Solar-ready panel space
Conduit and room for a future solar-ready main panel or subpanel.
Electrical
New builds, additions and renovations, wired from rough-in through final inspection, and solar, EV and battery ready from day one.
At a glance
For general contractors and builders first, and for homeowners on their own builds.
While the walls are open
Conduit and room for a future solar-ready main panel or subpanel.
A dedicated circuit and a conduit run, in place before anyone needs them.
Panel capacity and space reserved, and a decision on where the battery would live.
A generator interlock or a transfer switch provision.
Size it for what the house will need, not just today. A 200A service now saves an upgrade of about $5,000 later.
Ready for what’s next
It is far cheaper to size the service right during the build than to upgrade it afterwards. If a battery is even a possibility, confirm the local inspector’s siting rules before framing closes: they vary by town, and getting it wrong later is expensive.
We’ll confirm our current schedule before we commit to your dates.