Keep everything running.

For the people who run a factory, a warehouse or a shop floor. Run the shift on a simulation of your floor, find the bottleneck and the faults while they are still a file, then run the real floor with every action written down.

A simulated electronics and robotics factory seen from above its pack-out: people box finished robots at their benches beside the pallet racks, while the robot line and the machines work behind them.
Drawn in the workbench's 3D view: Factory C, a simulated electronics and robotics factory, from above its pack-out. A simulation, not a real plant.

Where a floor loses time.

The expensive mistakes are the ones you can only see once the floor is running.

Bottlenecks found after the build

A station too slow, an aisle too narrow, a machine bought for the wrong job. They show up once the money is spent.

Changes tried on live orders

A new layout, shift pattern or robot is tested on customers' orders, because there is nowhere else to try it.

Nobody can say what happened

When a line stops, the story is pieced together from memory and a few logs.

A factory, measured first.

188 machines, benches, racks, AMRs and people, run together in physics for half an hour.

Factory C, a simulated electronics plant of 188 units: the camera comes down over its lines, people build robots at their benches and robot cells beyond them, two packers carry boxes at the pack-out, and an AMR drives under a kit cart and lifts it.
Wanted
To know what a robot factory will make in a shift, before building it.
What we did
Placed 188 machines, benches, robots and people in one design and ran half an hour of the shift in physics, 500 steps a second.
The result
4 robots and 22 actuators an hour at OEE 0.50. Its AMRs brought all 3 kit carts to the line and took the 3 empties back, with no collision.

A simulation, not a real plant: one run of 30 simulated minutes (n = 1).

Read the whole caseOpen the workbench

The constraint, named.

Over an eight-hour shift on the plant's clock, the robots waited on their actuators. Two machining centres and five cleanroom benches set the pace, while the assembly benches stood part idle. More assembly staff would not have helped.

See the factory

Simulated

robots an hour, 24 in the shift
3.0
busy: the two machining centres
99%
busy: the five cleanroom benches
97%
busy: the robot line's benches
57 to 75%
ProvenanceFile cloud://home/user-commandagi/global/factories/electronics-assembly/When

A warehouse's half hour.

Factory D, a simulated fulfilment centre: trucks in, pallets to the racks, picking, packing, sorting and trucks out, with 240 orders an hour arriving. Here the crew moves on its travel times, not in full physics. It found the slowest link: the reach trucks.

See the machine library

Simulated

orders and 490 order lines an hour picked at four stations
260
busy: the three reach trucks, the bottleneck
98%
from a pallet's arrival to its rack, for 95% of pallets
28 min
the longest pause with orders waiting
18 s
ProvenanceFile cloud://home/user-commandagi/global/factories/fulfilment-center/When

Buying, on the record.

Opening soon: your Alibaba.com buyer account, connected. It opens once Alibaba.com approves our app. Then you buy from its suppliers without leaving the floor's files.

Find

Suppliers' products with their price breaks, minimum orders and stock, read as your account.

Quote

A price at your quantity that names the seller, the freight, the currency and when it expires.

Order

Price, minimum and stock are read again before the order goes. You pay at Alibaba.com.

Receive

Packages are followed as they move. Stock counts only once someone records what arrived.

Play back any shift.

Every command to a machine is written down before it is sent, with who sent it, and the machine's answer after. You give each agent its machines, its moves and its hours once. Stopping is always allowed.

See replay

The fab cell world while its CNC runs a program in simulation: the run is live on the time bar, dragged back to replay, then returned to live.The fab cell world while its CNC runs a program in simulation: the run is live on the time bar, dragged back to replay, then returned to live.

Recorded in the workbench: a CNC runs a program in simulation, and the run is dragged back on its time bar.

What you can keep running.

  • Factory simulationA whole factory run in simulation, its output measured before it is built
  • Machine libraryFactory machines as working 3D models, ready to place
  • Digital twinYour shop, mirrored: try the job on the twin first
  • DashboardsEvery number you care about, live on one page
  • Live videoAn agent that sees a camera or a screen as it happens
  • ReplayPlay back everything a machine did, moment by moment
  • On the recordEvery action is written down before it happens, with who did it
  • PermissionsSay once what an agent may do; it works inside those limits
  • Parts and pricesEvery part of a design, with its price and where to buy it

See every capability

Run your floor first.

Place the machines, seat the people and play the shift. Fix what it finds while it is still a file.