; Dinner, Josh (November 13, 2025). "Blue Origin lands huge New Glenn rocket booster for 1st time after acing Mars ESCAPADE launch for NASA". Space. Retrieved November 13, 2025.
- ↑ "AST SpaceMobile Announces BlueBird 7 Launch Date of Sunday, April 19, Invites Retail Investors to Attend Live Launch Event at Cape Canaveral". Business Wire. April 16, 2026. Retrieved April 16, 2026.
- ↑ AST SpaceMobile (January 22, 2026). "AST SpaceMobile Announces Timing of BlueBird 7 Orbital Launch, Advancing Direct-to-Device Cellular Broadband Connectivity". Business Wire. Retrieved January 22, 2026.
- ↑ Warren, Haygen (April 18, 2026). "New Glenn set to launch on third mission, reuse booster for the first time". NASASpaceFlight.com. Retrieved April 19, 2026.
- ↑ "New Glenn-3 to Launch AST SpaceMobile's BlueBird Satellite". January 22, 2026. Archived from the original on February 15, 2026. Retrieved January 22, 2026.
- 1 2 "AST SpaceMobile Announces Launch Services Agreements to Enable Continuous Space-Based Cellular Broadband Service Coverage for the United States, Europe, Japan, the U.S. Government, and Other Strategic Markets Globally". Business Wire. Retrieved November 14, 2024.
- 1 2 "AST SpaceMobile Selects Blue Origin's New Glenn Rocket to Deliver Next-Generation BlueBird Satellites to Space". Blue Origin. November 14, 2024. Retrieved November 14, 2024.
- ↑ Berger, Eric (January 22, 2026). "Blue Origin makes impressive strides with reuse—next launch will refly booster". Ars Technica. Retrieved January 22, 2026.
- ↑ "ICFS Application Summary - ICFS Portal". fccprod.servicenowservices.com. Retrieved March 5, 2026.
- ↑ Blue Origin [@blueorigin] (April 17, 2026). "Here's a glimpse of the New Glenn-3 flight profile" (Tweet). Retrieved April 17, 2026 – via X (formerly Twitter).
- ↑ Limp, Dave [@davill] (April 20, 2026). "Now that we have a more complete view, we wanted to provide an update on our NG-3 mission. While we are pleased with the nominal booster recovery, we clearly didn't deliver the mission our customer wanted, and our team expects. Early data suggest that on our second GS2 burn, one of the BE-3U engines didn't produce sufficient thrust to reach our target orbit. Blue Origin is leading the anomaly investigation with FAA oversight to learn from the data and implement the improvements needed to quickly return to flight operations. We have been in steady communication with the team at AST SpaceMobile, we appreciate their partnership, and we're looking forward to many flights together" (Tweet) – via X (formerly Twitter).
- ↑ McDowell, Jonathan (April 20, 2026). "Post by @planet4589.bsky.social — Bluesky". Bluesky.
- ↑ "AST SpaceMobile Addresses Today's Orbital Launch of BlueBird 7 on the New Glenn Launch Vehicle". Business Wire. April 19, 2026. Retrieved April 19, 2026.
- ↑ Tribou, Richard (April 20, 2026). "FAA grounds Blue Origin New Glenn after labeling mission a 'mishap'". Orlando Sentinel. Retrieved April 20, 2026.
- ↑ Blue Origin [@blueorigin] (May 22, 2026). "The FAA has approved our NG-3 report, and corrective measures have been implemented. Prior to our second GS2 burn, we experienced an off-nominal thermal condition, and, as a result, one of the BE-3U engines didn't achieve full thrust to reach our target orbit. NG-4 preparations continue—updates coming soon" (Tweet). Retrieved May 28, 2026 – via X (formerly Twitter).
- ↑ "Blue Origin delays launches until 2027". www.ft.com. Retrieved November 5, 2026.
- 1 2 "OET List Exhibits Report". apps.fcc.gov. Retrieved October 16, 2026.
- ↑ Price, Stepheny (October 7, 2026). "Jeff Bezos reveals his vision for America's next frontier — from AI to the moon". Fox News. Fox News. Retrieved October 16, 2026.
- 1 2 "News Release". feeds.issuerdirect.com. Retrieved November 9, 2026.
- ↑ "Comparing AST SpaceMobile and Starlink - Two Satellite Companies that Couldn't Be More Different". www.crossroadscap.io. Retrieved May 12, 2026.
- ↑ Pegoraro, Rob (March 4, 2026). "AST SpaceMobile Has Big Cellular Satellite Plans for 2026. Can It Deliver?". PCMAG. Retrieved March 26, 2026.
- ↑ Staff, Amazon (March 23, 2026). "Amazon Leo set to accelerate satellite production and launch cadence". Amazon News. Retrieved October 18, 2026.
- 1 2 3 4 Staff, Amazon (March 23, 2026). "Amazon Leo set to accelerate satellite production and launch cadence". Amazon News. Retrieved March 26, 2026.
