Wednesday, noon, January 8
Just a quick note for those of you who have followed the BLAST campaign. Unfortunately, the flight was terminated yesterday while I was on a plane from McMurdo to Christchurch. I don’t have a lot of details but for at least the first 8-9 hours at float, the telescope was working nominally and we were very busy doing tests and starting to observe sources.
I left the high bay for Willy Field airport with James feeling really excited and tired after the marathon of launch and then the first 8 hours of line of sight data, a total of over 40 hours with very little or no sleep for most of the team.
Apparently, just after we left, there was a sudden anomaly in the gondola that caused us to lose the ability to point the telescope. We don’t know what happened but after several hours trying to recover the decision was made to terminate the flight. I found out when I checked email after landing in Christchurch. I am devastated as are the rest of the team still back in Antarctica. We are speculating and investigating what happened using the flight data and models and there will soon be at least an overflight of the gondola’s landing position to take some pictures.
Before this happened, the receiver was working well and all of the other subsystems also were working nominally. I’ll put some more details here later maybe with some of the launch pictures I took but right now I am still in a bit of shock. It has been a real privilege to work with this amazing team – will wait to see what happens now. First priorities are to recover as much as possible of the payload and see what shape it is in.
Gabriele took this picture of the ice breaker now almost at McMurdo from hut point.

Monday, 10.33 pm, January 6
For those of you who did not watch the live stream – BLAST HAS LAUNCHED!!!
At 6.10 pm today, the balloon was released and we started to ascend. As of about 30 minutes ago, BLAST is at float altitude of 120,000 ft. and we are doing initial system tests of cryogenics, pointing and detectors. Then we will hopefully start to observe sources and calibrate the instrument.
This has been a very long day – starting at just before 2 am leaving McMurdo. I didn’t think that we would launch but the day turned out to be beautiful. Of course, because it is ballooning there was no lack of drama. I will give more information and upload pictures and movies when over the next few days.
Pictures from launch:
Monday, 6.45 am, January 6
We are rolling out. Low level winds seemed ok but surface winds are 5-10 knots, a bit too high. Hopefully they will calm down.
Sunday, 6.30 pm, January 5
We have had a lot of discussion here about the options going forward and consulted with NASA. We are still going to try for a launch even if the projected time at float is 7-8 days and the likelihood is for recovery (depending on where the payload lands) no earlier than next year. The austral summer antarctic vortex, which carries the balloons around the continent in a circular path and also is responsible for the collecting of aerosols above the south pole which reduced the ozone content, still is projected to dissipate in the next 7-10 days. After that, the winds at 120,000 feet tend to become more disorganized and previous balloon payloads that have had flights this late have had erratic trajectories, with tendency to go north, towards open water, off of the continent.
My only experience of this late a launch was with the B2K launch in 2003 of which I have only vague memories. Apparently from the blog here:
We launched B2K on January 6, 2003 after passing the final compatibility test around December 31-January 1. The weather at the beginning of the season was not good so everything was delayed. The other payload, ATIC, launched that year on December 29.
I remember the discussions with Eric about General Relativity, the Italians cooking, seeing the ice breaker getting closer to McMurdo from hut point and I remember looking at the altitude vs. time and noticing that it was oscillating but steadily decreasing from Christchurch, so I must have left a few days after launch. B2K went mostly South and probably had a small leak causing the loss in altitude. It was terminated on January 21 remotely about 400 miles from Pole and the data disks were recovered on January 27 the same year. This year, fixed wing operations at Pole end some time between January 16-23. Just sayin’.
Sam has seen the icebreaker near the horizon two days ago from hut point. When it arrives, there will be 3 dry weeks on station. I will try to post a picture of the icebreaker.
I was scheduled to leave tomorrow but the flight from Christchurch boomeranged (turned around before the halfway point) due to mechanical problems so we are delayed by at least one day.
Saturday, 2 pm, January 4
The attempt has been called off due to surface winds. This is really disappointing and may be the end of the second BLAST season.
Saturday, 10.30 am, January 4
We are once again out of the high bay doing comms testing. Yesterday, the weather model said that the winds at float altitude would break down in about 10 days which would mean that if we launch today, we will probably end up having to cut down on the other side of Antarctica and wait until next year to get any data and any surviving parts of the experiment.
There are some bases there that could help with recovery including Troll (Norway) and Halley (UK) but we would have to coordinate with their programs. Both have ice runways and Troll also has a commercial downlink station for polar orbiting satellites.
Here is a map of the bases and the current projected 10 day track for the balloon. It is still very circular but yesterday the forecast had the balloon going further north at 10 days so the projections are uncertain.
Friday, 4.30 am, January 3
Not much to report – was really windy yesterday. Most of the team went in for a day with normal hours and did checks of all of the systems. Everything is working really well – the cryo is good, pointing tests went really smoothly and Mark, Adrian and Sam confirmed that “microphonic” lines in the detectors are from vibrations of the shutter that is in front of the window to protect the window from the sun on ascent when we are not able to control the azimuth. The shutter is a reflective circular piece of mylar covered foam connected to a stepper motor with an arm about 2 feet long. Any vibrations of the gondola are transferred to the shutter which then modulates the light bouncing off of it into the receiver. We only see these vibrations in the sensitive detectors – i.e. not in the dark detectors or in off resonance signals (or in the dissipation quadrature readout for experts). When the shutter is open and we are scanning the telescope inside the high bay the pickup was gone.
We are going in this morning to top up the helium in preparation for another launch attempt tomorrow. They say the weather doesn’t look great but we will try.
Wednesday, 11 am, January 1
We were picked up again and pull out to wait for the winds to set up and calm down but unfortunately after a few hours they were picking up so we are scrubbed for the 5th time this year and 9th overall. I think the record is 15.
Wednesday, 3 am, January 1, 2020!
Happy new year everyone! We are one of the first places in the world to welcome the new year. Hope you have a good end of 2019 and a great 2020!
We are back at LDB and filling the receiver with helium in preparation for launch attempt number 5 (or 9 if you count last year). On the way we saw a lone emperor penguin wandering down the fuel track. We stayed in town all day today and wandered through the annual new years eve party at McMurdo called Ice Stock.

