Federal Pacific (FPE) Stab-Lok
Breakers can fail to trip during an overload or a fault. A documented fire risk.
Electrical
More capacity, up to current code, and often the first step before solar, a battery or an EV charger.
At a glance
Usually because the old one is outdated, undersized or a known safety risk, or because you are adding solar, a battery or an EV charger and don’t have the capacity for it.
Sound familiar?
What we replace
Breakers can fail to trip during an overload or a fault. A documented fire risk.
Breakers can fuse to the bus bar and fail to trip.
Outdated, limited in capacity, and without the protection of modern breakers.
How the job runs
Six steps. We confirm real timings at the site visit, because they depend on the house and the utility.
We look at the panel, the service and what you plan to add.
A fixed price once we have seen the job, and the permit filed.
When the service itself is being upgraded, the utility is part of the job.
The new panel goes in, with whatever the service needs alongside it.
The work is inspected before it goes live.
Your house is back on, with room to grow.
About $5,000
for a typical 200A service upgrade
Your fixed price comes after a site visit. Adding solar too? Save $1,000 on the upgrade.
Ready for what’s next
A 200A service is frequently what solar, a battery or an EV charger needs first. Panel capacity and breaker space are the first things we check before a battery or a charger goes in, and solar itself doesn’t need a second service panel.
No fixed price until we’ve seen it, and no upgrade you don’t need.