{"@attributes":{"version":"2.0"},"channel":{"title":"Deiser Blog English","link":"https:\/\/blog.deiser.com\/en","description":"Explore Deiser\u2019s blog for the latest content on Atlassian, ITSM, DevOps, AI, Rovo, and Jira. Learn how to optimize project management with Jira Cloud, artificial intelligence, and Rovo.","language":"en","pubDate":"Thu, 16 Apr 2026 14:53:00 GMT","item":[{"title":"How to build a PMO reporting process based on data exports from Jira","link":"https:\/\/blog.deiser.com\/en\/pmo-reporting-process-data-exports-from-jira","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/pmo-reporting-process-data-exports-from-jira\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/How%20to%20build%20a%20PMO%20reporting%20process%20based%20on%20data%20exports%20from%20Jira\/build-PMO-reporting-process-based-data-exports-from-Jira-Exporter-for-jira_Atlassian-Marketplace-Deiser_Devoteam.jpg\" alt=\"PMO reporting process based on data exports from Jira\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">The Project Management Office (PMO) usually runs operational tasks in Jira,&nbsp;but&nbsp;reporting rarely stays there. It also happens that stakeholders ask for spreadsheets with stats, and leadership needs quick and regular updates. And if you add BI platforms, it entangles&nbsp;the whole tooling. Making it confusing for most. The challenge here is to <span style=\"font-weight: bold;\">make this PMO reporting process simple, consistent, automated, and traceable every time<\/span>. If you keep reading, we will show you how to structure this process and start making the machine go from scratch to a fully PMO-governed reporting system.<\/p>","category":["Project Management","Project Reporting","PMO Collection for Jira"],"pubDate":"Thu, 16 Apr 2026 14:53:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/pmo-reporting-process-data-exports-from-jira"},{"title":"What are Atlassian Marketplace Advanced App Editions?","link":"https:\/\/blog.deiser.com\/en\/atlassian-marketplace-advanced-app-editions","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/atlassian-marketplace-advanced-app-editions\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/What%20are%20Atlassian%20Marketplace%20Advanced%20App%20Editions\/What-are-Atlassian-Marketplace-App-Editions-blogpost-cover-Deiser.jpg\" alt=\"Atlassian Marketplace Advanced App Editions\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">What starts with the need for extra functionality in Jira becomes more and more specific over time. E.g.: <em>A team might need a basic project visibility tool, but later on, they need strong governance, budget tracking, and then automatic calculations<\/em>. This becomes a limitation when the same solution offers the same package to all companies of all sizes and maturity levels. This is precisely what <span style=\"font-weight: bold;\">Atlassian Marketplace App Edition solves: Allowing customers to choose between different versions of the same app, according to the level of depth,&nbsp;support, or control<\/span>. And that\u2019s what we\u2019ll explain further in this blog post.<br><\/p>","category":["Projectrak for Jira","Atlassian Marketplace","Budgety for Jira"],"pubDate":"Tue, 14 Apr 2026 14:47:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/atlassian-marketplace-advanced-app-editions"},{"title":"PMO Governance: Why enterprises need strong governance in Jira","link":"https:\/\/blog.deiser.com\/en\/pmo-governance-enterprises-need-strong-governance-in-jira","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/pmo-governance-enterprises-need-strong-governance-in-jira\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/PMO%20Governance%20-%20Why%20enterprises%20need%20a%20strong%20governance%20in%20Jira\/PMO-Governance-Why-enterprises-need-strong-governance-in-Jira-Atlassian-Jira_Deiser-Apps.jpg\" alt=\"project portfolio management in Jira\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">The Project Management Office (PMO) plays a relevant role when helping enterprise organizations turn strategy into execution. At scale, the action of managing projects is not enough, and that\u2019s when the project governance comes into play. This is why <span style=\"font-weight: bold;\">we will show you why having established a PMO governance for your Jira, and even comparing it with what the Atlassian platform has to offer, and interacting with it, will make all your systems go smoothly<\/span>.