Most of the day, we slept or otherwise recovered from the cryogenic adventure.

Last night was the annual MAAG (McMurdo Alternative Art Gallery?) and we went to see the BLAST-themed artwork made by Rose from the LDB galley using sugar-based fondant and paint with help from several of the BLAST team including Laura, Gabriele and Caleb.

This is a rendition of the BLAST map of the Vela molecular cloud and the wrinkles represent the magnetic field lines while the paint color represents the dust brightness temperature (which is proportional to the integrated dust mass). The designs in green on the wall behind are made from mint chips that are left over every year in the galley.
Tuesday early afternoon, December 31
We have had a wild last 48 hours but are back to being ready for a possible launch tomorrow morning around 9 am local time.
The cryo problem turned out to be an ice plug – the most common problem whenever using liquid cryogens and required warming up the receiver to above the temperature of liquid nitrogen (77 K). We realized this after waiting for 5 hours Sunday morning for the line to pump out with no change. It also made sense because just before we saw the problem, we had another problem with one of the small pumps on the gondola stalling and leaking air back into the system. We had convinced ourselves that the tube for the pot was very difficult to plug and that there shouldn’t have been enough air leaking in to plug it but apparently there was. A general rule is that coincidences are suspicious.
Here is a spare of the pump tube that was plugged. The plug was in the bellows section.

Warming up and fixing the plug was a long process so we once again formed shifts – cryo team A, cryo team B, and Mark, who stayed for the entire 38 hours. We blew out the 200 liters of liquid helium in the receiver, warmed up to about 100 K while purging the pup tube with ultrapure helium gas and then, once everything was clear, started the cooldown again by refilling the main tank with liquid helium. We finally got it full yesterday morning at around 3 am using all but one 500 liter storage dewar of the liquid helium left at LDB.
The flight opportunity sunday morning was cancelled due to winds. However there was a flight opportunity monday morning that we missed while we were filling the receiver with helium. Instead, they were able to launch the second Barrel balloon. Barrel is a small “superpressure” balloon that was launched “by hand”, not on the launch vehicle.
Here are some pictures of the Barrel launch that we got to see while we were fixing our receiver. Those people you see on the right are holding the payload which is the size of an air conditioning unit (Arizona reference) and run towards the balloon as it rises and then let go when it is overhead.
The CSBF team told us that while they had a good launch of Barrel, because it is smaller, it was easier to launch and the winds still were probably not good enough for us. We had asked them t tell us that earlier, though. It looked pretty good.
Sunday morning, December 29 12:23 am
Winds are messy so there is no flight tonight. We are still working on the cryo problem. It is going to be a while. At least four people have to go because we have a 10 person van.
Right now the theory is that we overfilled the pot and now we have to wait for the excess helium to boil off. We are heating the helium3 pump to increase the boiloff and estimate that it should only take a couple of hours.
Update: 2.09 am: No update. Just looking at temperatures move slowly.
Saturday evening, December 28
Update: 10 pm. Cryo fill is done. We are doing pre-pickup checklist. Maybe a launch attempt around 5 am local time (1600 Zulu, 9 am Arizona)?
The CSBF folks are ready to pick us up but we are having a cryo issue. We have 30 minutes to figure it out. It looks like there is a leak in the pumped pot system.
Update: Midnight
Fortunately the winds are not settling down because we are still battling with a cryo issue. One of our small pumps on the gondola has died and was leaking for some minutes into the pump tube on the pump pot. However, it doesn’t seem that the tube is plugged because with the big floor pump we are pumping on the pump pot through the tube and get a large flow of gas. So that is good.
There is a capillary that feeds helium from the main tank into the pump pot and it also doesn’t seem to be plugged. So that is good.
However, the temperature of the pump pot is 3 K instead of 1.2 K and we don’t know why. One theory is that the pump pot is overfull and there is a large column of helium up the pump tube that is putting a high load on the pot and reducing our ability to pump it down. Another theory is that the pump pot fill valve on the capillary is not closed and we are getting a continuous flow of 4 K liquid into the pot. We tested opening and closing the capillary with higher torque and we saw when it opened that the flow of the pumped gas went up and then when it closed it went down. If the pot is overfull then we need to wait until it pumps out – it is designed to hold 5 days under normal load at 1.2 K. If it is overfull the load is higher so it should run out more quickly but it could be ~10 hours at least.
—————————————————
Saturday morning, December 28
We are back out at LDB after another day of trying to sleep off a scrubbed launch attempt. The weather today is variable again so we are having a more relaxed start up schedule than the last few days. Mark and I went up Ob Hill after getting some granola in the galley – it was pretty gusty up there, did not look great for tonight but we’ll see…

Update: 9.30 pm: We are doing a cryo fill to be ready for a launch opportunity tonight or tomorrow night. The pod bay doors are partially open to let the Helium gas out. The CSBF team is releasing Pi balls to check the low level winds and they are reading out their measurements over the radio.
Here is our power up checklist:

Saturday morning, December 28
Update: 2.30 am local time: Just scrubbed again! Not launching today. Winds changed direction suddenly. Going to have to do this whole thing again.
Saturday morning, December 28
I have lots of pictures and writing to post but I have been busy with launch attempts and recovering from them. We had another launch attempt last night which was called off due to variable low level wind direction. The balloon launch needs to be aligned with the direction of the wind so that the launch vehicle can drive to be underneath the balloon when it is fully extended and ready to release the payload. When the wind direction at 500 ft. – 1000 ft. is not stable it is not possible to set up the launch vehicle in a good position.
We called it off around 5 am yesterday morning (Friday, December 27) and slept during the day. This evening we left McMurdo again at 7 pm for a third attempt this season (7th launch opportunity overall including the four last year).
We were picked up again and by 9 pm we were out doing communications tests. We then waited for several hours while the CSBF team checked the wind directions. Chris, the team lead, kept coming over to the high bay periodically to say that it was looking promising. It was not as warm as the night before so while we waited we found some other things to do like warming up in the galley or playing poker.
After about 3 hours of waiting, we are now further than we have gotten so far this year – BLAST is on the launch pad! Fingers crossed…
We have gotten very good at doing pre-flight checks. Javier has been coordinating these and with all the practice, we are pretty fast now.
We are pausing now because the launch vehicle (and spool/helium) are lined up about 40 degrees off of the wind direction. They are deciding if they want to move directions. Adrian is very negative – he thinks that the surface winds are going to pick up and we are going to have to call it off again. We have all been experiencing the emotional roller coaster of getting up for the launch and then calling it off a couple of times now.
———————————————-
Evening Thursday, December 26 – Morning, Friday, December 27
We had another unsuccessful launch attempt tonight. The weather was beautiful and I was clinging to the hope that we would launch the balloon, get to float and everything would work great and after 12-16 glorious hours of checking the detectors and optics and pointing at clouds of galactic dust and gas I would still be able to make the flight out to Christchurch on the morning of the 28th. Mark and Federico broke out cigars while we were getting picked up by the Boss.
The sky was pretty clear and the light from the early morning sun lit up the Royal Society Mountains and Erebus with some dramatic clouds.
It was actually so warm and sunny that everyone was hanging out outside. We were all very excited and optimistic.
We took a some BLAST team pictures by the gondola after the CSBF communications tests were done. Here are Rose and Laura, two of the LDB galley staff who provide us with the best food in Antarctica.

