Menu
  • Home
  • Our Services
    • Water Resources and Systems
    • Traffic and Transportation
    • Community Development and Planning
    • Structures
    • Surveying
    • Spatial Data
    • Planning
    • Field and Materials Testing Laboratory
    • Aviation
    • Construction Engineering Services
    • EnvsionIT Solutions
    • Close
  • Who We Are
    • Leadership
    • History
    • Mission, Vision and Values
    • Quality Focus
    • Sustainability
    • Giving Back
    • Close
  • Markets We Serve
    • Traffic and Transportation
    • Energy and Power
    • Planning
    • Education
    • Public Infrastructure
    • Design-Build
    • Native Nations
    • Private Development
    • Healthcare
    • Water
    • Aviation
    • Close
  • Project Gallery
  • Media
    • Contacts
    • News Room
    • Marketing Materials
    • Close
  • Careers
    • Employment Listings
    • BHI Benefits
    • For College Students
    • Why Choose BHI
    • Ethical Practices at BHI
    • Commitment to Diversity
    • Commitment to the Environment
    • Close
  • BHITracker
    • Bids
    • Projects
    • Close

Bohannan Huston, Inc.

    • Close
  • Contact Us

Clovis Effluent Reuse Project

Location: Clovis, New Mexico

This award-winning project involved developing an urban non-potable reuse system to supply and distribute reuse water from the Clovis Wastewater Treatment Plant (WWTP) to users within the City of Clovis. The Clovis Effluent Reuse Project is a critical project to help the City of Clovis reduce withdrawals from the Ogalalla aquifer, which has historically been the sole source of potable water in the city. By capitalizing upon the effluent created from the Clovis WWTP, the City has provided an additional water  supply (4.08 million gallons a day!) for local non-potable water needs. The Bohannan Huston, Inc., team worked closely with the City to develop a complete effluent water system design that could be built in distinct phases.

Each phase becomes operational upon construction completion and several end-users already have access to non-potable water to begin preserving the Ogalalla aquifer. The project kicked off in 2010 with the PER and was divided into five construction packages: Phases 1A & 1B (completed in 2017), 1C (completed in 2018), 1D (anticipated completion 2021), and Phase 2 (construction starts 2021). From funding documentation, to phasing, to filtering system selection, to pumping plans and distribution line design, the BHI team provided complete consultant services to bring the project to fruition in a timely and cost-effective manner. The Clovis project was a 2017 ACEC Engineering Excellence Award winner and the 2017 NMSPE Project of the Year.

Clovis Tank 1
Clovis Tank 2

< Back to project list

Filed Under: Construction, Water/Wastewater Systems

  • Welcome/Overview
  • Resources
  • Get Involved
  • Contact Us

Get In Touch

Albuquerque Headquarters


Address: 7500 Jefferson St. NE
Albuquerque, NM 87109

Phone:505.823.1000

Email: Email us here

 

Las Cruces


Address: 425 S. Telshor Blvd.
Suite C-103
Las Cruces, NM 88011

Phone:575.532.8670

Email: Email us here

 

Colorado


Denver

Address: 10303 E. Dry Creek Rd., Suite 250
Englewood, CO 80112

Phone:303.799.5103

Email: Email us here

Grand Junction

Address: 619 Main Street
Grand Junction, CO 81502

Phone:970.788.1140

Email: Email us here

Logins

  • RFQ/DBE
  • BHITracker


© Bohannan Huston, Inc. All rights reserved.

  • Home
  • Our Services
  • Who We Are
  • Markets We Serve
  • Project Gallery
  • Media
  • Careers
  • Contact Us
  • BHITracker Portal