<\/p>","category":["Project Management","Atlassian platform (cloud)","PMO Collection for Jira"],"pubDate":"Tue, 31 Mar 2026 14:53:01 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/pmo-governance-enterprises-need-strong-governance-in-jira"},{"title":"6 Ways to delegate automatic cost calculations by role to Jira","link":"https:\/\/blog.deiser.com\/en\/ways-delegate-automatic-cost-calculations-role-jira","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/ways-delegate-automatic-cost-calculations-role-jira\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/6%20Ways%20to%20delegate%20automatic%20cost%20calculations%20by%20role%20to%20Jira\/6-Ways-delegate-automatic-cost-calculations-role-Jira_Atlassian_Budgety-for-jira_deiser-apps-devoteam.jpg\" alt=\"Delegate automatic cost calculations in Jira\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">For different teams, logged time already exists in Jira. However, turning that effort into reliable cost data is still handled manually in many organizations, and financial teams are suffering because it causes inconsistencies, delays, and extra administrative work. That\u2019s why here <span style=\"font-weight: bold;\">we explain how to avoid that by delegating cost calculations based on workforce roles into Jira. And yes, you can do that automatically...<\/span><\/p>","category":["Project Management","Atlassian platform (cloud)","Budget management"],"pubDate":"Wed, 25 Mar 2026 16:02:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/ways-delegate-automatic-cost-calculations-role-jira"},{"title":"Add a holistic project management operating layer in Jira","link":"https:\/\/blog.deiser.com\/en\/holistic-project-management-operating-layer-in-jira","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/holistic-project-management-operating-layer-in-jira\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/Add%20a%20holistic%20project%20management%20operating%20layer%20in%20Jira\/Advantages-of-using-the-PMO-Collection-for-Jira-blogpots-cover-Deiser.jpg\" alt=\"project management operating layer in Jira\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">As most Project Management Offices (PMOs) don\u2019t fail because of a lack of information but a lack of connected information, the solution is obvious: to <span style=\"font-weight: bold;\">integrate all those disconnected project management layers into the single tool that takes most&nbsp; of the operational work<\/span>. Solving specific PMO pains which, in this blog case you'll learn, applied to Jira how to add project portfolio, finances, team capacity, and reporting and BI layers. &nbsp;&nbsp;&nbsp;&nbsp; &nbsp;<br><\/p>","category":["Jira Software","Project Management","PMO Collection for Jira"],"pubDate":"Thu, 12 Feb 2026 15:37:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/holistic-project-management-operating-layer-in-jira"},{"title":"Add project structure to Jira, monitor progress & avoid micromanagement","link":"https:\/\/blog.deiser.com\/en\/project-structure-to-jira-monitor-progress-avoid-micromanagement","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/project-structure-to-jira-monitor-progress-avoid-micromanagement\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/Add%20project%20structure%20to%20Jira,%20monitor%20progress%20and%20avoid%20micromanagement\/How-to-bring-more-structure-to-projects-in-Jira-blogpost-cover-Deiser.jpg\" alt=\"Add project structure to Jira, monitor progress &amp; avoid micromanagement\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">Jira is the go-to when tracking work items and spaces. When managing projects in Jira (stakeholders, metadata, health, etc.), most teams end up building fragile workarounds, moving away from Jira to monitor project progress in spreadsheets, micromanage, or buy enterprise-heavy portfolio tools when <span style=\"text-decoration: underline;\">they only needed a project structure in Jira<\/span>. In this blog, <span style=\"font-weight: bold;\">we\u2019ll show you how to bring project-level structure into Jira to monitor progress clearly and reduce micromanaging.<\/span><\/p>","category":["Project Management","Projectrak for Jira","Project Tracking"],"pubDate":"Thu, 18 Dec 2025 15:56:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/project-structure-to-jira-monitor-progress-avoid-micromanagement"},{"title":"Calculate budget variance in Jira: From planned budget vs actual spent","link":"https:\/\/blog.deiser.com\/en\/calculate-budget-variance-jira-planned-budget-actual-spent","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/calculate-budget-variance-jira-planned-budget-actual-spent\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/Calculate%20budget%20variance%20in%20Jira%20-%20From%20planned%20budget%20vs%20actual%20spent\/How-to-calculate-budget-variance-in-Jira-blogpost-cover-Deiser.jpg\" alt=\"Calculate budget variance in Jira: From planned budget vs actual spent\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">As most enterprise teams already run their projects in Jira, it makes sense to bring project financial data right by them, rather than have them living in third-party tools, disconnected, creating project workflow silos, uncertainty, and slowing decision-making. By reading this blog post, you\u2019ll <span style=\"font-weight: bold;\">have a closer look at calculating budget variance in Jira by comparing the project\u2019s planned budget (budget forecasting) with your actual spending<\/span>.