Unfortunately, the low level winds were not cooperating. They were not blowing in a consistent direction and/or were too low to set up the launch vehicle and the balloon in a good orientation. After a while, one by one, as the experiment waited outside and the high bay warmed back up the BLAST team started to get some rest.
Wednesday, December 25
Update: 7.50 am. We are cancelled due to low level winds being too low to find a good direction to line up for the launch and concern about surface winds picking up from the south. We are rolling back in. Hopefully next opportunity will be the one!
Everyone in McMurdo is on vacation today except LDB. The local intranet is down. The population is pretty low over the holidays with 816 people on station.
We got back to town and had some sleep, went to the Christmas brunch around noon and then went for a walk. On Christmas day, most of the people in town have the day off so there are lots of events including a softball tournament. Here is a picture of the softball field from the beginning of the hike to Arrival Heights. This hike leaves from McMurdo and goes to Hut point where Scott’s hut is still there with everything very well preserved in the natural freezer including a seal carcass lying outside.
This time, the weather was very nice and not as windy as last week. We saw some skuas on the way bathing in the new melt pools all around. The temperature is just above freezing now so there are starting to be lots of little rivers all around town and the transition section of the ice between Ross Island and the Ross Ice Shelf is becoming very slushy and difficult to drive through even with the all wheel drive vans.
Because we did not have a launch attempt tonight, we all managed to catch up on sleep in the afternoon and night.
December 25, early morning
Update – we are out doing the communications tests and Mark and Caleb are balancing the outer frame. The surface winds are stronger than the last few days…What is happening now is that the NASA team are going through their pre-flight checklists and we are going through ours. We are also waiting for the wind conditions to become good enough to go out to the launch pad. The schedule we had said launch at 10 am. It is now 5 am.
I was thinking last night about how BLAST is much more complicated than the other balloon experiments I have worked on (mainly BOOMERANG). BLAST has a lot more detectors, many more control systems, more complicated cryogenics and a much more complicated flight operation. BOOMERANG had a single shot fridge – it was cycled on the ground and then not cycled again in flight and the liquid Helium was vented to the atmosphere all the time so it pumped down as the balloon ascended. BLAST has a recyclable fridge that cycles approximately every three days and it also has a controllable 1 K pumped pot. The liquid Helium main tank is maintained at approximately 1 atmosphere of pressure. All of these things require various plumbing and controllable valves. BOOMERANG in flight observed a single large sky region for the entire flight. BLAST is more like a general purpose telescope observing multiple sources and has a complicated observing sequence controlled by on-board software.
————————
Early Christmas morning:
We are back after only a few hours. We went to the christmas eve dinner last night at 7 pm and then tried to get a few hours sleep before getting picked up at 1.30 am to come back for the launch attempt. I feel asleep easily after dinner and slept deeply until I woke up feeling triumphant thinking that it was midnight or later and I had gotten a good 4-5 hours of sleep. Then I looked at the clock and it was only 10 pm. After that I pretty much tossed and turned until 1 am when it was time to get up. I couldn’t help thinking about how much work had gone into this project by a large number of people over the years and that it was all coming down to the next few days as to whether it would work or not.
I noticed that there were stars on my ceiling.
At 1.20 I left the building to go to the snoopy pole meeting point (because it has snoopy at the top of a pole) and instead of sunshine outside like the last few days, it was almost overcast with low clouds and fog all around at the base of the mountains.
Anyway, as of now, we are still on and running through our preflight checklist waiting for the payload to be picked up. Ian cycled the fridge an hour before we left McMurdo and we quickly checked the detectors. While Paul was checking the stepper motors, apparently he actuated the motor that opens a valve on the pump pot. It was open for about 10 minutes before anyone noticed. This has caused the pot to fill with helium and warm up from 1.4 K to about 2.4 K which increases the load on the fridge and causes the detectors to rise in temperature. It is not a big problem but it is taking some attention away from the regular flight checking.
—————————-
Update – it is almost 5.30 pm and we are all still in the high bay at LDB. Should be going back now, maybe get a couple of hours sleep before coming back hopefully for launch!
Tuesday, December 24
Latest news is that we are going to try for a launch tomorrow (Christmas launch) at 10 am. We are now frantically remounting plumbing for a final time and wrapping up cables and doing a last Helium transfer to be ready. Pickup is scheduled for 1.30 am Christmas morning.
After we got back from buttoning up the payload, we went to get in line for the Christmas meal. Here are some pictures of the BLAST team at Christmas.
Monday, December 23
They scrubbed the Barrel launch last night at around 1 am due to 17 knot surface winds at Scott base. They are going to try again this afternoon. It is anther warm, sunny day with pretty low winds. We have come in to do some final buttoning up and checks and for the last lunch service out at LDB for a few days until after the christmas holiday.
We got back to McMurdo last night at around 11 pm. Some people went out to hut point to look for penguins and saw two of them wandering around. They took a lot of pictures and videos.
Today, the cryo team found that one of the parts on the complicated plumbing on the cryostat was leaking (not a valve) at the threaded seal. They spent the day gluing the seal and testing it. The rest of the team worked on improving and optimizing the flight software.
In the afternoon, there was the flight readiness review. A lot of the team went and we were officially declared flight ready. There was a weather briefing afterwards and unfortunately they said that the next possible launch opportunity looked like it was not until December 27. We will have another briefing tomorrow to see if there is any change but the current plan is for several of the team to take tomorrow off to recharge for the final push.
Update, 10.30 pm Sunday:
We have passed compatibility! We are flight ready – aside from filing the paperwork and getting approvals from appropriate people back in the US of A. We have to have an FRR (flight requirements review) and get an ATP (approval to proceed) which could happen as soon as tomorrow morning.
The compatibility test started out well, we were taken out of the high bay and set down on the porch and then rolled out to be picked up by the Boss.
All of that went pretty smoothly. It initially felt really nice outside (Giles was wearing a t-shirt) since the temperature was just at zero C and it was very sunny. After the CSBF team attached the NASA control and telemetry unit and ballast underneath the payload we were taken out by the Boss to a good location to check all of the systems in flight configuration.
We have a checklist that we use for a flight day that includes checking things like stepper motors are able to move, valves open and close and that the detectors are working as expected. I was mostly looking at the detector noise which we thought looked higher than normal with some pickup lines.
After about 30 minutes out on the Boss, we heard that the CSBF team would not be able to do all of the necessary tests of communications. In particular, they did not have access to a TDRSS satellite required to test that downlink because of the two that were above the horizon, one was being used by the SuperTiger balloon to downlink data and the other one was being used by “someone else”. This was disappointing but not the end of the world, since we could just check that on the day of launch if necessary and get signed off with everything else now.
Then an hour after that, we heard that the winds at McMurdo had suddenly gone up from 3-4 knots to 17 knots which could mean that there was going to be high wind coming our way soon and we would have to come back inside. Meanwhile, we were looking continuously at the detector data coming in. There were a lot of dropouts in the data due to variable telemetry connection (did I say the internet was bad here?) but we could clearly see noise features that were either narrow lines in the spectrum around 100 Hz or sometimes strange square shaped features that moved around in frequency. Our first thought was that these features were coming from pickup from the transmitters or other electronics in the NASA box.
To test this, we checked to see if the noise was coming in through the detectors or just in the readout electronics by changing the comb of readout frequencies. We found that the signals were associated with the detectors which was a bit strange since it was unlikely that the detectors would absorb power from the transmitters since they are made of superconducting material which should be insensitive to those frequencies. Then, we tested this by turning the transmitters on and off one by one – nothing changed the signals on the detectors. We did have one theory which was that the signals were coming from some optical modulation. The noise went away when they turned off the engine of the Boss while doing the telemetry tests. How could we get optical signals modulating that fast? I suspected that it was from the reflective shutter in front of the window vibrating in the wind or driven by the vibrations of the Boss.
Before we could check this, we finished all of the comms testing except the TDRSS test and the wind in McMurdo died down so we decided to keep going outside for a bit longer. We moved the payload to a position so that the sun was shining on the solar panels and we could calibrate our sun sensors. This involved Mark and Caleb turning the gondola by hand in ten degree steps while we recorded the data from the sun sensors and calibrated it with the GPS system on board. While doing this, we opened the shutter and retuned the detectors and looked at the noise…no excess features! The shutter must have been vibrating. Hopefully we would not have the shutter in front of the mirror during in-flight observations (that would be a pretty big problem) so the detectors checked out and did not have any evidence for pickup from the transmitters.
After about 30 minutes in the new position, Chris came over and told us that we now had a possible TDRSS satellite access so we quickly finished the sun sensor calibration and moved the payload back to the TDRSS position. During this test, most of the team went to the galley and had some food (around 8 pm) and while there, we heard that we had made contact with TDRSS – we were done with all of the tests except the last one – weighing the experiment. We brought the payload back to the high bay and attached the scale – the weight was 6030 lbs. – 30 lbs. over. We would need to remove 30 or 40 pounds from the 800 pounds of ballast used to speed the balloon upwards through the troposphere. We were done – flight ready. Everything had worked and we brought the experiment back into the high bay.
Now we had to wait to find out if there was a launch opportunity in the morning. After about 1 hour, Chris came by to tell us that there was not an opportunity due to the expected low level wind speeds. They are outside trying to launch the small Barrel payload now and we are packing up to go – next opportunity looks like not until the 26th.
Sunday, December 22
It is beautiful weather outside and we had a scheduled departure time of 3 pm from McMurdo to come out to the LDB facility for our compatibility check and a possible launch attempt for the second Barrel balloon.
I drove the van back from LDB to town last night – I got my van driver certification last week with Kaija – at around 8 pm after putting everything together on the gondola to be ready for the test (and for launch). We were in time to go out to the “Southern” bar and meet up with the meteorite hunters and the mountaineers. Here is an ASU picture (missing Adrian) with me, Sam and Emilie.
Right now, we are waiting to be picked up by the launch vehicle called “the Boss”. Even though we are supposed to be done with all modifications, people are still up on the gondola taping things as I write. Also, we have noticed that the detectors have a high level of white noise plus some pickup in narrow lines ever since we put everything together yesterday. It could just be that we have been running the video and TDRSS transmitters inside the high bay while we were not doing that before. Hopefully it will go away when we are outside.
Yesterday morning I got a ride in with shuttle Jill at 11 am. There were three of us going to LDB and a couple of air force people going to Willy field. I got to sit in the passenger seat in the front and had a long philosophical conversation with Jill about science and religion and whether what we are doing out here is worth all of the money and effort. I said yes.
Saturday, December 21
Last night I stayed late again with Mark and Paul rebuilding valves and testing them for leaks at -15 C while the pointing team (Laura, Javier, Sam and Adrian) ran the payload through flight scenarios to find (and fix) any bugs in the flight code. We are doing some glorified plumbing to be able to protect the liquid helium on board the instrument from sucking in any of the atmosphere as we are on the ground waiting for launch and on ascent and also to get the detectors as cold as possible so that they have less thermal noise.
We were using these valves from Aalborg:

