IM-4
IM-1 Odysseus, a Nova-C lander similar to IM-4 | |
| Names | IM-4 CP-22 CLPS CP-22 |
|---|---|
| Mission type | Lunar landing |
| Operator | Intuitive Machines |
| Spacecraft properties | |
| Spacecraft type | Nova-C |
| Manufacturer | Intuitive Machines |
| Start of mission | |
| Launch date | 2027 |
| Rocket | Falcon 9 |
| Lunar lander | |
| Landing site | Mons Mouton |
IM-4 is a robotic lunar lander and lunar satellite mission being developed by Intuitive Machines as part of NASA's Commercial Lunar Payload Services (CLPS) program. It is planned to launch in 2027.
Overview
[edit]IM-4 will launch on a Falcon 9 launch vehicle at Kennedy Space Center in 2027.[1] The mission will deploy a Nova-C class lander to the Mons Mouton plateau near the lunar south pole, and two communications satellites in lunar orbit as part of the LunaNet project, providing communication relays in the Artemis missions.[2][3][4][5] The lander will deliver eight payloads, including a drill, and will perform in-situ tests of the lunar regolith, searching for the presence of volatile compounds and water.[6][7][8][9]

Equipment and payloads
[edit]The PROSPECT drill suite, developed by ESA, is designed to collect samples up to 1 metre (3.3 ft) beneath the lunar surface with the PROseed drill, and perform testing with the ProSPA module. The suite is aimed at identifying the presence of volatile compounds and water.[10][11][12][13]
The RISE (Regolith Impact Stiffness Experiment with Orb Drops on Lunar Surface) experiment developed by the Japanese space agency JAXA consists of a ball-shaped probe carrying an accelerometer. RISE will be released from the IM-4 lander, and its motion will be monitored as it impacts the lunar surface regolith.[8][14][15]
The Australian company Advanced navigation developed the LUNA (Laser Unit for Navigation Aid) device, which will help the spacecraft's computer determine altitude and velocity during the landing. The Mons Mouton plateau has permanently shadowed dark areas which can cause standard automated landing systems to be less reliable.[9][16]
History
[edit]The IM-2 Athena mission touched down on Mons Mouton on 6 March 2025, however it flipped over after a rough landing. The sideways orientation meant its solar panels were not facing the sun, preventing the use of its drill. The mission was considered largely a failure, with few meaningful scientific experiments being performed.[16][17] As of 13 October 2026, no launch date or exact landing coordinates of IM-4 have been published.[18]
See also
[edit]- List of missions to the Moon
- Terrae Novae – European programme for human spaceflight and robotic space exploration
References
[edit]- ↑ "Intuitive Machines Selects SpaceX to Launch its Fourth Lunar Lander Mission and Lunar Data Relay Satellites | Intuitive Machines". investors.intuitivemachines.com. Retrieved 7 November 2026.
- ↑ LLC, SpaceNexus (3 November 2026). "IM-4: Launch Date and Status". spacenexus.us. Retrieved 7 November 2026.
- ↑ "A 2027 lunar landing will put this navigation prototype to the test". Aerospace America. 19 May 2026. Retrieved 7 November 2026.
- ↑ "Intuitive Machines Selects SpaceX for 2027 Moon Mission". 14 April 2025. Retrieved 7 November 2026.
- ↑ "Moon Base: Intuitive Machines IM-4 - NASA". Retrieved 7 November 2026.
- ↑ "Intuitive Machines IM-4 Nova-C lunar mission - collectSPACE: Messages". www.collectspace.com. Retrieved 7 November 2026.
- ↑ Fernholz, Tim (30 August 2024). "Intuitive Machines Picked for Fourth Lunar Mission". Payload. Retrieved 7 November 2026.
- 1 2 "JAXA「月面でのレゴリス調査ミッション」に参画 -国土交通省・宇宙開発利用加速化戦略プログラム「宇宙無人建設革新技術開発」とも連携-". 東京大学 理学部 地球惑星物理学科・地球惑星環境学科/大学院理学系研究科 地球惑星科学専攻 (in Japanese). 12 September 2025. Retrieved 7 November 2026.
- 1 2 "A 2027 lunar landing will put this navigation prototype to the test". Aerospace America. 19 May 2026. Retrieved 7 November 2026.
- ↑ "ESA Prospect lunar drill: test image and 2027 water search". Brighton Locals Newsroom. 15 October 2026. Retrieved 7 November 2026.
- ↑ "Moon Imports · Who builds what goes to the Moon". Moon Imports. 2 November 2026. Retrieved 7 November 2026.
- ↑ "N° 46-2024: European drill and mini lab secure ride to the Moon". ESA: TBD. Retrieved 7 November 2026.
- ↑ "Prospect mission animation". ESA: TBD. Retrieved 7 November 2026.
- ↑ "Press Releases". SCHOOL OF SCIENCE THE UNIVERSITY OF TOKYO. Retrieved 12 November 2026.
- ↑ "国土交通省|報道資料|RISE(月表面の地盤調査)ミッションと連携します~月面拠点建設を目指して宇宙建設技術の研究開発を加速します~". 国土交通省 (in Japanese). Retrieved 12 November 2026.
- 1 2 "Intuitive Machines: spacecraft can't complete Moon mission". BBC News. 7 March 2025. Retrieved 7 November 2026.
- ↑ Foust, Jeff (7 March 2025). "IM-2 lunar lander mission ends". SpaceNews. Retrieved 7 November 2026.
- ↑ "IM-4 (Nova-C) · landing · MoonSnag Mission Watch". MoonSnag. Retrieved 7 November 2026.