<\/p>","category":["Project Management","Budgety for Jira","Budget management"],"pubDate":"Thu, 11 Dec 2025 15:48:01 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/calculate-budget-variance-jira-planned-budget-actual-spent"},{"title":"The importance of project reporting in enterprise transformation","link":"https:\/\/blog.deiser.com\/en\/project-reporting-enterprise-transformation-jira-migration","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/project-reporting-enterprise-transformation-jira-migration\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/The%20importance%20of%20project%20reporting%20on%20enterprise%20transformation\/Why-monthly-reports-matter-during-Jira-Migrations-and-Enterprise-transformations-blogpost-cover-Deiser.jpg\" alt=\"The importance of project reporting on enterprise transformation\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">When you are in the middle of any enterprise transformation, such as a Jira migration, <span style=\"font-weight: bold;\">project reporting often gets pushed to the bottom<\/span> of the to-do list, and ironically, this is when you need reporting the most. That\u2019s why, <span style=\"font-weight: bold;\">in this blog post, we'll go through why those reports matter, how to make this process almost automatic, and how to communicate with the right people, on time<\/span>.<\/p>","category":["Project Management","Exporter for Jira","Project Reporting"],"pubDate":"Thu, 04 Dec 2025 16:01:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/project-reporting-enterprise-transformation-jira-migration"},{"title":"Building a single source of truth for project budgets in Monday.com","link":"https:\/\/blog.deiser.com\/en\/building-single-source-of-truth-for-project-budgets-monday-com","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/building-single-source-of-truth-for-project-budgets-monday-com\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/Building%20a%20single%20source%20of%20truth%20for%20projects%20budgets%20in%20Monday.com\/Building-a-single-source-of-truth-for-projects-and-budgets-in-Monday-blogpost-cover-Deiser.jpg\" alt=\"Building a single source of truth for project budgets in Monday.com\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">Providing more visibility to your company\u2019s project budget data is typically the first step toward making better decisions. However, visibility alone isn\u2019t enough, and here\u2019s where the concept of a Single Source of Truth (SSOT) comes into play. In this blog post, you\u2019ll learn what financial control in Monday.com means, <span style=\"font-weight: bold;\">how to build a single source of truth for projects and budgets in Monday.com, and how it fits within&nbsp;the context of project delivery, to make faster decisions, clearer accountability, and better planning<\/span>.<\/p>","category":["Project Management","Budgety for Monday.com","Budget management"],"pubDate":"Thu, 27 Nov 2025 15:38:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/building-single-source-of-truth-for-project-budgets-monday-com"},{"title":"Introducing the PMO Collection for Jira: Centralizing project data","link":"https:\/\/blog.deiser.com\/en\/introducing-the-pmo-collection-for-jira-centralizing-project-data","description":"<div class=\"hs-featured-image-wrapper\"> \n <a href=\"https:\/\/blog.deiser.com\/en\/introducing-the-pmo-collection-for-jira-centralizing-project-data\" title=\"\" class=\"hs-featured-image-link\"> <img src=\"https:\/\/blog.deiser.com\/hubfs\/EN\/Blog\/Post\/Introducing%20the%20PMO%20Collection%20for%20Jira-%20Centralizing%20project%20data\/introducing-the-pmo-collection-for-jira-sentralizing-project-data.jpg\" alt=\"Introducing the PMO Collection for Jira: Centralizing project data\" class=\"hs-featured-image\" style=\"width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;\"> <\/a> \n<\/div> \n<p style=\"font-size: 18px; line-height: 1.5;\">As leaders increasingly need a clearer picture of business initiatives, given the speed at which everything is moving, <span style=\"font-weight: bold;\">project visibility isn\u2019t about continually adding reports; it\u2019s about matching the right project data with the right&nbsp;stakeholders at the most convenient times<\/span>. As Jira is an enterprise&nbsp;software standard for running projects, the right answer should be to centralize everything in there. Isn\u2019t it? If that\u2019s your case, in this post, <span style=\"font-weight: bold;\">we'll introduce you to the PMO Collection for Jira and how it centralizes governance, budgets, capacity, and reporting in a single platform<\/span>.<br><\/p>","category":["Jira Software","Project Management"],"pubDate":"Thu, 20 Nov 2025 15:37:00 GMT","author":"huwen.arnone@deiser.com (Huwen Arnone)","guid":"https:\/\/blog.deiser.com\/en\/introducing-the-pmo-collection-for-jira-centralizing-project-data"}]}}