However, they are designed to be used in a room temperature laboratory setting for controlling flow rate and not in a cold vacuum environment for opening and closing tightly. So, as designed, they don’t do what we want – they leak a lot in the closed position when they get cold. So, since we can pop out to the local valve store down here (although we could get someone to buy some and send them on a flight from Christchurch), we opened them and rebuilt them. They have a stepper motor inside that moves a plunger up and down. However, the plunger is made of a hard piece of teflon and it shrinks when it gets cold and leaks. We had many designs for changing this plunger but after a while, we replaced it with a rubber stopper and demonstrated that it opened and closed reliably with no leaks. Then we put the valve back together and plugged it in to the power supply to open it again and…no current. We had somehow fried the stepper motor driver board! We were about to cut the wires and take apart another valve and replace the board when we thought to check and compare the boards. We noticed that the other board had several jumpers across pins on the board and the one we were using was missing one of those jumpers. It was very small and hard to find, but was lying on the floor under the leak checker. We put it back on and plugged in and…it worked!
Also yesterday, Mark took me to the telemetry building and asked the folks their if they had any tinted safety goggles since I forgot to bring sunglasses and have been wearing the ski goggles they provide because they ran out of sunglasses at the McMurdo store. These are pretty nice I think.

Here is Federico still drilling into the gondola (yesterday) and Ian mounting the valves (today).
We are still on for the compatibility test tomorrow night. Then launch hopefully wednesday or thursday. Happy holidays!
Friday, December 20
Today – since I stayed late last night, I came in at around 11 am and went to the weather briefing. The latest news is that there is a possibility for a compatibility test late Sunday night. Hopefully the weather will improve after that as well. We are going to do more valve testing and pointing today. People are still drilling and gluing stuff on the gondola although if we had to we could go ahead and fly.
Catching up – on wednesday after the sun sensor calibration when we got back to McMurdo it was beautiful and sunny but the winds were picking up. I convinced Mark to go on one of the area hikes the Arrival Heights loop which passes by Scotts hut at hut point and then goes up the Western (I think) ridge of Ross Island to near to arrival heights. On the way, we first passed a field where it looked like people were playing baseball (it was softball). This is the area near the dock where the icebreaker will unload cargo later in the season.
After that, we went out to hut point and looked for more penguins but there were just seals sunning themselves. Then we headed up the ridge and as we got higher, the wind really started picking up. It was so strong that we had to zip up our “big red” parkas they provide for extreme cold weather and walk a little bit to the windward side of the path to make sure we weren’t blown off of the island. These pictures don’t really convey the extent of this very authentic “Antarctic experience”. This was maybe 20-25 mph winds in about 32 F. I don’t know how the early explorers survived in much more extreme conditions.
Yesterday, the weather was still too windy for taking the telescope outside so we did a Helium transfer in the morning and then tested some of the modified Aalborg valves. These are metering valves that we bought to open and close lines between the Helium tank and either pumps or the atmosphere. However, they leak quite a lot when closed especially when they get below freezing temperature. So Federico and Mark modified two of them to make them close more reliably and in the cold. Giles and I tested these valves at room temperature and at -20 C using a cooler full of dry ice.
Federico’s valve worked great – we cycled it 10 times while cold and leak checked it.
Mark’s valve worked fine the first three cycles at room temperature and then it developed a leak when “closed”.
While we were doing this, the pointing team with the readout team were moving the gondola around in some simulated scans. They found some bugs in the code that we hadn’t seen before and are fixing them.
Also, Gabriele and Adrian have been working on analyzing data from the detectors taken with a hot source during the receiver tests. Gabriele was happy with his first map of this source.

Also today, one of the galley staff, Rose, asked if we would help pose for a poster advertizing a “hot yoga in your big red” session on new years day to help people recover from the festivities and start the new year right. The idea is that everyone will come wearing their “big red’ parka and do yoga – making it very hot. We helped out by doing our best yoga poses outside the high bay.

We got a ride back at around 10 pm in a shuttle. This was the first time this season that I had seen the scenery in the night sunshine which is particularly beautiful. Here are some pictures from the shuttle.
Thursday, December 19
Yesterday the weather was nice and sunny all day and although the winds were supposed to pick up after noon they stayed pretty low so at around 4 pm when the sun was positioned such that it would shine directly into the high bay, we ended up opening the high bay and moving the gondola outside on the crane to calibrate the sun sensors.