- ↑ "Kuiper / Amazon LEO". Gunter's Space Page. Retrieved May 27, 2026.
- ↑ Amazon Leo [@Amazonleo] (May 27, 2026). "Up next for @BlueOrigin: Leo New Glenn 1 (LN-01). LN-01 is the first of 24 Leo launches on Blue Origin's new reusable, heavy-lift rocket, and will be our largest payload yet with 48 Leo satellites on board. Our four-tier stack is fully encapsulated in New Glenn's 7-meter fairing and ready for transport to Blue Origin integration facilities at LC-36. More soon" (Tweet). Retrieved May 27, 2026 – via X (formerly Twitter).
- ↑ Neale, Rick (May 28, 2026). "Blue Origin New Glenn rocket explodes on pad at Cape Canaveral, Florida". Florida Today. Retrieved May 28, 2026.
- ↑ Berger, Eric (May 28, 2026). "The most spectacular rocket explosion since N1 just happened in Florida". Ars Technica. Retrieved May 28, 2026.
- 1 2 3 4 Creech, Steve (October 5, 2026). "NASA's Human Landing System: Demonstrating the Capability to Land Artemis Astronauts on the Moon by 2028". NASA Technical Reports.
- ↑ Couluris, John. "First payload for MK1-101!". www.linkedin.com. Retrieved January 11, 2026.
- 1 2 3 4 "Blue Moon Mark 1 Lunar Lander | Blue Origin". Blue Origin. Archived from the original on May 17, 2026. Retrieved September 21, 2026.
- ↑ "Blue Moon Pathfinder Mission 1". nextspaceflight.com. Retrieved December 19, 2025.
- ↑ "ICFS Application Summary - ICFS Portal". fccprod.servicenowservices.com. Retrieved March 12, 2026.
- ↑ "ICFS Application Summary - ICFS Portal". fccprod.servicenowservices.com. Retrieved June 27, 2026.
- ↑ "Commercial Lunar Payload Services (CLPS) JEFO for Task Order CT-3". sam.gov. Retrieved March 12, 2025.
- ↑ Luinstra, Martijn (January 26, 2025). "NASA's CLPS program accelerates as two landers head for the Moon". NASASpaceflight. Retrieved March 12, 2025.
- ↑ "Pathfinder Mission 1". Next Spaceflight. September 6, 2024. Retrieved September 7, 2024.
- ↑ "Moon Base Phases". NASA. Retrieved May 28, 2026.
- 1 2 "Artemis III: Paving the Way to Lunar Landings - NASA". Retrieved November 8, 2026.
- ↑ "Blue Origin (@blueorigin) on X". X (formerly Twitter). August 7, 2026. Retrieved October 18, 2026.
- ↑ "NASA Adds Mission to Artemis Lunar Program, Updates Architecture". NASA. Retrieved October 18, 2026.
- ↑ Staff, Amazon (March 23, 2026). "Amazon Leo set to accelerate satellite production and launch cadence". Amazon News. Retrieved October 18, 2026.
- ↑ Erwin, Sandra (May 30, 2026). "Blue Origin gets national security launch task order hours before New Glenn explosion". SpaceNews. Retrieved October 18, 2026.
- ↑ "Space Force Awards Blue Origin Task Order to Launch National Reconnaissance Mission". Space Systems Command. Archived from the original on June 14, 2026. Retrieved October 18, 2026.
- ↑ "Space Force Awards Blue Origin Task Order to Launch National Reconnaissance Mission". Space Systems Command. May 29, 2026.
- ↑ Sheetz, Michael (June 13, 2024). "Bezos' Blue Origin joins SpaceX, ULA in winning bids for $5.6 billion Pentagon rocket program". CNBC. Retrieved May 30, 2026.
- ↑ "NASA Selects Blue Origin to Deliver VIPER Rover to Moon's South Pole". NASA. September 19, 2025. Retrieved September 22, 2025.
- ↑ "#nasa #blueorigin #viper #moon #mk1 #jsc | Isha Suri". www.linkedin.com. Retrieved February 17, 2026.
- ↑ "To the Moon with @NASA! Our second Blue Moon MK1 lander is already in production and well-suited to support the VIPER rover. Building on the learnings from our first MK1 lander, this mission is important for future lunar permanence and will teach us about the origin and distribution of water on the Moon". Twitter. September 19, 2025. Retrieved September 22, 2025.
- ↑ Greshko, Michael. "NASA May Spend $800 Million to Not Send This Revolutionary Rover to the Moon". Scientific American. Retrieved September 7, 2024.
- 1 2 "NASA Provides Update on Moon Base Rovers, Landers, Missions". NASA. Retrieved September 21, 2026.
- 1 2 "Update on NASA's Human Landing System (HLS) Program" (PDF). August 26, 2025. Retrieved August 26, 2025.