Update – we are not doing compatibility today. The next two days the weather is also supposed to be bad. So next opportunity for compatibility is now Sunday.
Last night, there were penguins off of hut point. Sam and Adrian went with Emilie to see them. See if you can spot them in this picture from Sam (overlooking the sea ice from hut point).

Wednesday, December 18
Missed posting yesterday. A lot happened and we were pretty busy. On Monday, the day after the SuperTiger launch, all of the CSBF team had the day off to recover from their 20 hours of work. We came in at the usual time on a Delta and got to work making the last modifications to the BLAST instrument before our flight.
Most of the hardware work involved finishing installing the on-board pumping system for the Helium coming out of the 1 K pump pot. The Penn team had purchased two small dry (scroll) pumps which only required 25-40 Watts of power to pump on the Helium. The original plan had been to vent the pump pot to the low atmospheric pressure at the balloon altitude – i.e. use the vacuum of space to pump on our Helium. However, we calculated that the pressure even at 120,000 ft. is not low enough to get our detectors as cold as we would like. Also, we would have to have the vent valve closed while we are on the ground before launch and the detectors would be warm so we wouldn’t be able to know how everything was working just before launch and on ascent. By using pumps on the gondola, we could keep everything running all the time and get to a lower temperature and better sensitivity.
As with any modification to the system, the installation of the new pumps was not going so smoothly. First of all, we had found that the valves we were planning to use leaked when they got below 0 C. We had solved that problem by using different spare valves that we had laying around and most of Monday was spent building a mounting assembly for the pumps and valves. We planned to return to McMurdo fairly early on Monday and shuttle ops sent a Delta to pick us up around 5.30 pm. However, when we went outside to the meeting point, we could see the Delta in the distance tilted at an angle not unlike the angle of our shuttle the day before – it had gotten stuck in the snow! The driver, Jake, was very embarrassed and helpful in getting us another ride back to town. However, the first shuttle that tried to come pick us up also got stuck so we all had to wait for Fleet ops to send a track vehicle and pull everyone out. After about an hour and a half, we finally got on the Delta and rode back to town and went to hang out in the coffee house with some of the people we met in Christchurch and then watched part of the movie Salt.
On Tuesday, we found that after we mounted the pumps on the gondola, they were getting too hot when we turned them on. Also, they were using a lot more power than we had estimated from tests at Penn. We figured out that the additional power was because the tests at Penn were done in a vacuum chamber approximating the conditions at float altitude but when the pumps were pumping to a full atmospheric pressure they used more power. This was ok since they would only be doing that while we are on the ground. The high temperature was a problem and meant that we needed to heat sink the pumps better. Ian and Caleb made some radiating heat sinks out of copper and the rest of the team glued on the water filled copper heat pipes that we also use to cool our electronics.
Here is a picture of Ian and Caleb soldering the copper straps together for the heat sink. They had to go outside to use the propane torch for soldering. The pump assembly and heat sinks are shown on the right behind the batteries for the gondola power.
Fortunately, the weather was getting better and I could finally see Mt. Erebus for the first time this trip. The weather has been unusually cloudy and snowy – one of the reasons why the flights were delayed on our way down.
Sam, Adrian and I spent Monday and Tuesday working on understanding the data from the detector tests that they had done while we were waiting in Christchurch. Adrian made some beam maps of the different arrays from tests where we had used a two lens warm reimaging optics system to reimage the focal planes in the lab. The lenses had been designed by me and Adrian and they appeared to work very well. This was great because it meant that the cold optics inside the cryostat seems to be working as designed as far as we can tell. We won’t know exactly how it is working until we are at float and observe some of our calibration sources. Sam and I worked on understanding the sensitivity of the system from the measurements of responsivity and noise looking at blackbody sources with known temperatures (300 K and 77 K). After fixing a bug in the analysis code, we were able to see the difference between the noise in the data stream from the detectors in “frequency space” compared to “dissipation space” which means that we could see that the superconducting resonator detectors were jiggling more in frequency than they were in amplitude as we expected. From this we could measure the optical efficiency of the system and the absorbed power and sensitivity. All of the results agreed with our expectations and we were pretty happy about that. Like with the beams, we won’t know the sensitivity in flight until we are at the float altitude because the sensitivity will depend on how much loading or incident optical power there is from the telescope and atmosphere and from the inside of the cryostat. We know from our measurements in the lab that the stray light from inside the cryostat is significantly less than from our 77 K load.
Also on Tuesday, the CSBF team was back and the weather was good so they decided to try for a launch of the small super pressure balloon Barrel and then take us out of the high bay for a communications test that is required to prepare us for a launch opportunity. To be ready for flight, we need to pass the communications test, calibrate our pointing sensors which we usually do by taking the gondola out to the “dance floor” on the edge of the launch pad and then doing a full “compatibility test” while hanging on the launch vehicle. This should take a couple of days but we need good weather. Today, we were hoping to get the first two done or at least the communications test.
But first, there was an attempt to launch Barrel. Unfortunately, as they were inflating the balloon, the inflation tube came out and it deflated again.
The pictures show the Barrel balloon during inflation, the small balloon launch pad in the distance, which is also the “dance floor” we use for pointing sensor tests and a CSBF person releasing a Pi-ball test balloon to measure the wind direction and speed. The launch was scrubbed around noon and after lunch we prepared to take BLAST out of the high bay.
Here are some pictures of the BLAST team on the mezzanine overlooking BLAST. After the campaign last year, Federico wrote a book in Italian and it was published and is doing well. It is called “La Esperienza Del Cielo” which means “The Experience of the Sky”. I skimmed it – it mentions mylar.
We opened the high bay doors and the riggers came by and lifted the gondola and took it outside. Then it sat there for about 4 hours while we tested the different communications systems.
Here are some pictures of it outside. Mark and I walked to the dance floor and shoveled the snow off of it. It was pretty warm – around freezing at LDB and 35-37 F in McMurdo. Lots of people out in tee shirts.
Sam, Adrian and I took the early shuttle back and then looked at data remotely from Sam and Adrian’s dorm room.
Monday, December 16
The internet is back – there were three days of scheduled maintenance when the internet was down for 12 hours each day. Now it is back and is probably a bit faster than normal because all of the NASA/CSBF team are asleep today. That is because this morning at 2.55 am they launched the SuperTiger payload! Flight tracking information is at: https://www.csbf.nasa.gov/map/balloon11/flight706n.htm
SuperTiger is an experiment to measure cosmic rays from space before they interact with particles in the atmosphere. These energetic particles are constantly bombarding the earth and are one of the main challenges to making space-qualified electronics that have to be resistant to getting zapped. We are protected from the most damaging cosmic rays on the surface of the earth by the earth’s atmosphere which serves as a shield that converts high energy cosmic rays into showers of lower energy particles such as electrons and muons. The earth is also protected by its magnetic field which deflects the cosmic rays near the equator but funnels some of them towards the magnetic poles. This is why a balloon over Antarctica is a good place to measure these cosmic rays.
Here are a couple of pictures of the SuperTiger payload on the launch vehicle yesterday afternoon as they were being driven to the launch pad.
But let me take a few steps back and get caught up on this year’s campaign…
Last year, the BLAST-TNG team came to Antarctica along with three other balloon payloads: X-Calibur, SuperTiger and Barrel. All of the other three payloads were launched during the 2018/2019 season. BLAST was assembled and prepared for launch and after a lot of work and some drama (see the other blog pages on this web site for Antarctica 2018/2019 details) was declared flight ready near the end of December, 2018.
There were four possible launch attempts but primarily due to bad weather, BLAST was not able to launch before the end of the season. We left the telescope and gondola assembled in the high bay over the Antarctic winter and have come back this year to launch it along with SuperTiger and Barrel again.
Last year, SuperTiger was the first large payload that was launched but it had a leak in the balloon and the flight lasted less than one day, with the payload coming down in the Asgard range of mountains other side of the sea ice to the West (I think – sometimes directions get turned around down here) of Ross island. After the BLAST team left, a recovery team found the SuperTiger payload and brought it back also to wait over the winter for another launch attempt this year. In addition, the Barrel experiment which is another smaller cosmic ray experiment studying the Van Allen belts, had a 73 day (new record?) flight after their successful launch last year. Their payload is about the size of a dorm room refrigerator and is launched by “hand” on a smaller superpressure balloon. They do not recover their instrument which falls into the Antarctic ocean when it is cut down but they have built another one and are back again this year for another launch as well.
So, we have a lot of the same people back in the long duration balloon (LDB) facility in Antarctica that were here last year.
Here is a picture of me and the Barrel PI, Robyn Millan, from Dartmouth.

I met one of her former students, Julianna, who works at SpaceX in August and mentioned that I worked on balloon experiments. She asked me if I knew her undergrad supervisor, Robyn, and I said that I didn’t remember but probably knew her because the ballooning community is pretty small. When she mentioned that she was PI for Barrel, I was embarrassed because I had just spent 6 weeks working next to her in the high bay in Antarctica the previous winter. So, when I got here this year and saw Robyn, I told her this story – before I started though, when I said “Hello Robyn, good to see you again.”, her response was, “Who are you?” So I didn’t feel so bad after all.
Now that SuperTiger has launched, we are busy getting everything on our telescope ready for good weather because we are next. All of the NASA/CSBF people are taking the day off so today there are only about 15-20 people out at the LDB base. We have 14 people on the ice on the BLAST team. Mark, James and I were the last three to arrive three days ago on December 13 after waiting for 11 days in Christchurch, New Zealand for the weather and runway and airplanes to all come together to allow the C-130 flights to be allowed to fly down.
Fortunately, while we were waiting, the rest of the BLAST team (Ian, Gabriele, Adrian, Sam, AJ, Giles, Laura, Javier, Paul, Caleb, Federico and Nate for a few weeks) was working hard getting the instrument put together and tested. Even though we had left everything put together after the last season, there was still a lot of work to do to get back to being flight ready. Some of the things that we had planned to do were: i) replacing the cryogenic amplifiers and checking the signal chains, ii) we designed a system which we brought down to test the camera optics before attaching it to the telescope, iii) adding some low power vacuum pumps to continuously pump on the liquid helium in our 1 Kelvin pumped pot which before would just have vented to the atmosphere once we were in the low pressure environment at the final balloon altitude.
All of the testing and upgrades had been going well and while we were in Christchurch, we received some updates on progress and had a couple of calls with the team from the Crary science building in McMurdo. Many of the other people there were waiting to go along with their teams and each day that passed was a day less they had to do their work on the ice. For us, Christchurch was a gilded cage – every afternoon we received a note under our hotel door with a scheduled pick up time the next morning for our flight. Then in the morning we either got a phone call or another note telling us that the flight was “delayed by 24 hours” and we should wait for our new hotel information. Sometimes, we were able to stay in the same hotel and same room for multiple nights in a row but several times, we had to move to another hotel because we only were reserving a room for one night at a time and the hotels were pretty full this time of year.
I arrived in Christchurch on December 2 after a long series of flights from Phoenix, AZ – LA, LA – Auckland, NZ and then Auckland – Christchurch. Because of the time zones, you lose a day traveling west to New Zealand so even though the trip was only about 24 hours, I arrived two days after I left. Christchurch is on the South island near the middle of the island on the East coast. It is in an active area for earthquakes and suffered serious damage from a large earthquake and aftershocks in 2009-2010 when many of the older stone construction buildings were destroyed. I had never spent more than 2 nights in Christchurch on my way down to the ice so I hadn’t really gotten to know it very well until this year.
The first day, I arrived in the morning and was met at the airport along with about 10 other people going down to the ice and then taken to the hotel. We just missed the last C-17 flight which left the next morning – when we went back to the airport to get our cold weather gear at the Antarctic Clothing Distribution Center (CDC) which we would bring down again. Having done this last year, everything was very familiar. We were then told that there were three scenarios for flights down – one was a flight that night, the second was a flight the next day and the third was a flight in two days. We ended up staying 11 days – for various reasons but certainly one of them is that it was snowing in McMurdo for several days in a row.
Flights down to the ice are on military planes, either a C-17 which is a very large 4 jet engine cargo plane or a C-130 which is the workhorse 4-propellor engine cargo plane used for many years. I had also flown in the past on a C-5 which is like the C-17. The flights are operated by the New York Air National Guard, the Italian Air Force and the New Zealand Air Force. The flights take from 5 hours to 8.5 hours depending on the airplane and weather. Landing is more difficult on the ice runways than taking off and the main requirements are low winds and good visibility. Snow, fog or low cloud all reduce visibility and since there is no contrast with the white of the ice runway and the white of the clouds or snow it is very difficult to land in those conditions. Mark and I were scheduled to fly on an Italian operated flight. We were told that there would be a delay of a couple of days.
While waiting, we took advantage of the time and internet connection to catch up on work and also started to explore around the town and surrounding area. One of the first things we did was to visit the botanical gardens in Christchurch. There is a really impressive rose garden there that I have visited each time I have passed through.
The third day, we had to move to a different hotel and I ran into another ASU person, Emilie, on her way to Antarctica to hunt for meteorites with the meteorite hunting team. This group goes into the field, brings their food and sleep in tents while they search certain areas for interesting meteorites which are easier to find and better preserved in the Antarctic environment than in most other places in the world. On the 4th day, they rented a scooby doo type van and I caught a ride with them to the Hanmer Springs resort which consisted of a hot springs, spa and water park. Here is a picture of the meteorite team on the way to the springs
The scenery on the way was impressive – this is summer in New Zealand.