- 1 2 "NASA Selects Blue Origin as Second Artemis Lunar Lander Provider". NASA. Retrieved December 20, 2025.
- ↑ "NASA Provides Progress Update on Moon Base Rovers - NASA". October 20, 2026. Retrieved November 8, 2026.
- 1 2 3 4 "NASA Awards Moon Base Transportation, Technology, Science Projects - NASA". Retrieved November 8, 2026.
- 1 2 3 4 5 Foust, Jeff (November 8, 2026). "NASA awards lunar transportation and lander contracts". SpaceNews. Retrieved November 8, 2026.
- ↑ "MoonFall: NASA's Lunar Drone Mission". NASA Jet Propulsion Laboratory (JPL). Archived from the original on June 18, 2026. Retrieved November 8, 2026.
- 1 2 Foust, Jeff (November 8, 2026). "NASA proceeds with plans to convert Mars rover engineering model into a lunar rover". SpaceNews. Retrieved November 8, 2026.
- 1 2 "Space Systems Command Releases National Security Space Launch Phase 3 Lane 2 FY26 Mission". Space Systems Command. Archived from the original on April 3, 2026. Retrieved October 18, 2026.
- ↑ "Space Systems Command awards National Security Space Launch Phase 3 Lane 2 contracts". United States Space Force. Archived from the original on October 10, 2025. Retrieved December 20, 2025.
- ↑ "U.S. Space Force awards $13.7 billion in new national security launch contracts to Blue Origin, SpaceX and ULA". Spaceflight Now. Retrieved October 18, 2026.
- 1 2 "We're partnering with Blue Origin on our first heavy-lift Project Suncatcher launch". Google. November 19, 2026. Retrieved November 19, 2026.
- ↑ "Google Selects Blue Origin's New Glenn for Project Suncatcher". November 19, 2026.
- 1 2 "NASA Plans to Assign Missions for Two Future Artemis Cargo Landers". NASA. Retrieved December 20, 2025.
- ↑ "NASA Selects Blue Origin as Second Artemis Lunar Lander Provider - NASA". Retrieved October 19, 2026.
- ↑ "Duffy to Open Up Artemis HLS Contract to Ensure U.S. Beats China Back to the Moon". Retrieved October 19, 2026.
- ↑ Foust, Jeff (March 7, 2017). "Eutelsat first customer for Blue Origin's New Glenn". SpaceNews. Retrieved December 20, 2025.
- ↑ Forrester, Chris (April 13, 2022). "Eutelsat keeps Bezos Blue Origin launch order". Retrieved December 20, 2025.
- 1 2 "Blue Origin to Launch Telesat's Advanced Global LEO Satellite Constellation". Blue Origin. Archived from the original on November 16, 2025. Retrieved January 5, 2026.
- ↑ Sheetz, Michael (September 11, 2023). "Telesat buys SpaceX launches for Lightspeed internet satellites". CNBC. Retrieved January 5, 2026.
- Berger, Eric (March 9, 2016). "Behind the curtain: Ars goes inside Blue Origin's secretive rocket factory". Ars Technica. Archived from the original on July 30, 2017. Retrieved March 9, 2016.
- "Blue Origin tests 100k lb LOX/LH2 engine in commercial crew program". NewSpace Watch. October 16, 2012. Archived from the original on August 4, 2020. Retrieved October 17, 2012.
- Howell, Elizabeth (February 29, 2016). "Blue Origin: Quiet Plans for Spaceships". SPACE.com. Archived from the original on March 4, 2016. Retrieved March 5, 2016.
[Blue Origin is] already more than three years into development of our first orbital vehicle ... Though it will be the small vehicle in our orbital family, it's still many times larger than New Shepard. [We] hope to share details about this first orbital vehicle this year
- Clark, Stephen (September 17, 2014). "ULA taps Blue Origin for powerful new rocket engine". Spaceflight Now. Archived from the original on August 30, 2016. Retrieved April 8, 2015.
- Foust, Jeff (September 15, 2015). "Bezos Not Concerned About Competition, Possible ULA Sale". SpaceNews. Retrieved September 16, 2015.
{{cite news}}: CS1 maint: deprecated archival service (link)
Cite error: A list-defined reference named "nsw20121016" is not used in the content (see the help page).
Cite error: A list-defined reference named "Howell 2016" is not used in the content (see the help page).
Cite error: A list-defined reference named "Clark 2014" is not used in the content (see the help page).
Cite error: A list-defined reference named "Foust 2015" is not used in the content (see the help page).
External links
[edit]- Official website
- New Glenn: The Road to Space on YouTube by Blue Origin
- Tim Dodd (August 15, 2024). First Look Inside Blue Origin's New Glenn Factory w/ Jeff Bezos!. Everyday Astronaut. rsuqSn7ifpU on YouTube.
- Space Offshore – New Glenn recovery vessel updates Archived August 3, 2024, at the Wayback Machine