We also went on a couple of hikes along the coast and had to try out a number of restaurants in town. As I said – a gilded cage…
Finally, after so many cancelled notices, we were told to report for checkin (for the second time) and made it onto the bus to the plane. We had a C-130 with no skis – all of the other C-130s I had been on were LC-130s which meant they had skis to land on snow and ice. I was nervous because the wheels were only good for the ice runway which closes later in the season and I thought it was getting pretty late. I was also nervous because, we had heard the day before that a C-130 from Chile had disappeared on its way to Antarctica about 1 hour after takeoff. To top it all off, we were flying on Friday the 13th.
The plane was pretty full and very loud. I had remembered to bring noise cancelling headphones this time so I put them on when they turned on the props. The flight down was very smooth for the first 4.5 hours and we could see the sea ice and the first mountains on the continent already – we were making good time. Then, fairly suddenly the plane started to descend quickly as though we were going to land.
We thought we should still be at least one hour from McMurdo. I kept looking at the Italian flight crew member who was sitting next to Mark who would look back and smile and give us a thumbs up. After a few turns, we started ascending again. Then after another hour or so, we descended again and then felt the wheels touch down – it seemed early but we had arrived at McMurdo.
We landed at the Pegasus ice airport and took the Kress vehicle to McMurdo where we had a briefing and got our room assignments. We met up with some of the BLAST team in the galley over dinner, picked up our bags and ended up our first evening on the ice in the “Southern” bar buying drinks for the Italian air crew.
The first full day on the ice, Mark, James and I had to watch training videos and briefings all morning long. Fortunately, the schedule was for everyone to go to the LDB at 1 pm because there was a chance that the weather would be good enough to launch the smaller Barrel balloon. Sam was not feeling well – was getting over a fever – and stayed back in town. I got started to get caught up with Adrian on the detector status and test results and Mark put thin Aluminized mylar tape over the spots on the primary mirror where water had damaged the surface during layovers in New Zealand on the way to the ice last year. The experiment is almost completely ready but while Mark, James and I were in NZ, the team on the ice realized that a couple of valves that we had planned to use for helium lines were not rated below zero degrees centigrade and they observed them to fail in a vacuum test outside of the high bay. We formulated a plan to replace these valves with some spares we had for other things and change the pumping configuration. We then started to implement it but did not finish by the time we headed back to town. We will hopefully finish tomorrow (December 15).
Here are some pictures of the experiment and the mirrors.
Here are some more BLAST selfies using the telescope.
Today is day three for me on the ice.
December 15
Hello everyone – We are back! BLAST-TNG is having deja-vu again in Antarctica. We left our telescope assembled in one of the two high bays on the Ross Ice Shelf one year ago after a somewhat heroic attempt to launch it on a NASA stratospheric balloon was ultimately called off because we ran out of time as the weather started breaking up.
I am in my second day on the ice. Many of the team have been here for over a month though so there is a lot to catch up on. So much is the same (inlcuding the slow internet), it feels like we never left and that life in the “real world” may just be a dream after all.
On the way in today, we got stuck in the snow. I won’t say who was driving but his initials are Paul. Since it was Sunday, there were not other regular shuttles driving on the road but we were lucky to flag down a very nice weather woman named Amber who first tried to help us dig out and then when we agreed it was not possible gave all but two of us a ride to the LDB base. The two remaining people waited for someone from Fleet Ops to send a tractor to pull the van out of the snow. It took them 3 hours to finally make it to LDB.

Sam came in today and worked on detector code while everyone was busy with final modifications.
Mark, James and I had a last safety briefing in the afternoon and then we were as qualified as the safety snowman.

We stayed until about 9 pm when they started to drive SuperTiger out to the launch pad. Kaija the site manager gave us some flags and a rope to hang across the LDB road as we left to close it to traffic for the launch attempt.